HFCL ion4I3_CPE UBR User Guide

June 3, 2024
HFCL

HFCL ion4I3_CPE UBR

Introduction

Thank you for choosing the IO’s Unlicensed Band Radio (UBR). Enterprise Grade point-to-point and point-to-multipoint solution is optimally designed to support low to medium capacity enterprise applications in unlicensed 5 GHz spectrum for short and long range links.

Packaging Content

Mounting Kit

  1. Hood (1),
  2. M6 Hex Bolts with split washers (6),
  3. M6 Flange Nuts with serrations (4),
  4. MS x 220 Bolts (2),
  5. Riveted U clamps (1 ),
  6. Pole clamp assembly (1 ),
  7. Pole clamp (1 ),
  8. Nuts MS (4), MS split washer (4) & MS flat washers

ion413_CPE Specifications

Peak Throughput(aggregate) Up to 300 Mbps Aggregate UUDL Throughput
MIMO 2X2
Modulation Upto 256 QAM
Channel Bandwidth 10/20/40 MHz
Wireless QoS 802.11eWMM
Wireless Security WPA,WPA2, & 128-bit AES-PSK with hardware

acceleration
Power Supply| IEEE 802.3af Active PoE
Power Consumption (Max)| < 15W
GPS Location| GNSS-1 (GPS +GLONASS)
Antenna Type| Integrated High Performance Dish Antenna
Antenna Gain| 25 dBi
Management| Standalone (via GUI) or through appliance-based EMS or cloud-based
Enclosure Dimensions| 465 x 465 x 235 mm or 18.3 x 18.3x 9.25 inches
Weight| 2 kg
Operating Temperature| o·c to ss·c
Certifications| CE, FCC, RoHS 3.0, IP67

Product Overview

Installation Set-up

The 2×2 UBR with integrated dish antenna has four studs on its backside for attaching the mounting bracket. The mounting bracket is designed in such a way that UBR can be mounted on the pole with the help of its attaching parts. It provides freedom of movement to the UBR for link alignment even after mounting.

  1. Use four M6 flange nuts and attach the hood with the UBR. Refer to the image below
    Note : Make sure that the cut in the hood aligns with lug connector.

  2. Attach pole clamp assembly with riveted U clamp with the help of three M6 hex bolts and split spring lock washers

  3. Mount this assembly from the previous step on UBR using three M6 hex bolts and split spring lock washers

  4. Once UBR is assembled, the next step is to mount on the pole using two MS x 220 bolts and four split spring lock washers and flat washers.

  5. Slightly loosen M6 bolts, rotate brackets to align the pointer mark, at an optimum angle to set the azimuth and elevation. Once the desired setting is attained, securely tighten the six bolts using a compatible spanner.

Getting the ion413_CPE Online

Power up

UBR can be powered up using PoE adaptor (48V) as shown below:

Note : For powering on UBR, only use HFCL POE adapter. Plug and Adaptor will vary by country/ region

Login and Configure the UBR

Follow the steps mentioned below and connect UBR to a network :

  1. Connect ethernet cable to the laptop/computer
  2. Connect the other end of ethernet cable to the data port on PoE adapter
  3. Connect UBR’s PoE supported ethernet port to PoE adapter power port. Device will be powered On
  4. Open web browser and enter “UBR IP address” in the address bar. The default static IP address for 2×2 UBR is set to “192.168.1.1”
  5. A login screen will appear
  6. Enter the default login credential details: User- admin, Password- HFcl!@23#ion
  7. Refer our user manual on our website io.hfcl,com for detailed information to configure UBR

Check the LED status

LED Color Status

Green LED

(Power indication)

| ****

Green color notifies the user that the device is powered ON


BLUE LED

(RSSI/Link indication)

| Single blink:-1 to -50 dBm Double blink:-51 to -60 dBm Triple blink:Greater than -60 dBm

NOTE – If link is down, then link LED will be in continuous OFF state.


BLUE LED

(Alarm Indication)

| Single blink:Minor Alarms Double blink:Major Alarms Triple blink:Critical Alarms

NOTE – During Reboot and Factory Reset, all the three LEDs will glow for 7 secs and the power LED will continue to glow.

Safety Precautions

Observe following safety precautions to avoid damage to the CDn4I3_CPE UBR :

  • Do not power the device during installation
  • Do not subject the device to high temperatures
  • Keep away from high voltage cables
  • Do not power off the unit in the middle of an upgrade process
  • The gland should be ground facing all the time
  • Make sure the earthing wire is connected properly to the earthing points
  • Do not open the enclosure when the UBR is working Fasten the device tightly

Contact Us:

Commercial Complex, Masjid Moth, Greater Kailash-11, New Delhi- 110048 HFCL Limited All Rights Reserved. 10 Networks and the 10 logo are registered trademarks of HFCL Limited.
Specifications are subject to change without notice.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

HFCL User Manuals

Related Manuals