Next Level Racing NLR-E044 Traction Adapter Frame Instruction Manual

June 10, 2024
next level RACING

Motion Plus &
Traction Plus
Adaptor Frame
INSTRUCTION MANUAL

IN THE BOX

Next Level Racing NLR-E044 Traction Adapter Frame -
Feg1

If you require any support with your product please contact our friendly team at: support@nextlevelracing.com
WARNING CHOKING HAZARD – Small parts not for children under 3 years or any individual what have a tendency to place inedible objects in their mounts
Please do not use power tools for assembly as over tightening can damage your frame.
Please ensure T-Nuts are correctly placed within the extrusion to prevent damaging parts.
Lay out and build the Frame on a soft and protected level surface.
Do not force parts together.
Avoid cross threading threaded items.
T-Nuts must be installed from the end of the profile and cannot be installed mid channel.
Beware of sharp edges on extrusion pieces.
Plan the placement of cable management clips at the beginning of your build.

ASSISTANCE

Next Level Racing NLR-E044 Traction Adapter Frame - qr
codebit.ly/nIrbuild

If you require further support with your product please contact our friendly team at: support@nextlevelracing.com

Next Level Racing NLR-E044 Traction Adapter Frame -
Feg2

  1. Install 6 x T-Nuts into the inside channel, B) 2 x T-Nuts into the top channel, C) and 2 x T-Nuts into the I front channel of the Front End Member. Red dots show T- uts locations.

  2. Align the holes on the Corner Brackets with the T-Nuts previously installed in Steps 01, 02 and 03. Bolt through and secure with 12 x M8 Bolts and Washers.

  3. Align the Pivot Bar installed to your cockpit with the Back – Pivot Bar Locking Bracket. Align the mounting holes on the Motion Plus platform feet with the T-Nuts previously installed in Step 03.Next Level Racing NLR-E044 Traction Adapter Frame - Feg3

  4. Install 4 x T-Nuts into the inside channel of the Back End Member. Red dots show T-Nuts locations.

  5. Align the mounting holes on the Front and Back End Members with the mounting holes on the Traction Plus Platform. Bolt through and secure with 12 x M8 Bolts and Washers.

  6. Align the top hole on the Front and Back Pivot Bar Locking Brackets. Bolt through and secure with 1 x M8 Countersunk Bolt and Flange Nut. Align the bottom holes on the Front – Pivot Bar Locking Bracket with T-Nuts previously installed in Step 01. Bolt through and secure with 2 x M8 Countersunk Bolts.Next Level Racing NLR-E044 Traction Adapter Frame - Feg4

  7. Install 2 x Tutus into the inside channel and 1 x TNut into the top channel of the Side Member. Repeat for both Side Members. Red dots show Tluts locations.

  8. Align the top mounting holes on the Back – Pivot Bar Locking Bracket with the T-Nuts previously installed in Step 01. Bolt through and secure using 2 x M8 Countersunk Bolts.

  9. Align the mounting holes on the Motion Plus Platform feet with the T-Nuts previously installed in Step 03. Bolt through and secure with 2 x M8 Bolts and Square Washers.
    Next Level Racing NLR-E044 Traction Adapter Frame -
Feg5

  10. Align the holes on the Side Members with the threaded holes on the Front and Back End Members. Bolt through and secure with 4 x M8 Bolts and Washers.

  11. Align the inside mounting holes on the Back – Pivot Bar Locking Bracket with the T-Nuts installed in Step I 01. Bolt through and secure using 2 x M8 Bolts and Washers.

  12. Install 4 x 4040 End Caps at the end of the Side Members

@next_level_racing
@nextlevelracingOfficial
bit.ly/NLRowner
@nextlviracing
Next Level Racing
support@nextlevelracing.comhttps://www.nextlevelracing.com /follow-us/

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals