BLUE JAY 19D Single Phase Energy Meter User Manual
- September 25, 2024
- BLUE JAY
Table of Contents
- BLUE JAY 19D Single Phase Energy Meter
- Product Usage Instructions
- SUMMARIZE
- TECHNICAL PARAMETERS
- INSTALLATION AND START-UP
- SCREEN DISPLAY
- OPERATION MENU DESCRIPTION
- COMMUNICATION INTERFACE
- SAFETY CONSIDERATIONS
- MAINTENANCE
- TECHNICAL SERVICE
- Calculation formula of electrical parameter
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
BLUE JAY 19D Single Phase Energy Meter
Specifications
- Product Name: 19D-22D Single Phase Energy Meter
- Version: 1.10
- Maximum Current Access: 100A
- Accuracy: Class 1.0s
- Display: LCD with white backlit
- Maximum Display Value: 9999999MkWh
- AUX Power: 85-275V AC, 5M
Product Usage Instructions
Installation and Start-Up
- Ensure that the power supply is within the instrument’s specifications before turning on the meter.
- During installation, keep the current input terminal non-open and voltage input terminals non-short-circuited.
- Avoid imposing high pressure on the communication terminal (RS232/RS485).
- Verify that the instrument wiring matches the internal system settings.
- When communicating with a PC, ensure that the instrument communication parameters match the PC settings.
Frequently Asked Questions
Q: What are the main features of the 19D-22D single-phase energy Meter?
A: The main features include:
- Energy import and export measurement (IMP & EXP)
- Detection of active/reactive energy, power, frequency, max demand, voltage, current, etc.
- High light white backlit LCD screen
- Energy pulse output
- RS485 Modbus communication (optional)
- Standard 35mm din rail mounting
Read me
When you use 19D-22D single phase energy meter, be sure to read this user
manual carefully, and be able to fully understand the implications, the
correct guidance of operations in accordance with user manual, which will help
you make better use of 19D-22D single phase energy meter, and help to solve
the various problems at the scene.
- Before the meter turning on the power supply, be sure that the power supply within the provisions of the instrument;
- When installation, the current input terminal must non-open, voltage input terminals must Non-short circuit;
- Communication terminal (RS232/RS485) is strictly prohibited to impose on high pressure;
- Be sure the instrument wiring consistent with the internal system settings;
- When communicating with the PC, instrument communication parameters must be consistent with the PC.
- Please read this user manual carefully
- Please save this document
SUMMARIZE
19D-22D single phase energy meter is suit for single-phase measurement, use scenarios such as residential, public facilities, and industrial use. 19D-22D can measure and display various important power parameters, optional communication ports support remote reading and monitoring. Bi-direction metering makes 19D-22D is an excellent choice for solar energy industry.
FEATURES
- Provide energy import and export measurement (IMP & EXP)
- Detect active/reactive energy, power, frequency, max demand, voltage, current, etc.
- High light white backlit LCD screen
- Energy pulse output
- RS485 Modbus communication (optional)
- Standard 35mm din rail mounting
- Maximum 100A current access
- Accuracy: Class 1.0s
APPLICATIONS
- All power parameter measurement;
- Energy measurement and electrical fire monitor and control;
- Transformers, generators, capacitors and electric motors distributed detection;
- Medium and low pressure systems;
- SCADA, EMS, DCS integrators.
TECHNICAL PARAMETERS
Measurement & Display
Voltage| Rated 230V RMS value, Accuracy 0.5%,
Current| Rated 10A, Max 100A, Start amp 0.04A, RMS value. Accuracy 0.5%;
Overload 30times In in 0.01sec
Frequency| 50/60Hz, Accuracy ±0.01Hz
Display| LCD with white backlit
Maximum display value| 9999999MkWh
AUX Power| 85-275V AC, <2W/10VA
Output
Digital port| RS-485 MODBUS-RTU
Pulse port| 1600imp/kWh
Other
Working environment| -25~55°C Altitude ≤2500m, 0~95%RH, non-condensing, non-
corrosive gas
Storage environment| -40~70C
Voltage tolerance| 2KV 1min
Shock voltage| 6KV-1.2uS waveform
Insulation| Input, output, power supply to Shell >5MΩ
INSTALLATION AND START-UP
The manual you hold in your hand contains information and warnings that the user should respect in order to guarantee a proper operation of all the instrument functions and keep it in safety conditions. The instrument must not be powered on and used until its definitive assembly is on the cabinet’s door.
If the instrument is not used as manufacturer’s specifications, the protection
of the instrument will be damaged.
When any protection failure is suspected to exist (for example, it presents
external visible damages), the instrument must be immediately powered off. In
this case contact a qualified service representative.
Installation
Mounting
Instrument is to be mounted on 35mm Din-rail. Keep all connections into the
cabinet. Please note that with the instrument powered on, the terminals could
be dangerous to touch and cover opening actions or elements removal may allow
accessing dangerous parts. Therefore, the instrument must not be used until
this is completely installed.
Notes :
Input signal: 19D-22D using a separate acquisition calculate for each
measurement channel, to ensure consistent in use, for different load forms,
it’s a variety of connection mode. Access wire shall be met 3 square mm.
-
Voltage input
Input voltage should not exceed the rated input voltage products 450V.
Otherwise, you should use external VT. Suggest 1A fuse be installed in the voltage input side. -
Current Input
Standard input current is 5A or 1A, if greater than 5A/1A should use external CT.
When the CT is connected with other meters, make sure wiring methods be used in series.
Warning: Forbid to install a CT on the live feeder wire with open secondary leads. This can be extremely dangerous!
Before remove the current input connection, must be sure to disconnect the primary circuit or shorted secondary circuit of CT. -
equence of wire
- Warning: Please make sure that the input voltage and current corresponding to the same phase, sequence, and the same direction; Otherwise, the Values and symbols will be wrong! (Power and Energy)
- Always observe the physical orientation of CT (P1 – P2) when installing on the feeder wire. Always pay attention to wiring polarity and phasing when terminating the CT leads to the 19D-23C. S1 connect to Ix*, S2 connect to Ix.
- The input network configuration of instrument depends on the CT number of the system:
- in the condition of 2 CT, select the three-phase, three-lines two components;
- in the condition of 3 CT, select the three-phase, four-lines three component mode.
- Instrument connection mode, set of the instrument (programming input network NET) should be the same load wiring as measured wiring. Otherwise, the measurement instrument will lead to incorrect voltage or power.
-
Auxiliary power
19D-22D with universal (AC / DC) power input, if not for a special statement, we provide the 90-240AC/DC power interface for standard products, please ensure that the auxiliary power can match with meter to prevent unexpected damage.- Suggest install 1A fuse in the fire line side.
- For the areas with poor power quality, suggest install lightning surge suppressor and rapid burst suppressor to prevent lightning strikes.
Typical Wiring
Note
This connection drawing is for reference only; the actual connecting terminal
please refer to the label on the rear part.
WARNINGS
- Must choose suitable cable size to connection, please refer the meter measurement range and actual load condition.
- The communication wire must use shielded twisted pair.
- Communication line RS485+, RS485- cannot be reversed.
- If need long distance communication to host, must parallel connect 100~120ohms resistor in both terminal of host to slave.
- In 9600 baud rate, the cable length should less than 1200 meters.
SCREEN DISPLAY
Screen description:
- .- 7 digital show energy value
- .- Symbol for SUM energy record value
- .- Symbol for multi-tariff function
- .- Imp for energy consumption, Export for energy generate 5.- Symbol for Maximum demand
- .- Symbol for average value
- .- PF=power factory; Hz=Frequency
- .- Pulse output channel 1 and channel 2
- .-symbol for communication active
- .- symbol for timer
- .- symbol for screen locked
Click for “left”, can move cursor to left or change to forward screen Press
and hold for Enter operation menu
Click for “right”, can move cursor to right or change to next screen, Press
and hold for confirm setting
OPERATION MENU DESCRIPTION
Button description
- Short press is the left key to switch the viewing interface;
- Long press is the menu key to enter and modify parameters.
- Short press is the right key to switch the viewing interface;
- Long press is the confirmation key to save the modified data.
Main menu
In regular measurement screen, press and hold button can access operation
screen. Panel main area will show “Pass” for ask password, then press and hold
button can entry password (default are 0001).
Description of menu characters:
COMMUNICATION INTERFACE
Connection for RS485 BUS
The composition of the RS-485 cabling must be carried out with a meshed screen
cable (minimum 3 wire), diameter of not less than 0.5mm2, with a maximum
distance of 1,200 m between the 19D-22D… and the master unit. This Bus may
connect a maximum of 32pcs.
Notes
- For communication with the master unit, user can choose RS-485 to RS-232 converter or RS485 to USB adapter to use.
- For expand the number of devices in the communication network, a signal repeater can be used. -. RS485 PIN number is 58,59,60
- Due to product modifications or special requirements, the interface pin place may be change. For details, please refer to product label on the rear side
Modbus RTU Frame Format
- Address code 1 BYTE Slave device address 1-247
- Function code 1 BYTE Indicates the function codes like
- read coils / inputs
- Data code 4 BYTE
- Starting address, high byte
- Starting address, low byte
- Number of registers, high byte
- Number of registers, low byte
- Error Check code 2 BYTE Cyclical Redundancy Check ( CRC )
MODBUS FUNCTIONS
Code Meaning Description
-
FUNCTION 01 Read Coil Status Only valid when equipped DO port
-
FUNCTION 02 Read Input Status Only valid when equipped DI port
-
FUNCTION 03 Reading of n Words This function permits to read all the electrical parameters
-
FUNCTION 05 Force Single coil When DO in remote control mode can work
-
FUNCTION 06 Preset Single register
Disable in default -
If need valid this code, please contact Blue Jay Sales Team before your order!
Note: Float data follow IEEE754, float low bit first, high bit next. (CD AB)
Register Map
Basic power data – Primary side
Address | Data | Byte mode | Notes |
---|---|---|---|
0x00 | U | float | 2 |
0x0c | I | float | 2 |
0x12 | P | float | 2 |
0x1a | Q | float | 2 |
0x22 | S | float | 2 |
0x2a | PF | float | 2 |
0x32 | FR | float | 2 |
0x34 | Ep+ | float | 2 |
0x36 | Ep- | float | 2 |
0x38 | Eq+ | float | 2 |
0x3a | Eq- | float | 2 |
Example
Host inquiry slave device
Addr
.
| Func
.
| Data Address high| Data Address low| Data Number high| Data number low| CRC16
low
| CRC1
6 high
---|---|---|---|---|---|---|---
0CH| 03H| 00H| 00H| 00H| 06H| C4H| D5H
PC user ask upload UA, UB, UC, IA, IB, IC
Slave device response
Addr.| Func.| Byte count| Data1 high| Data1
low| Data2 high| Data2 low| Data3 high|
Data3 low
---|---|---|---|---|---|---|---|---
0CH| 03H| 0CH| 03H| E8H| 03H| E9H| 03H| E8H
Data4 high| Data4 low| Data5 high| Data5
low| Data6 high| Data6 low| CRC16
low
| CRC16
high
|
13H| 84H| 13H| 88H| 13H| 8AH| A6H| D6H|
Show the data
- UA=3E8H (100.0)
- UB=3E9H (100.1)
- UC=3E7H (99.9)
- IA=1384H (4.996)
- IB=1388H (5.000)
- IC=138AH (5.002)
Notes
- Blue Jay disable the 06 function in default setting, if Activated the write command, please check the host device program to avoid the meaningless write operation, that may reduce the reduce the register working life.
- When the write is unsuccessful, no return data from the slave device. In this addition, please resend write inquiry again.
SAFETY CONSIDERATIONS
All installation specification described at the previous chapters named:
INSTALLATION AND STARTUP, INSTALLATION MODES and SPECIFICATIONS.
Please note that with the instrument powered on, the terminals could be
dangerous to touching and cover opening actions or elements removal may allow
accessing dangerous parts. This instrument is factory-shipped at proper
operation condition.
- The device must have a professional installation and maintenance
- Any operation of the device, you must cut off the input signal and power;
MAINTENANCE
The 19D-22D single phase energy meter does not require any special
maintenance. No adjustment, maintenance or repairing action should be done
when the instrument is open and powered on, should those actions are
essential, high-qualified operators must perform them.
Before any adjustment, replacement, maintenance or repairing operation is
carried out, the instrument must be disconnected from any power supply source.
When any protection failure is suspected to exist, the instrument must be
immediately put out of service. The instrument’s design allows a quick
replacement in case of any failure.
TECHNICAL SERVICE
FAQ’s
-
Once cabled and connected is seen to give a correct voltage and current reading, but shows negative values for active power (generation).
This is an error with the cabling for the current transformer secondary; the direction of the transformer current has to be respected as shown in the connection diagram. The current transformers have a two face primary; the current must pass from P1 to P2 giving the result in secondary (S1 and S2) of 5 amps.
The error stems from:- The current transformers have been incorrectly installed. As a result, it gives the direction of the current as passing from P2 to P1; to resolve this problem, the current transformer does not have to be dismantled and installed again, but the transformer secondary (S1 and S2) just has to be inverted.
- The connection of the current secondary in the current transformers have been incorrectly connected; to resolve this problem just connect the S1 transformer secondary to the S1 on the meter and the S2 on the current transformer to the S2 on the meter.
-
Once cabled and connected, is seen to give an incoherent Power factor and CosΦ reading (-
0.01 or similar).
This is again a current transformer and voltage phase connection error phase A, must correspond to the current transformer installed in phase A; phase B, must correspond to the current transformer installed in phase B; and phase C, must correspond to the current transformer installed in phase C.
This connection terminal is clearly shown on the area side of the device. -
The measuring voltage and is displaying the secondary voltage (for example 110 volts).
Ensure that the voltage Transformer ratio has been correctly set. -
Device does not correctly display the current reading. It shows values varying between 0 to 5 amps of current.
Ensure that the Current Transformer ratio has been correctly set.
Calculation formula of electrical parameter
Note: In above formula, N for sampling points in one AC wave.
For any inquiry about the instrument performance or any failure,
contact to Blue Jay’s technical service.
Blue Jay – After-sales service
E-mail: tech@cqbluejay.com
Tel: +0086-023-67628702 Email: tech@cqbluejay.com
www.cqbluejay.com
Add: 1802,Building 2,No.88,Jianxin East Road,Chongqing,400020,China
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>