D-Link DQS-5000-54SQ28 Data Center Switch Installation Guide
- October 30, 2023
- D-Link
Table of Contents
- D-Link DQS-5000-54SQ28 Data Center Switch
- Product Information
- Product Usage Instructions
- Package Contents
- Device Interfaces
- LEDs
- Installation Guidelines
- Plugging in the AC Power Cord
- SNMP-based Management
- TECHNICAL SUPPORT
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
D-Link DQS-5000-54SQ28 Data Center Switch
Product Information
The D-Link DQS-5000-54SQ28 is a data center switch that comes with 48-port 25G SFP28 interfaces, 6-port 100G QSFP28 interfaces, 2 front-to-back AC PSUs, and 4 front-to-back fan modules. It is an L3 switch that offers 25 Gbps and 100 Gbps connection speeds and has a USB 2.0 port, a Mini-USB console port, and an RJ-45 management port. The switch also has LEDs that indicate the status of the power supply units, fans, and link/activity/speed per optical and RJ-45 ports.
Product Usage Instructions
- Open the shipping carton and check if all items are present and undamaged. If any item is missing or damaged, contact your local reseller for replacement.
- Visually inspect the power cord and ensure it is fully secured to both the power connector on the switch and the electrical outlet that supplies power.
- Install the switch in a cool and dry place within the acceptable operating temperature and humidity ranges.
- Install the switch in a site free from strong electromagnetic fields generators such as motors, vibration, dust, and direct exposure to sunlight.
- If you are installing the switch without a rack, attach the rubber feet included with the device on the bottom at each corner of the device’s base.
- Connect the switch to a PC using a mini USB console cable (included in the package) to configure it using the Command Line Interface (CLI).
Package Contents
Open the shipping carton of the switch and carefully unpack its contents. Please consult the packing list to make sure all items are present and undamaged. If any item is missing or damaged, please contact your local reseller for replacement.
- One DQS-5000-54SQ28 switch
- Two AC power cords
- One console cable (RJ-45 to RS-232)
- One console cable (mini-USB to RS-232)
- One console cable extension
- One rack mounting kit (two brackets and screws)
- Four rubber feet with adhesive backing
- One Quick Installation Guide
- Note: the model you have purchased may appear slightly different from those shown in the illustrations.
Device Interfaces
Model | Port | Description |
---|---|---|
DQS-5000-54SQ28 | 25GBase-X SFP28 ports | 48 SFP28 ports (25 Gbps connection |
speed).
100GBase-X QSFP28
ports
| 6 QSFP28 ports (100 Gbps connection speed).
USB 2.0 port| USB 2.0 Type-A port for connecting a USB storage device.
Mini-USB console port| Mini-USB console port for connecting to a PC with a
mini- USB console cable (included in the package). The Command Line Interface
(CLI) is used for configuring the switch.
10/100/1000Base-T RJ-45
management port
| Out-of-band management port for configuring the switch without being connected to the network (10/100/1000 Mbps connection speed).
LEDs
LED | Status | Description |
---|---|---|
PSU 1 | Solid green | The switch is powered on and functioning normally. |
Solid amber | The switch’s power supply has failed or is not working properly. | |
Light off | The switch is turned off. | |
PSU 2 | Solid green | The switch is powered on and functioning normally. |
Solid amber | The switch’s power supply has failed or is not working properly. | |
Light off | The switch is turned off. | |
FAN | Solid green | The fans are operating normally. |
Solid amber | A fan has failed. Check the FAN Status LED on the rear panel to |
identify which fan is malfunctioning.
| Light off| The fans are powered off.
---|---|---
STAT| Solid green| The diagnostic test was successfully completed.
Solid amber| The self-diagnostics system has detected a fault.
Light off| The system is down, the switch is booting up, or the network OS did
not boot up normally.
Link/Activity/Speed (per optical port)| Solid green| There is a secure 25/100
Gbps connection at the port.
Blinking green| There is reception or transmission occuring at the port.
Solid amber| There is a secure 10/40 Gbps connection at the port.
Blinking amber| There is reception or transmission occuring at the port.
Light off| No link.
Link/Activity (per RJ- 45 port)| Solid green| There is a secure 1000 Mbps
connection at the port.
Blinking green| There is reception or transmission occuring at the port.
Solid amber| There is a secure 10/100 Mbps connection at the port
Blinking amber| There is reception or transmission occuring at the port.
Light off| No link.
Installation Guidelines
- This section will discuss the hardware installation guidelines that the user must follow in order to properly and safely install this switch into the appropriate environment.
- Visually inspect the power cord and see that it is fully secured to both the power connector, on the switch, and the electrical outlet that supplies power.
- Install the switch in a fairly cool and dry place within the acceptable operating temperature and humidity ranges.
- Install the switch in a site free from strong electromagnetic field generators such as motors, vibration, dust, and direct exposure to sunlight.
Installing the Switch without a Rack.
- When installing the switch on a desktop or shelf, the rubber feet included with the device must be attached on the bottom at each corner of the device’s base.
- Install the switch on a sturdy, level surface that can support the weight of the switch. Do not place any heavy objects on the switch. Make sure that there is proper heat dissipation from and adequate ventilation around the switch. Leave at least 10 cm (4 inches) of space at the front, sides, and rear of the switch for ventilation.
Installing the Switch in a Standard 19” Rack
- The switch can be mounted in a standard 19″(1U) rack using the provided mounting brackets. Fasten the mounting brackets to the sides of the switch using the screws provided.
- Fasten the mounting brackets in any available open space in the rack using the rack-mounting screws.
Installing Transceivers into the Transceiver Ports
- The DQS-5000-54SQ28 switch is equipped with the SFP+, SFP28, QSFP+ and QSFP28 ports for connecting the transceivers.
Grounding the Switch
This section describes how to connect the switch to the ground. You must complete this procedure before powering on the switch.
- Verify if the switch power is off.
- Attach the terminal lug ring of the grounding cable to the ground screw opening of the switch with the grounding screw.
- Attach the terminal lug ring at the other end of the grounding cable to an appropriate grounding stud or bolt on the rack where the switch is installed.
- Verify that the ground connections on the switch and the rack are securely attached.
Plugging in the AC Power Cord
Plug one end of the AC power cord into the power socket of the switch and the
other end into the electrical outlet.
Power Failure
In the event of a power failure, just as a precaution, unplug the power cord
from the switch. After the power returns, plug the power cord back into the
power socket of the switch.
Management Options
The DQS-5000-54SQ28 switch can be managed with the Command Line Interface
(CLI) and SNMP.
Command Line Interface (CLI)
The switch can be managed with the CLI by connecting a PC to the console port
or management port on the switch.
SNMP-based Management
- The switch can be managed with an SNMP-compatible console program. The switch supports SNMP v1, SNMPv2c and SNMPv3.
Connecting to the Console Port
- The front panel of the switch provides a mini-USB console port to connect a remote system for monitoring and configuring the switch.
- Note: to use the mini-USB console port, you may be required to install a mini-USB driver.
- To use the mini-USB console port, the following equipment is needed:
- A terminal or a computer with both an RS-232 serial port and terminal emulation software
- A console cable with a male DB9 connector on one end and a mini-USB connection on the other
To connect the mini-USB console port on the switch to the computer:
- Connect the male DB9 connector on the console cable (shipped with the switch) to the RS-232 serial port on the computer running terminal emulation software, then insert the mini-USB connector into the console port on the front of the switch.
To configure the terminal emulation software as follows:
- Select the appropriate serial port (COM1 or COM2).
- Set the data rate to 115200 baud.
- Set the data format to 8 data bits, 1 stop bit, and no parity.
- Set flow control to none.
- Select VT100 for Emulation mode.
- Select Terminal keys for Function, Arrow and Ctrl keys.
- To be able to view the boot procedure, the switch needs to be rebooted. The simplest way, at this stage, to reboot the switch is to unplug and re-insert the power cable from and into the power receptacle on the back of the switch. Then select an operating system to boot the switch in, either D-Link OS or ONIE.
TECHNICAL SUPPORT
-
Software updates and documentation are available on the D-Link website. D-Link provides free support for customers during the warranty period. Customers can contact the D-Link technical support team by phone or online.
-
D-Link technical support works around the clock every day, except for official holidays. The call is free throughout Russia.
-
D-Link technical support: 8-800-700-5465
Online technical support: http://www.dlink.ru -
e-mail:support@dlink.ru
-
Manufacturer:
-
D-Link Trade LLC
-
390043, Ryazan, Shabulina Ave., 16
-
Tel.: +7 (4912) 575-305
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>