seeed studio Industrial Reserver Installation Guide
- June 12, 2024
- seeed studio
Table of Contents
seeed studio Industrial Reserver
Package Content
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
---|---|---|---|---|---|---|---|
120°-KM3.0 x L5.0 | PM3.0 x L7.0 | PM2.5 x L4.0 | **PM3.0 x | ||||
L4.0** | Stud-M3 x 6.5+M2 x 2.0 | CM2.0 x L3.0 | CM3.0 x L6.0 |
Stud-M3 x 16.0+4.0
Note : the LoRaWAN®/4G/5G/Series Wireless modules and 2.5″ SATA HDD/SSD used in the following installation instructions are not included in the device and are optional.
SATA HDD/SSD Installation Guide
Loosen these two screws.
Remove the panel.
Remove the two screws and slowly pull the Drive Bays out.
Install/remove these 4 screws.
Push the drive bays inside along the bracket tracks slowly.
Lock the drive bays with screws.
Install the panel, making sure that the protrusions of the panel line up with
the grooves on the bottom of the device.
Lock with two screws.
Assembly Guide
Remove the six screws from the bottom.
If you need to replace the SSD, remove the screw, and gently remove the SSD
module.
If you need to install a LoRaWAN® module, insert the LoRaWAN® module into the
Mini PCIe interface (lower interface) and lock it with two screws. If you need
to install a 4G/5G module, insert the 4G/5G module into the M.2 Key B
interface (upper interface) and lock it with one screw. Please note that only
one module can be installed at a time on these two interfaces.
Install the TPM module in the correct orientation.
This step is only necessary if you need to remove the carrier board.
Remove the two SATA data and power cables and remove the 4 screws on both
sides.
Lock them with six screws.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>