OPTONICA LED Strip 5050 12V Non Waterproof Professional Edition Installation Guide
- June 4, 2024
- OPTONICA
Table of Contents
LED Strip 5050 12V Non-Waterproof Professional Edition
Installation Guide
Installation Steps:
Before installation, check the entire chain of LED modules for light intensity
and color consistency.| Clean the mounting surface with degreasing agent.
Set the right module spacing. Consider the size of the box or channel letter
mainly depth, the front face material type, and desired lighting
effect. If it is necessary, you can wrap the wires and dense the LED module’s
pitch.| Arrange LED modules. Peel of the release paper of double-sided
adhesive tapes. Then stick modules on the installing surface for preliminary
mounting.
Note: The adhesive tape is for auxiliary assembly only.
Connect LED modules to each other by connectors UY2 compliant with IP67.
Note: be sure not to exceed the permitted number of LED modules in the
chain.| Connect the module circuitry to the proper power supply until.
Note: Refer to the product data sheet for the maximum allowed number of
modules in a chain. Please ensure the “+” & “-” of the LED modules wire are
connected with the power supply correctly.
Isolate the free wires with IP67-certified connectors.
Notes: Check the cables for short circuits.
Switch on the power and verify the lighting effect.
Fasten the modules and the wires permanently by screwing, riveting, or the
special glue.
Notes: Make sure your system is unplugged.
The light box / Channel letter body shall be grounded.
Notes: Fail to ground the body might endanger the ESD shock with lead to
module destruction.
IMPORTER: Prima Group 2004 LTD,
Bulgaria, 1784 Sofia, Mladost 1, bl. 144,
Ground Floor; Phone: +359 2 988 45 72;
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>