Navien NCB-250 High-Efficiency Condensing Combination Boiler Installation Guide
- June 12, 2024
- Navien
Table of Contents
Model
NCB-250/150H, 240/130H, 240/1 10H, 190/080H, 190/060H
STEP 1 Before Installing
Read the Installation & Operation Manual before installing.
This product must be installed and serviced by a licensed plumber, a licensed
gas fitter, or a professional service technician. Navien is not liable for any
damages or defects resulting from improper installation.
When applicable, the installation must conform with Manufactured Home
Construction and Safety Standard, Title 24 CFR, Part 3280 and/or CAN/CSA Z240
MH Series, Mobile Homes.
WARNING
Follow all local codes and/or the most recent edition of the National Fuel Gas
Code (ANSI Z223.1/NFPA 54) in the USA, or the Natural Gas and Propane
Installation Code in Canada (CAN/CGA B149.1).
Safety
DO NOT install the boiler in areas with excessively high humidity.
Location Requirements
Select the best location on “Choosing an Installation” in the Installation &
Operation Manual.
Allowable minimum clearances
Clearance | Indoor Installation |
---|---|
Top | 9in (229 mm) minimum |
Back | 0.5 in (13 mm) minimum |
Front | 4 in (100 mm) minimum |
Sides | 3 in (76 mm) minimum |
Bottom | 12 in (300 mm) minimum |
STEP 2 Installing
Unpacking
Checking the Rating Plate
This boiler is configured for Natural Gas from the factory. If conversion to Propane Gas in required, the conversion kit supplied with the boiler must be used.
WARNING
Before connecting the gas supply, determine the gas type and pressure for the
boiler by referring to the rating plate. Use only the same gas type indicated
on the rating plate. Using a different gas type will result in abnormal
combustion and malfunction of the boiler. Gas supplies should be connected by
a licensed professional only.
The appliance and its gas connection must be leak tested before placing the
appliance in operation.
This boiler cannot be converted from natural gas to propane or vice versa
without a Navien gas conversion kit. Do not attempt a field conversion of this
boiler without a Navien gas conversion kit. Doing so will result in dangerous
operating conditions and will void the warranty.
Navien Inc. is not liable for any property damage and/or personal injury
resulting from improper conversions.
Mounting on the Wall
CAUTION
Do not install the boiler on dry walls without proper reinforcement.
-
Drill in the supplied anchor bolts after considering where the vent termination will be located.
-
Secure the mounting bracket to the wall WITH the tapping screws and anchors.
Lift up the boiler, rest the unit on the hooks provided on the wall bracket on the wall.
Removing the Front Cover
Unfasten the 4 latches (2 at the top and 2 at the bottom) to remove the front cover and gain access to the internal components.
Gas Piping Connections
Example:
Gas meter
425 CFH| Boiler
195 CFH| Furnace
58.8 CFH| Domestic gas stove
63.7CFH
---|---|---|---
*1 CFH=1,020 Btuh
1/2 rigid pipe can be used; refer to the sizing tables in the Installation &
Operation Manual for limitations. Avoid using ‘/” corrugated connectors or
tubing as noise may occur .
Water Piping Connections
Space Heating System
Install the included 3/4 in, maximum 30 psi pressure relief valve on the space
heating supply.
An ASME approved HV pressure relief valve for space heating system is supplied
with the boiler.
DHW System
The DHW pressure relief valve is not supplied, but is required.
Install an approved 3/4 in, maximum 150 psi pressure relief valve on the
domestic hot.
Water Piping Connections
Filling the System
Before filling the boiler, open the pressure relief valve by lifting the lever
on top, and loosen the air vent cap to allow the system to fill properly.
Close the pressure relief valve when the system is full.
CAUTION
Ensure that the pressure relief valve is closed before testing or operating
the system.
Built-in Water Fill Connection
The Navien NCB-H boiler is equipped with an auto-feeding water connection and
motorized feeding valve. Therefore, installation of additional system water
fill connection is not necessary in most cases. See the following figure for
an example of a water fill installation using the built-in connection.
External Water Fill Connection
External water fill connection may be installed on the system piping if it is
required for specific applications. See the following figure for an example of
external water fill installation on the system piping.
Condensate Drain Connection
A condensate drain pipe must be connected to the 1/2″ condensate outlet
fitting at the bottom of the unit and water must be poured into the exhaust
connection to fill the condensate trap.
The end of the 1/2″(NPT) plastic piping should drain into a laundry tub or into a floor drain.
Note
Do not submerge the end of the pipe in water.
Ensure Maximum Water Flow
After running the boiler for the first 1 O minutes, turn it off and clean the
cold water filter and the space heating return strainer to remove any trapped
debris.
Final Check
A trial run should be performed in accordance with the Installation checklist
listed in the boiler’s Installation & Operation Manual.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>