saunalife G4 Garden Series Outdoor Sauna Instruction Manual
- October 30, 2023
- saunalife
Table of Contents
saunalife G4 Garden Series Outdoor Sauna Instruction Manual


- Fasten the base frame with screws. If possible, fasten the base frame to the Foundation
- Diagonals must be of the same lengths.
- Drill holes before screws.

1 Ground frame
- The wall plank must be 10 mm above the edge of the base frame.
- The first wall plank row must be fixed with screws to the base frame.

2 First wall row
Use hammer and hammer block.

3 Installing walls
- Use hammer and hammer block.
- Install the positions below completely.

4 Installing walls / Purlins

5 Purlins

6 Ventilation grill/Roof boards

7 Roof boards

8 Roof cover / Covering strips

9 Floor / Terrace boards / Floor stripes

10 Door / Window
- Slats can only be screwed to the door and window frame and not to the wall.


Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>