NGP SLAL-75-BP Aluminum Sliding Door Installation Guide

July 26, 2024
NGP

NGP SLAL-75-BP Aluminum Sliding Door

Specifications

  • SKU: SLAL-75-BP / SLAL-75-BPF
  • Track Lengths: 48″, 60″, 72″, 96″
  • Max Door Weight: 75 lbs. each
  • Door Thickness: 3/4″ to 1″

Product Usage Instructions

  • Prepare Opening
    • Measure the opening height required based on the door height plus specific measurements provided in the manual.
  • Install Track and Hangers
    • Use the provided screws to install the track and hangers. Ensure they are positioned correctly as per the instructions.
  • Hang Doors
    • Hang the doors on the hangers, making sure they rest properly on the rear rail.
  • Adjust and Finish
    • Adjust the doors for proper overlap and ensure they slide smoothly. Attach the pulls for easy opening and closing.

FAQs

  • Q: What is the maximum weight capacity of each door for this hardware?
    • A: The hardware is designed for doors up to 75 lbs. each.
  • Q: What is the recommended door thickness for installation?
    • A: The recommended door thickness is between 3/4″ to 1″.

INSTALLATION INSTRUCTION

Track

  • (2) Front Hangers
  • (2) Back Hangers
  • (2) Brass Pulls
  • (2) Chrome Pulls
  • (1) Bottom Guide
  • 8 x 5/8″ PH SMS

  • 8 x 1 3/8″ PH SMS

  1. Prepare Opening
    • Opening Height Max = Door Height + 2 1/16″
    • Opening Height Min = Door Height + 1 3/4″
    • SLAL-75-BPNGP-SLAL-75-BP-Aluminum-Sliding-Door-FIG-1 \(1\)
    • SLAL-75-BPFNGP-SLAL-75-BP-Aluminum-Sliding-Door-FIG-1 \(2\)
    • Side Mount Selection Chart****
      Door Thickness| 3/4″| 1″| 1 1/8″| 1 3/8″
      ---|---|---|---|---
      Front Hanger| (B) Deep Offset| A| A| A
      Back Hanger| (A) Thin Offset| B| B| B
      Door Gap| 5/16″| 3/4″| 5/8″| 3/8″
  2. Install Track and Hangers
    • Center track in opening and secure with (#8 x 1 3/8″) screws
    • Secure hangers onto door with #8 x 5/8″ screws provided 1 1/4″ in from each door edge as shown
    • Raise hangers to top adjustment as shown
  3. Hang Doors
    • Mount the rear door first by tilting the door back and resting the carrier on the rear rail
    • Repeat for the front door on the front railNGP-SLAL-75-BP-Aluminum-Sliding-Door-FIG-1 \(4\)
  4. Adjust and Finish
    • Adjust carriers so the door is square with a frame
    • Install a floor guide in the center of the opening, where doors overlap
    • Drill 2 1/8″ diameter holes 3/8″ deep to mount door pulls

CONTACT

  • NGP MEMPHIS
  • NGP VEGAS
    • 4584 Calimesa Street
    • Las Vegas, NV 89115
    • vegasorders@ngp.com
    • NGP-SLI-SLAL-75-BPF-PRI-0531-B
    • ngp.com.
    • 1-800-NGP-RUSH
    • For the complete list of Aluminum Sliding Door Hardware, the most up-to-date product information, and installation instructions, scan the QR code or visit ngp.com.NGP-SLAL-75-BP-Aluminum-Sliding-Door-FIG-1 \(7\)

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals