SCHIER GB-50 FCR2 Field Cut Riser System Installation Guide
- June 11, 2024
- SCHIER
Table of Contents
- Notes
- Engineer Specification Guide:
- Installation Note
- Specifications
- SPECIAL PRECAUTIONS
- Hydrostatic/ Pressure Slabs
- INSTALLATION
- FCR2 COMPATIBILE MODELS
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
- 8 x 5/8″ riser body assembly screw (x12)
- 10 x 3/4″ phillips head stainless steel screws (x4)
- 2 Phillips Head Screwdriver
SCHIER GB-50 FCR2 Field Cut Riser System
Notes
- Unit weight: 32 lbs.
- Riser not designed to hold water
Engineer Specification Guide:
Field-cut adjustable riser system to consist of injection molded polypropylene body, 100% Silicone Sealant for assembly of riser components, butyl mastic sealant for tank-riser or riser-riser joints, stainless steel fastening hardware and heavy duty nylon cable ties and mounts. Riser shall allow field adjustability of cover to grade.
Installation Note
Minimum install height: 4″. Maximum install height: 34″. Riser system may be stacked no more than three units high to a maximum of 94″ extension. Access to internal components will not be compromised.
Specifications
Riser Height Needed | Risers Required (per accessway) |
---|---|
0″ – 4″ | None (use adapter) |
>4″ – 34″ | FCR2 |
>34″ – 64″ | FCR2 (x2) |
>64″ – 94″ | FCR2 (x3) |
SPECIAL PRECAUTIONS
**** For Schier riser Installations – Failure to follow this guidance voids your warranty
WARNING! DO NOT AIR TEST UNIT OR RISER SYSTEM!
Doing so may result in property damage, personal injury or death.
CAUTION Do not install this unit in any manner except as described in these instructions.
Installation Instructions
Installation instructions and additional components are included with the base unit. Read all instructions prior to installation. This riser is intended to be installed by a licensed plumber in conformance with all local codes.
Installations with Risers
CAUTION Do not add any form of lubricant to cover adapter/
gasket assembly or risers during installation.
CAUTION
Make Sure Parts Are Clean When Applying Silicone or Mastic Sealant
Below Grade Installation Slab Requirements
A concrete slab to finished grade with rebar is required when installing
interceptor below grade
High Water Table Installations
Interceptors and risers are not designed to withstand water table height in
excess of the top of the unit when buried (see figure). If it is possible for
this to occur, install the interceptor and risers in a water-tight concrete
vault or backfill with concrete or flowable fill (wet concrete and flowable
backfill should be poured in stages to avoid crushing the interceptor). At
risk areas include but are not limited to tidal surge areas, floodplains and
areas that receive storm water. Models that are direct buried in high water
table scenarios must be installed with an anchor kit. See base unit
installation instructions for selecting appropriate anchor kit.
![High Water
Table Installations](https://manuals.plus/wp-content/uploads/2023/05/SCHIER- GB-50-FCR2-Field-Cut-Riser-System-Installation-Guide-9.png)
Hydrostatic/ Pressure Slabs
When installed under a hydrostatic slab (slab designed to withstand upward lift, usually caused by hydrostatic pressure) interceptor must be enclosed in a watertight concrete vault.
![When installed under a
hydrostatic slab (slab
designed to withstand upward
lift, usually caused by
hydrostatic pressure)
interceptor must be enclosed
in a watertight concrete vault.](https://manuals.plus/wp- content/uploads/2023/05/SCHIER-GB-50-FCR2-Field-Cut-Riser-System-Installation- Guide-10.png)
DO NOT COMPACT BACKFILL
High Temperature Kitchen Water
If water is entering the interceptor at excessive temperature (over 150º F), a
drain water tempering valve (DTV) and approved backflow prevention assembly
must be installed. Most state and local plumbing codes prohibit water above
150º F being discharged into the sanitary sewer. Water above 150º F will
weaken or deform PVC Schedule 40 pipe, poly drainage fixtures like
interceptors and erode the coating of cast iron (leading to eventual failure).
ODOR ALERT!
Interceptor is not a sewer gas trap. All upstream fixtures must be trapped
ODOR ALERT!
Do not install air gap on outlet side of interceptor.
Fully Support Base of Unit
Install unit on solid, level surface in contact with the entire footprint of unit base
Support Inlet and Outlet Piping
For above grade installations ensure heavy inlet and outlet piping (such as cast iron or long runs) is properly supported or suspended during the entire installation process to prevent connection failure or damage to bulkhead fittings.
DO NOT USE CAST IRON COVERS IN ABOVE GRADE OR INDOOR INSTALLATIONS
GETTING TO KNOW THE FCR2
-
8 x 5/8″ riser body assembly screw (x12)
- Riser body half (x2)
- 100% silicone sealant
-
10 x 3/4″ phillips head stainless steel screws (x4)
- Cable tie mounts(x4)
- Heavy duty 18″ – 120 lb. cable tie (x4)
- Stainless steel eyebolt and nut (x4)
- 1″ square x 80″ block butyl mastic sealant
INSTALLATION
Tools You Will Need
-
Tape Measure
-
2 Phillips Head Screwdriver
-
Reciprocating Saw, Circular Saw or Jigsaw
-
Drill with 1/2″ Chuck
-
Level
-
1/4″ Drill Bit
Determine riser height needed and trim risers.
**1a**
Measure dimension X to determine riser height needed.
Riser Height Needed (X) | Risers Required (per accessway) |
---|---|
0″ – 4″ | None (use adapter) |
>4″ – 34″ | FCR2 (x1) |
>34″ – 64″ | FCR2 (x2) |
>64″ – 94″ | FCR2 (x3) |
**1b**
Determine trim length (round up all fractions to next inch). Only
one
FCR2 riser per cover will need to be cut.
Riser Height Needed | Trim Length = |
---|---|
0″ – 4″ | – |
>4″ – 34″ | 31″ – Riser Height (X |
>34″ – 64″ | 62″ – Riser Height (X) |
>64″ – 94″ | 93″ – Riser Height (X) |
| 1c
Measuring from bottom of riser, mark trim length and cut riser halves.
---|---
NOTE: If trim length is 0 or less, no cutting is required. Trimming risers using these guidelines will result in risers that are 0-2″ shorter than the exact riser height needed. Cover Adapter adjustability will allow for final adjustments to grade.
Assemble riser body halves.
2a
Apply silicone sealant (included) to the edge of each riser body
half. Lay one bead into the entire length of the groove and another bead into
the sealant trough next to the screw holes.
Immediately assemble riser halves after applying sealant and fasten using supplied screws.
Install risers onto base unit.
**3a**
Loosen the cover adapter lower band clamps using 7/16″ nut driver
bit.
|
3a
Remove cover adapters.
---|---
|
|
|
---|---|---
Remove insert plugs, then hand tighten eyebolts into threaded holes
surrounding the accessway| Lay butyl mastic sealant into the channel
surrounding the accessway.| Place riser into position aligning vertical ribs
with eyebolt
|
---|---
Install 4 cable tie mounts onto lowest horizontal structural rib using #10 x
3/4″ screws. Make sure mounts are located directly above eyebolts and are
positioned for horizontal cable tie placemen| Loop cable ties through mounting
holes and eyebolts, do not tighten.
|
---|---
Tighten cable ties, a little bit at a time in a star pattern going around
the riser to evenly force the riser into the mastic sealant. Riser should
go 1/2″ – 3/4″ into the sealant.| Make final adjustments to cable ties to
ensure riser is level.
Install risers onto risers (34″+).
|
|
---|---|---
On bottom riser: drill (4) 1/4″ mounting holes through flange.| On bottom
riser: install eyebolts into holes in riser flange using supplied stainless
steel nuts. Hand tighten only| On bottom riser: lay butyl mastic sealant onto
the flange surrounding the accessway
|
---|---
Place top riser onto bottom riser.| On the top riser: Install 4 cable tie
mounts onto lowest horizontal structural rib using #10 x 3/4″ screws. Make
sure mounts are located directly above eyebolts and are positioned for
horizontal cable tie placement.
|
|
---|---|---
Loop cable ties through
cable mounts and eyebolts,
do not tighten.| Tighten cable ties, a little bit at a time in a star pattern
going around the riser to evenly force the riser into the mastic sealant.
riser should go 1/2″ – 3/4″ into the sealant.| Make final adjustments to cable
ties to ensure riser system is level.
Install cover adapters.
5a
Secure cover adapters onto risers.
**5b**
Make final cover adapter adjustments
Loosen the cover adapter upper band clamp using 7/16″ nut driver bit. Adjust
cover adapter heights as needed. Maintain a minimum 2-1/2″ insertion depth.
Tighten upper band clamp to 5 -8 ft. lbs. of torque using 7/16″ nut driver
bit. If required, cover adapters may now be tilted up to 10º in any direction
using gasket flexibility
FCR2 COMPATIBILE MODELS
Great Basin™ Grease Interceptors
Billy Goat™ Kitchen Solids Interceptors
Sewer Viewer™ Wastewater Sampling Ports