Anolis ArcSource Outdoor 4MC Pixel Instruction Manual

June 9, 2024
ANOLiS

INSTALLATION INSTRUCTIONS
ARCSOURCE OUTDOOR 4MC PIXEL

ArcSource Outdoor 4MC Pixel

Fixture must be installed by a qualified electrican in accordance with all national and local electrical and construction codes and regulations. This device falls under class one and must be grounded!

Anolis ArcSource Outdoor 4MC Pixel Three holes of diameter 4.3mm in the base serve for mounting on the non-flammable surface.
The luminaire head can be adjusted in range of 120°. Loosen a locking screw M5x12, tilt it to desired position and tighten the screw.

STEP 2A INSTALL WITH STANDARD BASE

Use fasteners that are appropriate for use with your mounting surface.

Fasten the base of luminaire into the mounting surface with three screws.

STEP 2B INSTALL WITH STANDARD BASE AND ADAPTOR

Unscrew M5x14 from the bottom part of base and disassemble the base from the luminaire.

Anolis ArcSource Outdoor 4MC Pixel - Fig 2

  1. standard washer
  2. spring washer
  3. screw

Assemble the 31mm adaptor between the luminaire and the base. Locking pin of the adaptor has to placed correctly into matching part of the luminaire. Screw the luminaire, adaptor and base together with M5x45, spring washer and standard washer.
Fasten the base of luminaire into the mounting surface with three screws.

STEP 2C

INSTALLATION OF 100MM ADAPTOR STAND AND MOUNTING

Anolis ArcSource Outdoor 4MC Pixel - Fig 4

Unscrew M5x14 from the bottom part of base and disassemble the base from the luminaire.

  1. standard washer
  2. spring washer
  3. screw
    Screw the 100mm adaptor into luminaire by bolt on adaptor.
    Fasten the base to the adaptor with original M5x14 screw and washers.

Use fasteners that are appropriate for use with your mounting surface.

Fasten the base of luminaire into the mounting surface with three screws.

STEP 2D

INSTALL WITH LAND SPIKE OR FLOOR STAND

Insert the Land Spike into ground. Underground part of Land Spike should be placed perpendicularly into the ground. (if you need to use tools to insert spike in the ground, use of some protective layer, and applying pressure in the middle is recommended to prevent damaging of land spike)
Floor Stand

Use fasteners that are appropriate for use with your mounting surface.

Anolis ArcSource Outdoor 4MC Pixel - Fig 4

Fasten the Floor stand into the mounting surface by four screws and prepared mounting holes.

Land spike 1 ASO 4 MC Pixel 100 mm

Anolis ArcSource Outdoor 4MC Pixel - Fig 9

  1. Insert the Land Spike into the ground. Underground part of Land spike (1) should be placed perpendicularly into the ground. (if you need to use tools to insert spike in the ground, use of some protective layer and applying pressure in the middle is recommended to prevent damaging of land spike).
  2. Screw the threaded bar (2) into the top of underground part (1) and fasten it with the socket head M5x5 (3).
  3. Slide the cover (4) on the treaded bar (2).
  4. Slide the 36.5mm pipe cover (5) on the threaded bar (2).
  5. Slide the cable holder (6) on the threaded bar (2).
  6. Screw the nut with mount (7) on the threaded bar (2).
  7. Fasten the luminaire on the mount (7) with one M5x14 screw from the bottom of luminaire.
  8. Pass cable through the cable holder (6).

Land spike 2 ASO 4 MC Pixel 100 mm

Anolis ArcSource Outdoor 4MC Pixel - Fig 10

  1. Insert the Land Spike into the ground. Underground part of Land spike (1) should be placed perpendicularly into the ground. (if you need to use tools to insert spike in the ground, use of some protective layer and applying pressure in the middle is recommended to prevent damaging of land spike).
  2. Screw the threaded bar (2) into the top of underground part (1) and fasten it with the socket head M5x5 (3).
  3. Slide the cover (4) on the treaded bar (2).
  4. Slide the 36.5mm pipe cover (5) on the threaded bar (2).
  5. Slide the cable holder (6) on the threaded bar (2).
  6. Slide the 36.5mm pipe cover (5) on the threaded bar (2).
  7. Slide the ArcSources holder (8) on the threaded bar.
  8. Screw the nut (9) on the treaded bar.
  9. Fasten both luminaires to the holder (8) with M5x14 screws from the bottom of each luminaire and its mount on the holder.
  10. Pass the cable through the cable holder (6).

Land spike 1 ASO 4 MC Pixel 500 mm

Anolis ArcSource Outdoor 4MC Pixel - Fig 11

  1. Underground part of Land spike (1) should be placed perpendicularly into the ground. (if you need to use tools to insert spike in the ground, use of some protective layer
    and applying pressure in the middle is recommended to prevent damaging of land spike)

  2. Screw the threaded bar (2) onto the underground part of spike (1) and fasten it with the socket head M5x5 (3).

  3. Slide the cover (4) on the treaded bar (2) and the socket head (3).

  4. Slide the 36.5mm pipe cover (5) on the threaded bar (2).

  5. Slide the cable holder (6) on the threaded bar (2).

  6. Slide the 198mm pipe cover (7) on the threaded bar (2).

  7. Slide the cable holder (6) on the threaded bar (2).

  8. Slide the 198mm pipe cover (7) on the threaded bar (2).

  9. Slide the cable holder (6) on the threaded bar (2).

  10. Screw the nut with mount (8) on the threaded bar (2).

  11. Fasten the luminaire on the mount (8) with one M5x14 screw from the bottom of luminaire and its mount.

  12. Pass cable through the cable holders (6).

Land spike 2 ASO 4 MC Pixel 500 mm

Anolis ArcSource Outdoor 4MC Pixel - Fig 12

  1. Underground part of Land spike (1) should be placed perpendicularly into the ground. (if you need to use tools to insert spike in the ground, use of some protective layer
    and applying pressure in the middle is recommended to prevent damaging of land spike)

  2. Screw the threaded bar (2) onto the underground part of spike (1) and fasten it with the socket head M5x5 (3).

  3. Slide the cover (4) on the treaded bar (2) and the socket head (3).

  4. Slide the 36.5mm pipe cover (5) on the threaded bar (2).

  5. Slide the cable holder (6) on the threaded bar (2).

  6. Slide the 198mm pipe cover (7) on the threaded bar (2).

  7. Slide the cable holder (6) on the threaded bar (2).

  8. Slide the 198mm pipe cover (7) on the threaded bar (2).

  9. Slide the ArcSources holder (8) on the threaded bar (2).

  10. Screw the nut (9) on the threaded bar (2).

  11. Fasten both luminaires to the holder (8) with M5x14 screws from the bottom of each luminaire and its mount.

  12. Pass cables through the cable holder (6).

Land spike 3 ASO 4 MC Pixel 500 mm

  1. Underground part of Land spike (1) should be placed perpendicularly into the ground. (if you need to use tools to insert spike in the ground, use of some protective layer and applying pressure in the middle is recommended to prevent damaging of land spike)
  2. Screw the threaded bar (2) onto the underground part of spike (1) and fasten it with the socket head M5x5 (3).
  3. Slide the cover (4) on the treaded bar (2) and the socket head (3).
  4. Slide the 36.5mm pipe cover (5) on the threaded bar (2).
  5. Slide two cable holders (6) on the threaded bar (2).
  6. Slide the 198mm pipe cover (7) on the threaded bar (2).
  7. Slide the ArcSources holder (8) on the threaded bar (2).
  8. Slide the 198mm pipe cover (7) on the threaded bar (2).
  9. Slide the cable holder (6) on the threaded bar (2).
  10. Screw the nut with mount (9) on the threaded bar (2).
  11. Fasten three luminaires to their holders (8,9) with M5x14 screws from the bottom of each luminaire and its  ount.
  12. Pass cables through the cable holders (6).

Anolis ArcSource Outdoor 4MC Pixel - Fig 12

STEP 3

CONNECTION

Anolis ArcSource Outdoor 4MC Pixel - Fig 15

Connection of ArcSource Outdoor 4MC Pixel is provided by 50cm long cable with male connector. (variety of cable adaptors is available)

Anolis ArcSource Outdoor 4MC Pixel - Fig 15

Before ASO 4MC Pixel are connected to power source, you have to connect the Active Terminator on the last luminaire in the row. That is necessary for correct identification  f every single ASO 4MC Pixel and this has to be done for setup of every ASO 4MC Pixel row.  You canchange the Active Terminator box for Passive Terminator box, when the set up is finished.

Anolis ArcSource Outdoor 4MC Pixel - Fig 17

Connect luminaires to each other and to power supply via T-connectors and cables.
Recommended power supplies:
ArcPixel Rack Unit, ArcPixel Power.

Anolis ArcSource Outdoor 4MC Pixel - Fig 17

STEP 4

INSTALLATION ACCESSORIES

Half Top Hat and Top Hat

Anolis ArcSource Outdoor 4MC Pixel - Fig 17

Anolis ArcSource Outdoor 4MC Pixel - Fig 17

Unscrew the Allen head screw M5x12 from the ArcSource Outdoor 4MC Pixel housing and its base.
Screw the half top hat to luminaire body as is shown at the picture above.

The accessories must be tighted between two washer. Co- rrect position of the spring washer is in touch with bolt head.

Twin Wall Cover (Flat / Round)

Anolis ArcSource Outdoor 4MC Pixel - Fig 23

Unscrew four M3x6 screws from Twin Wall Cover and remove the cover from the luminaires base holder.
Prepare openings for cables in the mounting surface, minimal diameter of 21mm, and if necessary also two mounting holes ccording to disposition above.

Anolis ArcSource Outdoor 4MC Pixel - Fig 23

Fasten the luminaires (without their bases) to the holder with two M5x12 screws via two outer mounting holes.
Fasten the holder with luminaires to the mounting surface via two inner holes and fasteners suitable to mounting surface.

Twin Wall Cover (Flat / Round)

Anolis ArcSource Outdoor 4MC Pixel - Fig 23

Slide the cover on the luminaires holder mounted on the surface.
Fasten the cover to the holder by four M3x6 screws.
Pipe Clamp diameter 19

Anolis ArcSource Outdoor 4MC Pixel - Fig 26

Unscrew M5x14 from the bottom of luminaire and remove its base.
Fasten the Pipe Clamp to the luminaire with M5x14 as illustrated.

Anolis ArcSource Outdoor 4MC Pixel - Fig 27

Place the Pipe Clamp on a construction rod of 19mm in diameter.
Fasten the Pipe Clamp to the construction rod by MX screw until it is tightened well and holds luminaire firmly.

Optical Demo Set

Anolis ArcSource Outdoor 4MC Pixel - Fig 27

Press the springs of the Holder together, place the Holder on top of the Optical Foil and secure it on the luminaire by releasing the springs.
ArcSource Outdoor 4MC Pixel with Optical Demo Set installed.
Holder secures the Optical Foil on the luminaire firmly.

ROBE lighting s. r. o. |Palackeho 416 |
757 01 Valasske Mezirici |
Czech Republic | Tel.: +420 571 751 500 |
E-mail: info@anolis.eu
www.anolislighting.com
VERSION 2.0 / 02_2022

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals