seeed studio reComputer Industrial Installation Guide
- June 12, 2024
- seeed studio
Table of Contents
reComputer Industrial
Assembly Guide
1
| 2| 3| 4| 5
---|---|---|---|---
| | | |
KM3.0 x L32.0
| 120°-KM3.0 x L5.0| CM3.0 x L4.0| CM2.0 x L3.0 |
Stud-M3 x 6.5+M2 x 2.0
Step 1
Remove the four screws from the bottom.
Step 2
Remove the two side panels.
Step 3
Remove the rear case.
Step 4
Remove the four fixing screws of the carrier board.
Step 5
If you need to replace the SSD, remove the screws, and gently remove the SSD module.
Step 6
If you need to install a LoRaWAN® module, insert the LoRaWAN® module into the Mini PCIe interface (lower interface) and lock it with two screws. If you need to install a 4G/5G module, insert the 4G/5G module into the M.2 Key B interface (upper interface) and lock it with one screw. Please note that only one module can be installed at a time on these two interfaces
Step 7
Install the carrier board and lock it with four screws.
Step 8
Install the rear case.
Step 9
Install the two side panels
Step 10
Lock them with four screws.
Step 11
Documents / Resources
|
seeed studio reComputer
Industrial
[pdf] Installation Guide
reComputer Industrial, reComputer, Industrial
---|---