D-Link DIS-100G-5PSW Industrial Unmanaged Switch Installation Guide

October 30, 2023
D-Link

DIS-100G-5PSW

Industrial Unmanaged Switch with 4 10/100/1000Base-T PoE Ports and 1000Base-X SFP Port

Quick Installation Guide

Information in this document is subject to change without notice.
© 2018 D-Link Corporation. All rights reserved.

Package Contents

Open the shipping carton of the switch and carefully unpack its contents. The carton should contain the following items:

  • DIS-100G-5PSW switch
  • DC power terminal block
  • Wall mounting kit
  • DIN-Rail mounting kit
  • Quick Installation Guide
Hardware Overview
Interfaces
Interface Description
Port 1 1000Base-X SFP port
Ports 2-5 1000Base-T PoE ports

Table 1

LED Indicators
LED Status Description
PoE (Ports 2-5)  On green PoE is working.
Off PoE is not working.
P1 On green P1 power line has power.
Off P1 power line is disconnected or does not have power supply.
P2 On green P2 power line has power.
Off P2 power line is disconnected or does not have power supply.
Link/Act (Port 1)  On green Ethernet link is up.
Off Ethernet link is down.
1000 (Port 1) On yellow SFP port 1000 Mbps connection is detected.
Off No link or SFP port 100 Mbps connection is detected.
Link/Act (Ports 2-5) On green Ethernet link is up.
Blinking green Ethernet link is up and there is traffic detected.
Off Ethernet link is down.
Speed (Ports 2-5) On yellow 1000 Mbps connection is detected.
Off No link or 10/100 Mbps connection is detected.

Table 2

DIP-switches
Pin № State Description
Pin 1 ON  To enable broadcast storm rate limit.
OFF To disable broadcast storm rate limit.
Pin 2 ON Not used.
OFF Not used.

Table 3

Hardware Installation
DIN-Rail Mounting

Mounting steps:

  1. Screw the DIN-Rail bracket on with the bracket and screws in the accessory kit.
  2. Hook the unit over the DIN-Rail.
  3. Push the bottom of the unit towards the DIN-Rail until it snaps into place.

Figure 1 — Mounting the switch on a DIN-Rail

Wall Mounting

Screw on the wall-mount plate on with the plate and M4 screws in the accessory kit.

Figure 2 — Attaching brackets to the switch

Figure 3 — The switch with the attached wall mounting brackets

Grounding the Switch

Use the following instructions to ground the switch. Please complete these steps before powering on the switch.

  1. Remove the grounding screw from the switch and place the grounding cable lug ring on top of the grounding screw opening.
  2. Insert the grounding screw back into the grounding screw opening and use a screwdriver to tighten the grounding screw, securing the grounding cable to the switch.
  3. Attach the terminal lug ring at the other end of the grounding cable to an appropriate grounding source.
  4. Verify that the connection between the grounding connector on the switch and the grounding source is secure.

Figure 4 — The grounding screw on the switch

Connecting to a Power Source

The switch can be powered by two power supplies (input range 48 to 58 V DC). Insert the positive and negative wires (AWG 14-26) into V+ and V- contact on the terminal block and tighten the wire-clamp screws to prevent the wires from being loosened.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

D-Link User Manuals

Related Manuals