SCHIER GB1 20/25 GPM Grease Interceptor for Indoor Use Installation Guide
- June 11, 2024
- SCHIER
Table of Contents
GB1 20/25 GPM Grease Interceptor for Indoor Use
Installation Guide
GB1 20/25 GPM Grease Interceptor for Indoor Use
SPECIAL PRECAUTIONS
For Schier Grease Interceptor Installations – Failure to follow this guidance
voids your warranty
WARNING DO NOT AIR TEST UNIT OR RISER SYSTEM!
Doing so may result in property damage, personal injury or death.
Caution
Do not install this unit in any manner except as described in these
instructions.
Installation Instructions
Installation instructions and additional components are included with the
interceptor. Read all instructions prior to installation. This interceptor is
intended to be installed by a licensed plumber in conformance with all local
codes. When Installing Interceptor Inside
If your dishwashing sink(s) discharges into a floor drain/sink (drain), you
must regulate the flow into the drain to avoid an overflow of water onto the
kitchen floor. This can
be done by installing a valve or flow restriction cap on the sink piping that
discharges into the drain. See drawing for guidance. For detailed guidance on
indirect connections, go to:
webtools.schierproducts.com/Technical_Data/Indirect_Connections.pdf
Hydrostatic Slabs (or Pressure Slabs)
When installed under a hydrostatic slab (slab designed to withstand upward
lift, usually caused by hydrostatic pressure) interceptor must be enclosed in
a watertight concrete vault. High Temperature Kitchen Water
If water is entering the interceptor at excessive temperature (over 150º F), a
drain water tempering valve (DTV) and approved backflow prevention assembly
must be installed. Most state and local plumbing codes prohibit water above
150º F being discharged into the sanitary sewer. Water above 150º F will
weaken or deform PVC Schedule 40 pipe, poly drainage fixtures like interceptors
and erode the coating of cast iron (leading to eventual failure).
ODOR ALERT!
Do not install air gap on outlet side of interceptor. SPECIAL PRECAUTIONS
For Schier Grease Interceptor Installations – Failure to follow this guidance
voids your warranty
High Water Table Installations
Interceptors and risers are not designed to withstand water table height in
excess of the top of the unit when buried (see figure). If it is possible for
this to occur, install the interceptor and risers in a water-tight concrete
vault or backfill with concrete or flowable fill (wet concrete and flowable
backfill should be poured in stages to avoid crushing the interceptor). At risk
areas include but are not limited to tidal surge areas, floodplains and areas
that receive storm water. Great Basin™ models that are direct buried in high
water table scenarios must be installed with an anchor kit. Models GB-50,
GB-75, and GB-250 use model AK1 anchor kit. Model GB-500 uses model AK2 anchor
kit for use with deaden anchors. Models GB-1000, GGI-750 and GGI-1500 use
model AK3 anchor kit for use with deaden anchors.
Flush-to-Grade Burials
Flush-to-Grade buried installations (without a riser) are not recommended for
heavy foot traffic areas without the use of an internal gusset support kit
SGK2 (for GB2) or SGK3 (for GB3). Fully Support Base of Unit
Install unit on solid, level surface in contact with the entire footprint of
unit base; for suspended installations design trapeze to support the wet
weight of the unit. Do not partially support unit or suspend unit using metal
U-channel to create a trapeze. Support Inlet and Outlet Piping
For above grade installations ensure heavy inlet and outlet piping (such as
cast iron or long runs) is properly supported or suspended during the entire
installation process to prevent connection failure or damage to bulkhead
fittings. GETTING TO KNOW THE
GB1
1. Cover | 8. Optional Side Outlets 4″ FPT (x2) | 16. Cover Bolts (x4) |
---|---|---|
2. Standard Installation Flow | 9. Connection Fitting Gaskets (x4) | 17. |
Cover Gasket
4. 25 GPM Flow Control Extension (>5′ below kitchen only)| 10. Bulkhead
Connection Retaining Nuts (x4)| 18. Air Relief/Visual Access
5. Inlet Diffuser (Top)| 11. Inlet 4″ FPT Connection| 19. Outlet 4″ FPT
Connection
6. Diffuser Retaining Nuts (x2)| 12. 2″ Plain End Fittings (x2)| 20. Outlet
Diffuser (Top)
7. 4″ Cleanout Plugs (x2)| 14. Diffuser Foot Retaining Nuts (x2)| 21.
Outlet Diffuser (Foot)
13. 3″ Plain End Fittings (x2)| 15. Inlet Diffuser (Foot)|
ON THE FLOOR INSTALLATION
Special Precautions
- ODOR ALERT! Do not install air gap on outlet side of interceptor.
- Install interceptor as close as possible to fixtures being served
- ODOR ALERT! Interceptor is not a sewer gas trap. All upstream fixtures must be trapped
- Provide at least 5-1/2″ clearance above unit for routine maintenance.
Test Tank for Water Tightness
Cap all connection points with 4″ cleanout plugs using pipe thread sealant
or tape approved for use with plastics. Remove cover and fill with water to
just above the highest connection. For riser system testing (if required) fill
to finished grade level.
CAUTION: Support risers before filling to prevent tipping. Inspect unit,
connections and gaskets for leaks. Check water level at specific time intervals
per local code. Leak?
Call customer care at 913-951-3300 8a –
5p M – F CST
Set Up Outlet Diffuser and Install Cleanout Plugs
Choose outlet location.
Side outlet Straight-through Unscrew diffuser retaining nut and
remove outlet diffuser. Unscrew diffuser foot retaining nut and remove outlet
diffuser foot. Rotate diffuser toward chosen outlet, replace foot ensuring it
will point to the back wall of the unit and hand tighten foot retaining nut.
Insert diffuser into chosen outlet and hand tighten retaining nut. Cap all
unused connection points with 4″ cleanout plugs using pipe thread sealant or
tape approved for use with plastics.
ON THE FLOOR INSTALLATION
Calibrate Flow Control
Note to
Plumbing Inspector This interceptor includes certified internal flow control and
does not require a dedicated “Flow Control Vent” (air intake).Rotate flow control cartidge counter-clockwise to
release and remove from inlet diffuser
Depending on which flow rate is desired, attach either the 20 or 25 GPM Flow
Control Cartridge Extension using PVC primer/cement. Make sure extension is
fully inserted into the cartridge and hold both components firmly together
(until cement grabs) to prevent push-out.Slide flow control cartridge into top of inlet
diffuser and rotate clockwise until cartridge drops onto flow control retainer
pins. Continue rotating clockwise until pins are fully seated.
Connect Piping Choose inlet and outlet fittings (included) based on pipe
size.
Connect piping using pipe thread sealant or tape approved for use with
plastics. Ensure all upstream fixtures are trapped. Vent per local code.
Wet or Air Test Piping Per Local
Code
Warning DO NOT AIR TEST UNIT OR RISER SYSTEM!
Doing so may result in property damage, personal injury or death.
Leak? Call customer care at
913-951-3300 8a – 5p M – F CST
BURIED INSTALLATION
Special Precautions
- Install interceptor as close as possible to fixtures being served
- Risers (25″) Max
- Max Water Level Risers are not designed to retain water
Test Tank for Water Tightness
Cap all connection points with 4″ cleanout plugs using pipe thread sealant
or tape approved for use with plastics. Remove cover and fill with water to
just above the highest connection. For riser system testing (if required) fill
to finished grade level.
CAUTION: Support risers before filling to prevent tipping. Inspect unit,
connections and gaskets for leaks. Check water level at specific time intervals
per local code. Side outletLeak?
Call customer care at 913-951-3300 8a
– 5p M – F CST
Set Up Outlet Diffuser and Install Cleanout Plugs
Choose outlet location. Side outlet Straight-through Unscrew diffuser
retaining nut and remove outlet diffuser.
Unscrew diffuser foot retaining nut and remove outlet diffuser foot. Rotate
diffuser toward chosen outlet, replace foot ensuring it will point to the back
wall of the unit and hand tighten foot retaining nut. Insert diffuser into
chosen outlet and hand tighten retaining nut. Cap all unused connection points
with 4″ cleanout plugs using pipe thread sealant or tape approved for use with
plastics.
Calibrate Flow Control
Note to
Plumbing Inspector This interceptor includes certified internal flow control and
does not require a dedicated “Flow Control Vent” (air intake). Rotate flow
control cartidge counter-clockwise to release and remove from inlet diffuser
Depending on which flow rate is desired, attach either the 20 or 25 GPM Flow
Control Cartridge Extension using PVC primer/cement. Make sure extension is
fully inserted into the cartridge and hold both components firmly together
(until cement grabs) to prevent push-out. Slide flow control cartridge into
top of inlet diffuser and rotate clockwise until cartridge drops onto flow
control retainer pins. Continue rotating clockwise until pins are fully
seated. OPTIONAL: For easy flow control removal in deep burial
installations, 1-1/2″ PVC SCH. 40 pipe may used as an extension handle. Before
risers have been installed, cut pipe to length and attach to top of flow
control cartridge using PVC primer/cement.
ExcavationExcavate hole 6″ larger
than interceptor on all sides.
Add crushed aggregate (approximately 3/4″ size rock or sand, with no fines) to
base of hole.
Connect Piping
Floor Sink Installation
If your dishwashing sink(s) discharges into a floor drain/sink (drain), you
must regulate the flow into the drain to avoid an overflow of water onto the
kitchen floor. This can be done by installing a valve or flow restriction cap on
the sink piping that discharges into the drain. Choose inlet and outlet
fittings (included) based on pipe size. Set interceptor and connect piping
using pipe thread sealant or tape approved for use with plastics. Vent per
local code. Fill tank with water so that it remains in place during backfill.
Wet or Air Test Piping Per Local Code
Warning: DO NOT AIR TEST UNIT OR RISER SYSTEM! Doing so may result in
property damage, personal injury or death.
Leak? Call customer care at
913-951-3300 8a – 5p M – F CST
Backfill and Finished Grade Below Grade with Riser
(preferred): See instructions included with FCR1 riser. Backfill evenly
around tank using crushed aggregate (approximately 3/4″ size rock or sand,
with no fines), finish with a minimum 4″ thick concrete pad.
Flush-to-Grade Burials: Not recommended for heavy foot traffic areas.
Backfill evenly around tank using crushed aggregate (approximately 3/4″ size
rock or sand, with no fines), finish with a minimum 4″ thick concrete pad.
LIFETIME GUARANTEED GREASE INTERCEPTORS
913-951-3300
schierproducts.com
© Copyright 2023 Schier Products Company, 01/01/23
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>