ANOLIS Ambiane AP LED Lighting Instruction Manual
- June 3, 2024
- ANOLiS
Table of Contents
ANOLIS Ambiane AP LED Lighting
INSTALLATION
WARNING: The unit must be installed by a qualified electrician in accordance with all national and local electrical and construction codes and regulations.
STEP 1.A CEILING OPENING: Prepare a mounting hole with a diameter between 212-214 mm.
STEP 1.B CEILING OPENING: Use of the Adapter ring is recommended in case of a bigger ceiling opening. See step 6.B before connecting power and data
STEP 2 PRIMARY POWER CONNECTION: Install terminal blocks on cable and connect it to the Primary power connection of Ambiane AP‘s control unit.
STEP 3 DATA CONNECTION (DMX OR DALI): Install terminal blocks on DMX or DALI cables and connect them to the control unit.
STEP 4 SECONDARY POWER CONNECTION 48V: Install terminal blocks on cable and connect it to the control unit.
STEP 5 DIP SWITCH: Unscrew 2 screws on the control unit and remove plastic cover. Set the DIP switches to positions according to your operation mode. The fixture can be controlled by DMX or DALI. Set 11=OFF for control by DMX or DALI.
STEP 6.A LUMINAIRE INSTALLATION: Lift up springs on both sides, insert luminaire into ceiling opening and release springs to hold lumaire in place.
STEP 6.B LUMINAIRE INSTALLATION WITH ADAPTER RING:
- Slide Adapter ring under the control unit and above both spring.
- Lift up both springs and slide Adapter ring under them.
- Install Adapter ring to position as above.
- Lift up springs on both sides, insert luminaire into ceiling opening and release springs to hold lumaire in place.
STEP 7 INSTALLTION OF ACCESSORIES – ANTI-GLARE RING:
- Insert the Anti-Glare ring into the Ambiane AP until three locks snap into slots.
- Click on Anti-Glare ring.
ROBE lighting s. r. o.
- Palackeho 416
- 757 01 Valasske Mezirici
- Czech Republic
- Tel.: +420 571 751 500
- E-mail: info@anolis.eu
- www.anolis.eu
- www.anolislighting.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>