TRANE Blower FAN01299 and FAN01306 Instruction Manual
- June 9, 2024
- Trane
Table of Contents
TRANE Blower FAN01299 and FAN01306 Instruction Manual
SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air- conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the equipment.
Warnings, Cautions, and Notices
Read this manual thoroughly before operating or servicing this unit. Safety
advisories appear throughout this manual as required. Your personal safety and
the proper operation of this machine depend upon the strict observance of
these precautions.
The three types of advisories are defined as follows:
WARNING Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
CAUTION Indicates a potentially hazardous situation which, if not
avoided, could result in minor or moderate injury. It could also be used to
alert against unsafe practices.
NOTICE Indicates a situation that could result in equipment or property-
damage only accidents.
Important Environmental Concerns
Scientific research has shown that certain man-made chemicals can affect the
earth’s naturally occurring stratospheric ozone layer when released to the
atmosphere. In particular, several of the identified chemicals that may affect
the ozone layer are refrigerants that contain Chlorine, Fluorine and Carbon
(CFCs) and those containing Hydrogen, Chlorine, Fluorine and Carbon (HCFCs).
Not all refrigerants containing these compounds have the same potential
impact to the environment. Trane advocates the responsible handling of all
refrigerants including industry replacements for CFCs such as HCFCs and HFCs.
Important Responsible Refrigerant Practices
Trane believes that responsible refrigerant practices are important to the
environment, our customers, and the air conditioning industry. All technicians
who handle refrigerants must be certified according to local rules. For the
USA, the Federal Clean Air Act (Section 608) sets forth the requirements for
handling, reclaiming, recovering and recycling of certain refrigerants and the
equipment that is used in these service procedures. In addition, some states
or municipalities may have additional requirements that must also be adhered
to for responsible management of refrigerants. Know the applicable laws and
follow them.
WARNING
Proper Field Wiring and Grounding Required!
Failure to follow code could result in death or serious injury. All field
wiring MUST be performed by qualified personnel. Improperly installed and
grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these
hazards, you MUST follow requirements for field wiring installation and
grounding as described in NEC and your local/state/national electrical codes
WARNING
Personal Protective Equipment (PPE) Required!
Failure to wear proper PPE for the job being undertaken could result in death
or serious injury. Technicians, in order to protect themselves from potential
electrical, mechanical, and chemical hazards, MUST follow precautions in this
manual and on the tags, stickers, and labels, as well as the instructions
below:
- Before installing/servicing this unit, technicians MUST put on all PPE required for the work being undertaken (Examples; cut resistant gloves/ sleeves, butyl gloves, safety glasses, hard hat/bump cap, fall protection, electrical PPE and arc flash clothing). ALWAYS refer to appropriate Safety Data Sheets (SDS) and OSHA guidelines for proper PPE.
- When working with or around hazardous chemicals, ALWAYS refer to the appropriate SDS and OSHA/GHS (Global Harmonized System of Classification and Labeling of Chemicals) guidelines for information on allowable personal exposure levels, proper respiratory protection and handling instructions.
- If there is a risk of energized electrical contact, arc, or flash, technicians MUST put on all PPE in accordance with OSHA, NFPA 70E, or other country specific requirements for arc flash protection, PRIOR to servicing the unit.
NEVER PERFORM ANY SWITCHING, DISCONNECTING, OR VOLTAGE TESTING WITHOUT PROPER ELECTRICAL PPE AND ARC FLASH CLOTHING. ENSURE ELECTRICAL METERS AND EQUIPMENT ARE PROPERLY RATED FOR INTENDED VOLTAGE.
WARNING
Follow EHS Policies!
Failure to follow instructions below could result in death or serious injury.
- All Trane personnel must follow the company’s Environmental, Health and Safety (EHS) policies when performing work such as hot work, electrical, fall protection, lockout/tagout, refrigerant handling, etc. Where local regulations are more stringent than these policies, those regulations supersede these policies.
- Non-Trane personnel should always follow local regulations.
Copyright
This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
Trademarks
All trademarks referenced in this document are the trademarks of their respective owners.
WARNING
Hazardous Voltage w/Capacitors!
Failure to disconnect power and discharge capacitors before servicing could
result in death or serious injury. Disconnect all electric power, including
remote disconnects and discharge all motor start/run capacitors before
servicing. Follow proper lockout/ tagout procedures to ensure the power cannot
be inadvertently energized. Verify with a CAT III or IV voltmeter rated per
NFPA 70E that all capacitors have discharged.
- Remove the combustion blower and motor assembly. Save the round combustion air orifice for reuse. Refer to Figure 1.
- Install the new motor using the new gaskets and sight glass. Refer to Figure 1.
Important: The adapter plate is only necessary when converting from an Ametek
combustion blower to a Fasco combustion blower
Figure 1. Combustion blower kit
Important: These new wiring arrangements only pertain to Voyager units built prior to the sixth week of 1991 (F06 serial number range and earlier)
Figure 2. Combustion fan relay (CFR) wiring change
Trane Policy
Trane and American Standard create comfortable, energy efficient indoor environments for commercial and residential applications. For more information, please visit trane.com or americanstandardair.com
.Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>