Product Information

  1. Product Name: Heat Only Primary/Secondary Header
  2. Product Description: The Heat Only Primary/Secondary Header is an accessory part used in boiler systems. It is designed to connect to the system piping and facilitate the proper flow of hot water.
  3. Part Number: 111884-01

Product Usage Instructions

  1. Assemble the manifold according to the provided diagram in Figure 1.
  2. Follow the piping section of the Installation, Operating, and Service Instructions to connect the header to the system piping. The connections can be sweat or press with a size of 1-1/4 inches.
  3. Complete the Start-Up and Checkout process as described in the Installation, Operating, and Service Instructions.

Important Safety Warnings:

  • Asphyxiation Hazard. Fire Hazard. Explosion Hazard. This boiler must be installed, serviced, or repaired by a qualified installer, service agency, or gas supplier. Improper installation, adjustment, alteration, service, or maintenance can cause severe personal injury, death, or substantial property damage. Read and understand the instructions and entire boiler manual before attempting to install the boiler and header.
  • Burn Hazard. Safety relief valve discharge piping must be piped near the floor to eliminate the potential for severe burns. Do not install shut-off valves between the safety relief valve and the boiler or between the safety relief valve and the discharge. A union may be installed in the safety relief valve piping.
  • Burn Hazard. Excessive heat during soldering could damage gaskets. All piping should be checked for leaks after assembly. Failure to do so could result in personal injury or substantial property damage.

Product Diagram:

Heat Only Primary/Secondary Header

WARNING
Asphyxiation Hazard. Fire Hazard. Explosion Hazard.
This boiler must be installed, serviced or repaired by a qualified installer, service agency or gas supplier. Improper installation, adjustment, alteration, service or maintenance can cause severe personal injury, death, or substantial property damage. Read and understand these instructions and entire boiler manual before attempting to install boiler and header. Up to date boiler manual is posted on manufacturer’s website.

Instructions apply to the following accessory:

Accessory Part Description
111884-01 Primary/Secondary Header, Heat Only

Included with this accessory:

  • Header
  • Instructions
  • Gaskets

Recommended tools:

  • Pipe wrench
  • Adjustable wrenches
  • 5/8 in. wrench for pump flange

To install Header, perform the following steps:

  1. Assemble manifold as shown in Figure 1.
  2. Follow piping section of Installation, Operating and Service Instructions to connect to system piping. 1-1/4 in. connections can be sweat or press.
  3. Follow Start-Up and Checkout in Installation, Operating and Service Instructions.

WARNING
Burn Hazard.
Safety relief valve discharge piping must be piped near floor to eliminate potential of severe burns. Do not pipe in any shut-off valves between:

  1. Safety relief valve and boiler
  2. Safety relief valve and discharge. Union may be installed in safety relief valve piping.

WARNING
Burn Hazard.
Excessive heat during soldering could damage gaskets. All piping should be checked for leaks after assembly. Failure to do so could result in personal injury or substantial property damage.

Diagram

U-S-Boiler-Company-111884-01-Alta-Heat-Only-Primary-Secondary-
Manifold-1 U-S
-Boiler-Company-111884-01-Alta-Heat-Only-Primary-Secondary-
Manifold-2

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals