Eastbrook 36.0061 Vanity Units Bathroom Furniture Instruction Manual
- August 6, 2024
- Eastbrook
Table of Contents
- Eastbrook 36.0061 Vanity Units Bathroom Furniture
- Product Information
- Product Usage Instructions
- Frequently Asked Questions
- BEFORE INSTALLATION
- TOOLS REQUIRED
- Installation Instructions
- Components Adjustment
- Aftercare and Maintenance
- Contact Information
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Eastbrook 36.0061 Vanity Units Bathroom Furniture
Product Information
Specifications:
- Product Type: Bathroom Furniture – Vanity Units
- Installation Types: Floorstanding and Wall Hung
- Material: High-quality composite materials
- Color Options: Various painted surface colors
- Aftercare: Regular maintenance is required as per instructions
Product Usage Instructions
Installation for Floorstanding Vanity Units:
- Mark two holes levelly on the wall.
- Drill the holes using the appropriate size drill bit.
- Insert expansion wall plug or suitable alternative wall fixing.
- Screw in the tapping screws and add cover caps.
- Apply an adequate amount of silicone between the basin and unit to prevent water ingress.
Installation for Wall Hung Vanity Units:
- Mark the holes levelly on the wall.
- Drill the holes using the drill bit of the proper size.
- Insert expansion wall plug or suitable alternative wall fixing.
- Screw in the tapping screws.
- Apply silicone between the basin and unit to prevent water ingress.
Components Adjustment:
- Drawer Slider Adjustment: Turn the screw clockwise to raise the drawer and anti-clockwise to lower it.
- Soft Closing Hinge Adjustment: Adjust up/down, in/out, left/right as needed for proper operation.
- Wall Hanging Bracket Adjustment: Lengthen the hook’s protrusion by turning the screw anti-clockwise.
Aftercare and Maintenance:
- Ensure proper ventilation in your bathroom.
- Avoid abrasive cleaning materials and acidic substances.
- Maintain a pH-neutral cleaning routine (pH of 7).
- Keep the vanity unit dry and free from continuous moisture.
- Regularly wipe off spillages and splashes.
- Check hinges and sliders every 6 months; tighten any loose screws.
Frequently Asked Questions
Q: What should I do if I notice any damage to the vanity unit during installation?
A: Never install damaged products or components. Contact customer support for assistance and replacement parts if needed.
Q: How often should I check the hinges and sliders for adjustment?
A: It is recommended to check and adjust hinges and sliders every 6 months to ensure smooth operation of the vanity unit.
Q: Can I use any type of cleaning agent on the vanity unit?
A: Avoid abrasive or acidic cleaning materials. Use cleaning agents with a neutral pH of 7 to maintain the surface finish.
BEFORE INSTALLATION
PLEASE READ THE BELOW NOTES BEFORE INSTALLING YOUR VANITY UNITS.
- Use protective gloves and eye protection at all times
- Please use qualified plumbers to install the vanity unit
- 2 people are required to install the units
- Check the parts are fully supplied
- Never install products or components that look damaged
- Hinges for doors and sliders for drawers may need to be checked and adjusted to achieve proper position after installation
- Please avoid direct sunlight as this will affect the painted surface color change
- If fixing to a stud or paneled wall, the proper framework is required to support a wall-hung unit
TOOLS REQUIRED
NECESSARY TOOLS (not supplied)
Installation Instructions
- Installation for Floorstanding Vanity Units
- Mark the two holes levelly on the wall.
- Drill the holes using the drill bit of the proper size.
- Insert expansion wall plug or appropriate alternative wall fixing.
- Screw in the tapping screws.
- Add cover caps on the screws.
- When fitting the basin to the unit, adequate silicone is required between the basin and unit to prevent potential water ingress.
- Installation for Wall Hung Vanity Units
- Mark the holes levelly on the wall.
- Drill the holes using the drill bit of the proper size. Insert expansion wall plug or appropriate alternative wall fixing.
- Screw in the tapping screws.
- When fitting the basin to the unit, adequate silicone is required between the basin and unit to prevent potential water ingress.
Components Adjustment
-
Drawer slider adjustment
If you need some fine adjustment, turn the screw clockwise to get the drawer “up”, and turn the screw anti-clockwise to get the drawer “down” -
Soft closing hinge adjustment
-
Wall hanging bracket adjustment
- Turn the screw anti-clockwise to lengthen the hook’s protrusion
- Once the vanity unit is fitted, if required, turn this screw clockwise for “down” and anti-clockwise for “up”
Aftercare and Maintenance
- Make sure your bathroom is well-ventilated
- Do not use abrasive cleaning materials which will hurt the surface finish
- Do not use any cleaning with acidic substances or soda. We suggest using cleaning agents with a PH of 7
- The vanity unit must be kept dry and not subject to continuous moisture
- All spillages and splashes must be wiped off
- Do not lean on fully opened doors or drawers
- Check the hinges and sliders every 6 months and any loose screws must be tightened
Contact Information
- Eastbrook Road, Gloucester GL4 3DB
- Technical Helpline: 01452 317890 (Open times: Mon – Fri 8:00 am-17:pm)
- Email: technical@eastbrookco.com.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>