seeed studio reComputer Industrial Installation Guide

June 12, 2024
seeed studio

reComputer Industrial

Assembly Guide

1

| 2| 3| 4| 5
---|---|---|---|---
| | | |

KM3.0 x L32.0

| 120°-KM3.0 x L5.0| CM3.0 x L4.0| CM2.0 x L3.0 |

Stud-M3 x 6.5+M2 x 2.0

Step 1

Remove the four screws from the bottom.

Step 2

seeed studio reComputer Industrial A2

Remove the two side panels.

Step 3

Remove the rear case.

Step 4

Remove the four fixing screws of the carrier board.

Step 5

If you need to replace the SSD, remove the screws, and gently remove the SSD module.

Step 6

If you need to install a LoRaWAN® module, insert the LoRaWAN® module into the Mini PCIe interface (lower interface) and lock it with two screws. If you need to install a 4G/5G module, insert the 4G/5G module into the M.2 Key B interface (upper interface) and lock it with one screw. Please note that only one module can be installed at a time on these two interfaces

Step 7

Install the carrier board and lock it with four screws.

Step 8

Install the rear case.

Step 9

seeed studio reComputer Industrial A9

Install the two side panels

Step 10

Lock them with four screws.

Step 11

Documents / Resources

| seeed studio reComputer Industrial [pdf] Installation Guide
reComputer Industrial, reComputer, Industrial
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

seeed studio User Manuals

Related Manuals