Indu-Sol PROmesh P9+ 9 Port Industrial Managed Switch User Guide

June 10, 2024
Indu-Sol

Indu-Sol PROmesh P9+ 9 Port Industrial Managed Switch

User Manual and Quickstart Guide

The PROmesh P9+ is a full-managed industrial Ethernet switch designed for PROFINET networks. It has 9 data ports with 10/100/1000 MBit/s RJ45 connectors, and supports PROFINET 2.4 standards. The device is protected by Class B and Class III protection classes.

Technical Specifications

  • Voltage Supply : 2x 24 VDC
  • Max. Current Consumption : 0.8A
  • Max. Power Consumption : 8W
  • Size (H x W x D): Not specified
  • Weight : Not specified
  • Mounting: Hutschiene DIN EN 60715
  • Protection Class : Class B and Class III
  • Storage Temperature: Not specified
  • Operating Temperature : Not specified
  • Relative Humidity : Not specified
  • PROFINET Conformance : PROFINET 2.4 Rx, Tx+Rx
  • PROFINET Standard : Class III
  • Data Ports : 9x RJ45 with 10/100/1000MBit/s speed
  • Diagnosis & Management Online wire monitoring Leakage current monitoring Network load monitoring Port-Mirroring DCP, I&M SNMPv1, v2c, v3 SD Card

The PROmesh P9+ is a full-managed Ethernet/PROFINET switch for industrial automation systems which can be easily and conveniently configured via a web UI. It enables uncomplicated installation of bus, star and ring structures with switching functionality

Product Usage Instructions

Mounting the PROmesh P9+

To mount the PROmesh P9+, follow these steps:

  1. Mount the device vertically on a horizontal Hutschiene DIN EN 60715 in your switch cabinet.
  2. Connect the two power supply cables to VDC1 and VDC2 connectors respectively.
  3. Connect the functional equipotential bonding contact to the potential-free switching contact.

Configuring Network Connection

Before configuring the network connection, download the ServiceTool software for Windows from the following link: https://sdx.indu- sol.com/s/CtYtsHNW73Z3KCa. After assigning an appropriate IP address and subnet mask, the PROmesh P9+ web interface can be accessed with the factory default settings as follows:

  • IP Address : 0.0.0.0
  • Subnet Mask : 0.0.0.0
  • Gateway : 0.0.0.0
  • Username : admin
  • Password : admin

Interpreting LED Indicators

The PROmesh P9+ has four LED indicators with the following meanings:

  • VDC1 : Voltage at the connection is sufficient
  • VDC2 : Voltage at the connection is insufficient
  • Status : Active PROFINET connection to the controller
  • Error : Voltage failure, port error or configured alarm is active

For more information on interpreting LED indicators, refer to the user manual available at https://sdx.indu-sol.com/s/CtYtsHNW73Z3KCa.

Important Safety Information

The commissioning and operation of this device should only be carried out by qualified personnel who are authorized to commission, ground, and label devices, systems, and circuits in accordance with safety engineering standards. If you need emergency service outside of regular opening hours, call +49(0)34491 / 580-0. For more information on using the PROmesh P9+ and troubleshooting any issues, refer to the user manual available at https://sdx .indu-sol.com/s/CtYtsHNW73Z3KCa.

General Notes

WARNING
Commissioning and operation of this device may be carried out by qualified personnel only. Qualified personnel are persons who are authorized to commission, ground and label devices, systems and circuits in accordance with the standards of safety engineering.

Something‘s wrong with your product?
You can reach our technical support team on weekdays between 07:30 am – 04:30 pm (CET) by telephone: +49(0)34491 / 581-14 or send us an e-mail: support @indu-sol.com. We will get in touch with you promptly

Your system is at a standstill?
Reach out to our emergency service even outside our regular opening hours: +49(0)34491 / 580-0.

Version 1.0 | Date: 22.05.2022 | Product Code: 114110194 Printed in Germany This document is subject to change without notice. © Copyright 2022 Indu-Sol GmbH

Device Connections

Indu-Sol-PROmesh-P9-9-Port-Industrial-Managed-Switch-
FIG-2 X 2 Power Supply and Alarm contact

  • VDC1 = DC 24V
  • GND = 0V Mass
  • VDC2 = DC 24V
  • GND = 0V Mass
  • Potential-free switching contact functional equipotential bonding

Safety Instructions
Before putting the PROmesh P9+ into operation, check whether it is in perfect condition externally. Always observe the technical specifications of the device to ensure safe and optimal use. The PROmesh P9+ is designed for IP20 protection environments. Take appropriate measures to ensure proper operation of the unit in a different environment.

WARNING
In case of suspected damage, please return the PROmesh P9+ immediately to your supplier and do not put it into operation. Do not open the housing under any circumstances. Unauthorized opening of the housing will void any warranty claims. The PROmesh P9+ is designed for use in PROFINET applications according to Conformance Class B. For complete support of the PROFINET standards, please also observe the selection, layout and wiring of the data ports according to these standards.

Scope of Delivery

  • PROmesh P9+
  • 7-pole 5 mm terminal block (power supply and alarm contact)
  • Quickstart User Guide (hardcopy)
  • SD Card, can be used for backup and updates

Mounting on the DIN Rail Mount the PROmesh P9+ upright in the switch cabinet on a 35 mm DIN rail (DIN EN 60715).

NOTE The following distances to other modules must be observed:

  • right / left : 50 mm
  • top / bottom : 50 mm

WARNING Do not mount the PROmesh P9+ directly next to devices that generate strong electromagnetic interference fields or constantly emit heat to their surroundings. Also protect the PROmesh P9+ from intense sunlight.

Power Supply
The PROmesh P9+ is operated with a redundant DC voltage of 24 VDC, Connect a suitable power source to the labeled terminals of the 7-pin 2,5 mm2 terminal block. Connect the positive lead to one of the VDC contacts and the ammunition lead to the corresponding GND contact. If the external power supply is correctly connected and activated, all status LEDs of the PROmesh P9+ will light up briefly. After a short initialization phase the LEDs go out and the device is ready for operation and can now be configured in the network.

Configuring a Network

Connection Download the Service Tool to your client PC (Windows). You can find the software at the following link https://sdx.indu- sol.com/s/CtYtsHNW73Z3KCa

NOTE
Our software is updated regularly. Please, make sure you are using the latest version. Connect the PC to a suitable data line on one of the data ports (P1 – 9). The PROmesh P9+ and the client PC must be located in the same IP address range and IP subnet. For this you have to assign a corresponding IP address to your PROmesh P9+ for the first time. Use the already installed ServiceTool. After assigning a suitable IP address and subnet mask, the Web UI of the PROmesh P9+ can be reached. The PROmesh P9+ is delivered with the following factory settings:

  • IP Adress 0.0.0.0
  • Subnet mask 0.0.0.0
  • Gateway 0.0.0.0
  • Username admin
  • Password admin

After successful installation and start of the software, you can scan the system with the search setting PROFINET-Gerät. The PROmesh P9+ is displayed in the search result. You can then make and save individual entries in the input mask.

! NOTE
Make sure that the IP address you selected has not yet been assigned. If required, you can display IP addresses that have already been assigned using the PROscan® Active V2 license software from Indu-Sol

WARNING
When logging in for the first time, you must change the factory-set password. It is your responsibility to document this password and protect it against unauthorized access

Accessing the Web User Interface

The device-specific functions of the PROmesh P9+ can be configured via an integrated Web-UI. Open your browser, enter the IP address of the PROmesh P9+ configured in the ServiceTool in your browser bar or use the above configuration data. Alternatively, you can right-click on the corresponding list entry in the context menu of the ServiceTool to select „to website“. The Web UI now opens in your standard browser.

NOTE
Further information on the configuration options and troubleshooting can be found at the following link: https://sdx.indu-sol.com/s/CtYtsHNW73Z3KCa

Interpreting LED Displays

LED label Mode Meaning
VDC1 Green Voltage at terminal sufficient
Off Voltage at terminal insufficient
VDC2 Green Voltage at terminal sufficient
Off Voltage at terminal insufficient
Status Green Active connection to the PROFINET controller
Yellow No active connection to the PROFINET controller
Error Red Power failure, port error or configured alarm active
Off No power failure, no port error and no confi- gured alarm active

Indu-Sol GmbH Blumenstraße 3 04626 Schmoelln Germany

Certified according to DIN EN ISO 9001:2015

All accompanying materials of the product can be found at: https://sdx.indu- sol.com/s/CtYtsHNW73Z3KCa

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals