ANOLiS Arcsource Outdoor 24MC Integral Fixture Instruction Manual
- June 3, 2024
- ANOLiS
Table of Contents
- ANOLiS Arcsource Outdoor 24MC Integral Fixture
- INSTALLATION INSTRUCTIONS
- STEP 1A MOUNTING – USING YOKE
- STEP 1B MOUNTING – USING FLOOR STAND
- STEP 1C MOUNTING – USING LAND SPIKE 100 MM / 130 MM
- STEP 1D MOUNTING – USING TENON ADAPTOR DIAMETER 63 – 80 MM / 80 – 106 MM
- STEP 1E MOUNTING – USING POLE CLAMP DIAMETER 63 – 80 MM / 80 – 105 MM
- STEP 2 CONNECTION
- STEP 3 INSTALLATION ACCESSORIES
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
ANOLiS Arcsource Outdoor 24MC Integral Fixture
INSTALLATION INSTRUCTIONS
Fixture must be installed by a qualified electrician in accordance with all
national and local electrical and construction codes and regulations.
This device falls under class one and must be grounded!
STEP 1A MOUNTING – USING YOKE
Mount the fixture via suitable mounting holes. Ensure that you are mounting the fixture to a secure and non-flammable surface.
Fasten the Yoke of the fixture to the surface by three screws.
STEP 1B MOUNTING – USING FLOOR STAND
Mount the luminaire to the Floor stand as illustrated on picture above and
fasten it by nut with washer to bolt on floor stand.
ArcSource Outdoor 24MC Integral mounted on the Floor stand.
STEP 1C MOUNTING – USING LAND SPIKE 100 MM / 130 MM
Insert the Land Spike into ground. Underground part of Land Spike should be placed perpendicularly into the ground. (if you need to use tools to insert spike in the ground, use of some protective layer, and applying pressure in the middle is recommended to prevent damaging of land spike)
Mount the luminaire to the Land spike as illustrated on picture above and
fasten it by two screws M8x20 with washers and spring washers.
ArcSource Outdoor 24MC Integral mounted on the Land Spike.
STEP 1D MOUNTING – USING TENON ADAPTOR DIAMETER 63 – 80 MM / 80 – 106 MM
Tenon Adaptor 63 – 80 mm and Tenon adaptor 80 – 106 mm
Slide the Tenon Adaptor (mortise) of suitable size on a tenon (e.g. top of a
metal post) and fasten in with three screws included in the adapter.
Mount the luminaire to the Tenon Adaptor as illustrated on picture above and
fasten it by two screws M8x25 with washers and spring washers.
ArcSource Outdoor 24MC Integral mounted on the Tenon Adaptor.
STEP 1E MOUNTING – USING POLE CLAMP DIAMETER 63 – 80 MM / 80 – 105 MM
-
Disassemble the Pole Clamp by unscrewing both nuts from bolts.
-
Mount the Pole Clamp to a pole and fasten it by screwing both nuts with washers back to its bolts. Adjust the Pole Clamp to ensure its correct position before tightening it completely..
-
When in correct position, tighten both nuts completely.
Place the luminaire to the Pole Clamp as illustrated on picture above and
fasten it by two screws M8x25 with washers.
ArcSource Outdoor 24MC Integral mounted on each side of Pole Clamp.
STEP 2 CONNECTION
Single luminaire connection.
Connect DMX IN and Power cable to a Junction box and Power/data cable from the
Junction box to the luminaire.
Multiple luminaire connection.
Use power/data cable for connection between Junction boxes as illustrated on
picture bellow. Notice the change of connection be-tween first two and all
following junction boxes of the daisy chain line.
-
Removing the Cover of Junction Box
Open the Junction Box by unscrewing 4 M4x20 screws and lifting up the cover. -
Install Housing
Mount the Junction Box to a surface via two mounting holes and suitable fasteners. -
Strip these lengths for wire connections
Power Connection| 9 mm
---|---
Data Connection| 7 mm
Connection – color coding
Power Connection – Power IN
| L| N| GROUND
---|---|---|---
Core (EU)| Brown| Blue| Green/Yellow
Core (US)| Black| White| Green
DMX CONNECTION
0 V | D- | D+ |
---|---|---|
Data Ground | Data – | Data + |
Cable CE/US Leader – LED Output
WIRE | DATA AND POWER CONNECTION |
---|---|
Brown | Live |
Blue | Neutral |
Yellow/Green | Ground |
Red | + |
White | – |
Shielding | 0 |
-
Wiring connection – Daisy chain – First Junction Box EU color code shown
Connection scheme for the first Junction Box in daisy chain line. -
Wiring connection – single LED unit EU color code shown
Connection scheme for the installations of single luminaire. -
Wiring connection – Daisy chain – Following Junction Boxes EU color code shown
Connection scheme for each following Junction Box in daisy chain line. Only power/data cables are used. -
Cable gland installation
Use wrench size 24 for cable gland M20x1.5
Install Cable glands individually!
Apply Loctite 5331 thread sealant on the plastic holder and Loctite 577 thread
locking compound on the gland body in the indicated locations prior to
assembly.
Failure to properly install cable glands will result in failure of the water
tight seal!
-
Close junction box
-
Install safety cover and top cover back.
Before applying the torque, make sure the thread is clean and functional.
STEP 3 INSTALLATION ACCESSORIES
ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu www.anolis.eu www.anolislighting.com VERSION 1 / 1_07_2021
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>