ROBB DIY-ZG9101-RGBW-KIT DIY ZigBee RGBW Light Strip Kit User Manual
- June 12, 2024
- ROBB
Table of Contents
- ROBB DIY-ZG9101-RGBW-KIT DIY ZigBee RGBW Light Strip Kit
- Product Usage Instructions
- Function introduction
- Operation
- TouchLink to a Zigbee Remote
- Factory Reset Manually
- Find and Bind Mode
- Learning to a Zigbee Green Power Switch
- Delete Learning to a Zigbee Green Power Switch
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
ROBB DIY-ZG9101-RGBW-KIT DIY ZigBee RGBW Light Strip Kit
Product Information
Product Name: DIY ZigBee RGBW Light Strip Kit
Components:
- Power adapter (EU, US, Australia versions available)
- RGBW LED controller
- 2-meter RGBW light strip (3-meter available upon request)
Specifications:
-
Power Adapter: Input Voltage: 100-240VAC,
50/60Hz; Output Voltage: 24VDC; Output Current: 1.5A; Output Power:
36W; Output Type: Constant voltage -
RGBW LED Controller: Input Voltage: DC 12-24V;
Output Current: 4×1.5A max.; Max Output Power: 72-144W; Output
Type: Constant voltage; Dimension (LxWxH): 84x20x14mm
Product Usage Instructions
- Plug the connectors correctly and plug the adapter into a socket, then power on.
- This ZigBee device is a wireless receiver that communicates with a variety of ZigBee compatible systems. This receiver receives and is controlled by wireless radio signals from the compatible ZigBee system.
- To pair the device with a Zigbee network:
- Remove the device from any previous Zigbee network it may have been added to. Please refer to the Factory Reset section for instructions.
- From your ZigBee Controller or hub interface, choose to add a lighting device and enter Pairing mode as instructed by the controller.
- Reset the power of the device to set it into network pairing mode (connected light flashes twice slowly) within a 15-second timeout. Repeat this step if necessary.
- The connected light will blink 5 times and then stay solid on, indicating that the device has successfully paired with the controller. It will appear in your controller’s menu and can be controlled through the controller or hub interface.
- To control the W channel separately from the RGB channels:
- Use the Gateway’s color temperature control interface to mix the RGB channels as 1 channel white and then make color tuning with the 4th channel white. The brightness of the white channel will be controlled together with the RGB channels.
- Use an RGBW Zigbee remote or touch panel’s W button to control the W channel separately from the RGB channels. Please refer to their respective manuals for detailed instructions.
- To perform TouchLink to a Zigbee remote:
- Method 1: Reset the power of the device 4 times to start Touchlink commissioning immediately under any circumstances, within a 180-second timeout. Repeat this step if necessary.
- Method 2: Reset the power of the device.
Touchlink commissioning will start after 15 seconds if it’s not added to a Zigbee network, with a 165-second timeout. If it’s already added to a network, it will start immediately with a 180-second timeout. Once the timeout is reached, repeat this step.
Important: Read All Instructions Prior to Installation
Function introduction
- Power adapter, available in EU, US, Australia versions
- Power output male connector,connect to LED controller’s power input connector
- Power input female connector,connect to power adapter’s power output connector
- RGBW LED controller
- 5 pin male connector, connect to the light strip female connector, please make sure the pin with the arrow mark is connected to the common anode DC24V+ on the strip
- 2-meter RGBW light strip, 3- meter available upon request
Power Adapter Data
Input Voltage | Output Voltage | Output Current | Output Power | Output Type |
---|---|---|---|---|
100-240VAC, 50/60Hz | 24VDC | 1.5A | 36W | Constant voltage |
RGBW LED Controller Data
Input Voltage | Output Current | Output Power | Output Type | Dimension (LxWxH) |
---|---|---|---|---|
12/24VDC | 4CH, 1.5A/CH | 72W@12V, 144W@24V | Constant voltage | 84x20x14mm |
Note:
- Wchannel can be turned on through Gateway’s color temperature control interface which will mix RGB channels as 1 channel white and then make color tuning with the 4th channel white. Once turned on, the brightness of white channel will be controlled together with RGB channels.
- Wchannel can be controlled separately from RGB channels through RGBW zigbee remote or touch panel’s W button, please refer to their manuals.
- DIY Zigbee RGBW light strip kit based on latest ZigBee 3.0 protocol
- Power adapter, RGBW LED controller, RGBW strip all included
- Power adapter for different countries available: EU, US, Australia etc.
- Plug and Play, no wiring required
- Place anywhere and bend to any shape, free to shape your lighting style
- Wchannel can be controlled through Gateway’s color temperature control interface
- Wchannel can be controlled separately from RGB channels through RGBW zigbee remote or touch panel’s W button
- Supports self-forming zigbee network without coordinator
- Supports zigbee green power and can bind max. 20 zigbee green power remotes
- Enables to control ON/OFF, light intensity and RGB color of connected RGBW LED lights
- ZigBee end device that supports Touchlink commissioning
- Supports find and bind mode to bind a ZigBee remote
- Compatible with universal ZigBee gateway products
- Waterproof grade: IP20
Safety & Warnings
- DO NOT install with power applied to device.
- DO NOT expose the device to moisture.
Operation
- Plug the connectors correctly and plug the adapter to a socket, then power on.
- This ZigBee device is a wireless receiver that communicates with a variety of ZigBee compatible systems. This receiver receives and is controlled by wireless radio signals from the compatible ZigBee system.
- Zigbee Network Pairing through Coordinator or Hub (Added to a Zigbee Network)
Step 1: Remove the device from previous zigbee network if it has already been added to, otherwise pairing will fail. Please refer to the part “Factory Reset Manually”.
Step 2: From your ZigBee Controller or hub interface, choose to add lighting device and enter Pairing mode as instructed by the controller.
Step 3: Reset power of the device to set it into network pairing mode (connected light flashes twice slowly), 15 seconds timeout, repeat this step.
Step 4: Connected light will blink 5 times and then stay solid on, then the device will appear in your controller’s menu and can be controlled through controller or hub interface.
TouchLink to a Zigbee Remote
Step 1:
Method 1: Reset power of the device 4 times to start Touchlink commissioning
immediately under any circumanstances, 180S timeout, repeat this step.
Method 2: Reset power of the device, Touchlink commissioning will start after
15S if it’s not added to a zigbee network, 165S timeout. Or start immediately
if it’s already added to a network, 180S timeout. Once timeout, repeat this
step.
Step 2: Bring the remote or touch panel within 10cm of the lighting device.
Step 3: Set the remote or touch panel into Touchlink commissioning, please refer to corresponding remote or touch panel manual to learn how.
Step 4: There shall be indication on the remote for successful link and connected light will flash twice.
Note:
- Directly TouchLink (both not added to a ZigBee network), each device can link with 1 remote.
- TouchLink after both added to a ZigBee network, each device can link with max. 30 remotes.
- To control by both gateway and remote, add remote and device to network first then TouchLink.
- After TouchLink, the device can be controlled by the linked remotes.
Removed from a Zigbee Network through Coordinator or Hub Interface
Factory Reset Manually
Step 1: Reset power of the device for 5 times continuously.
Step 2: Connected light will blink 3 times to indicate successful reset.
Note:
- If the device is already at factory default setting, there is no indication when factory reset again .
- All configuration parameters will be reset after the device is reset or removed from the network.
Factory Reset through a Zigbee Remote (Touch Reset)
Note: Make sure the device already added to a network, the remote added to the same one or not added to any network.
Step 1: Reset power of the device to start TouchLink Commissioning, 180 seconds timeout, repeat this step.
Step 2: Bring the remote or touch panel within 10cm of the lighting device.
Step 3: Set the remote or touch panel into Touch Reset procedure to reset the device, please refer to corresponding remote or touch panel manual to learn how.
Step 4: There shall be indication on the remote and connected light flashes 3 times for successful reset.
Find and Bind Mode
Step 1: Reset power of the device (initiator node) 3 times to start Find and Bind mode (connected light flashes slowly) to find and bind target node, 180 seconds timeout, repeat this step.
Step 2: Set the remote or touch panel (target node) into find and bind mode, and enable it to find and bind initiator, please refer to corresponding remote or touch panel manual.
Step 3: There shall be indication on the remote or touch panel that it bind the device successfully and can control it then.
Learning to a Zigbee Green Power Switch
Step 1: Reset power of the device 4 times to start Learning mode to GP switch (connected light flashes twice), 180 seconds timeout, repeat this step.
Step 2: Set the green power switch into Learning mode, please refer to its manual
Step 3: Connected light will flash twice to indicate successful learning. Then the switch can control the device.
Note: Each device can learn to max. 20 zigbee green power switches.
Delete Learning to a Zigbee Green Power Switch
Step 1: Reset power of the device 3 times to start delete Learning mode to GP switch (connected light flashes slowly), 180 seconds timeout, repeat the operation.
Step 2: Set the paired green power switch into Learning mode, please refer to its manual.
Step 3: Connected light will flash 4 times to indicate successful deleting.
Setup a Zigbee Network & Add Other Devices to the Network (No Coordinator Required)
Step 1: Reset power of the device 4 times to enable the device to setup a zigbee network (connected light flashes twice) to discover and add other devices, 180 seconds timeout, repeat this step.
Step 2: Set another device or remote or touch panel into network pairing mode and pair to the network, refer to their manuals.
Step 3: Pair more devices and remotes to the network as you would like, refer to their manuals.
Step 4: Bind the added devices and remotes through Touchlink so that the devices can be controlled by the remotes, refer to their manuals.
Note:
- Each added device can link and be controlled by max. 30 added remotes.
- Each added remote can link and control max. 30 added devices.
ZigBee Clusters the device supports are as follows:
Input Clusters
- 0x0000: Basic
- 0x0003: Identify
- 0x0004: Groups
- 0x0005: Scenes
- 0x0006: On/off
- 0x0008: Level Control
- 0x0300: Color Control
- 0x0b05: Diagnostics
Output Clusters
- 0x0019: OTA
OTA
The device supports firmware updating through OTA, and will acquire new
firmware from zigbee controller or hub every 10 minutes automatically.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>