Eastbrook 98.2007 Meriden Wall Mounted Basin Mixer Tap Instruction Manual
- July 26, 2024
- Eastbrook
Table of Contents
Eastbrook 98.2007 Meriden Wall Mounted Basin Mixer Tap
Product Information
Specifications
- Installation Diagram: Figure I
- Wall Distance: 48-60 cm
- Installation Height: 120 cm
- Temperature Range: 180-200 °C (Hot), Cold
- Valve Body Size: 120
- Thread Size: 2-G1/2
- Material: Plastic, Metal
Product Usage Instructions
Installation Procedure
- Ensure the wall distance is between 48-60 cm and the installation height is 120 cm.
- Use the provided plastic expansion screw to secure the valve body to the wall.
- Insert plastic sleeves into the wall for added support.
- Attach the flange and plastic plug according to the dimensions specified in Figure II.
- Connect the outlet pipe and handle using the provided screws and Allen Key.
- If water flow reduces over time, use the plastic spanner to clean the aerator.
Aftercare Instructions
Regularly clean the product with a soft damp cloth. Avoid abrasive cleaners or
detergents as they may damage the finish. Follow the provided instructions for
proper care and maintenance.
Additional Information
The product comes with a guarantee against faulty material or manufacture,
excluding serviceable parts. Ensure proper installation, care, and usage for
warranty coverage.
FAQ
Q: What should I do if the water flow is reduced?
A: If water flow reduces, use the plastic spanner to clean the aerator as
described in the manual.
INSTALLATION PROCEDURE
- Before installation, flush the water supply pipe to make sure all silt and debris have been removed.
- As Figure I showed, Connect the Cold and Hot inlet water pipe with the two G 1/2″ female threads of the valve body (NO. 1) . ( Wrap PTFE tape on the thread or use glue seal).
- Use three plastic expansion screws (NO. 2) and Self-tapping screws (NO. 3) to fix the valve body (NO. 1) on the suitable position of the wall.
- Pull out the plastic sleeve (NO. 5), screw the plastic plug (NO. 4) on the tap body ( NO. 1) tightly.
- Open the cold and hot water supply, and check all joints and connections of the valve body for leakage. Then put on a plastic sleeve (NO. 5) after check there is no leakage.
- Decorate the wall (Pay attention to the size of the installation hole).
- As Figure II showed, unscrew the plastic plug (NO. 4), then pull out the plastic sleeve (NO. 5), then install the flange (NO. 6).
- As Finger III showed, unscrew the round screw nut (NO. 9), then pull out the water outlet pipe (NO. 10).
- Wrap PTFE tape and apply glue on the G 1/2″ thread of the adapter connector (NO. 8), Then screw the adapter connector (NO. 9) on the G 1/2″ female thread of the valve body.
- Install the Flange (NO. 7).
- Insert the outlet pipe (NO. 10) into the inner hole of the connector (NO. 8), then use a round screw nut (NO. 9) to fix the outlet pipe (NO. 10) . (Pay attention that the outlet pipe (NO. 10) must be inserted in place) .
- Unscrew the handle spindle (NO. 16), lose the M5 screw (NO. 15) by S2.5 Allen Key (NO. 13), then place the handle (NO. 12) on the stem spool (NO. 14). Tighten the M5 screw (NO. 15) by S2. 5Allen Key to fix the handle (NO. 12). (Pay attention to the installation direction of the handle).
- Screw the handle spindle (NO. 16) on the handle (NO. 12).
- Open the cold and hot water supply, and check all joints and connections for leakage.
Guarantee & Aftercare
When installing or using tools, extra care must be taken to avoid damaging the finish or fitting. To maintain the appearance, please ensure it is cleaned regularly using a clean soft damp cloth only. Abrasive cleaners or detergents must not be used as they may cause surface deterioration. The company provides a guarantee against faulty material or manufacture excluding serviceable parts, provided they have been installed, cared for, and used per our instructions.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>