saunalife G4 Garden Series Outdoor Sauna Instruction Manual
- October 30, 2023
- saunalife
Table of Contents
saunalife G4 Garden Series Outdoor Sauna Instruction Manual
- Fasten the base frame with screws. If possible, fasten the base frame to the Foundation
- Diagonals must be of the same lengths.
- Drill holes before screws.
1 Ground frame
- The wall plank must be 10 mm above the edge of the base frame.
- The first wall plank row must be fixed with screws to the base frame.
2 First wall row
Use hammer and hammer block.
3 Installing walls
- Use hammer and hammer block.
- Install the positions below completely.
4 Installing walls / Purlins
5 Purlins
6 Ventilation grill/Roof boards
7 Roof boards
8 Roof cover / Covering strips
9 Floor / Terrace boards / Floor stripes
10 Door / Window
- Slats can only be screwed to the door and window frame and not to the wall.
Read User Manual Online (PDF format)
Loading......