Specifications

  • Model Numbers: SLSS2-6, SLSS2-8
  • Material: Stainless Steel
  • Door Opening Height: 78-3/4″ (SLSS2-6), 98-7/16″ (SLSS2-8)
  • Track Length: 16″ (406mm)
  • Guide Side Height: 7-13/16″ (193mm)
  • Minimum Door Overlap: 2″ (51mm)

Product Usage Instructions

  • Prepare Hanger
    • Remove the anti-rise pin from the hanger using the provided tool.
  • Prepare Door for Hanger
    • Drill four holes in the door for the two hangers. Ensure proper measurements for door thickness.
  • Mount Hangers to Door
    • Attach the hangers to the door using the tool provided.
  • Attach Brackets
    • Locate the centerline of the track and mark a horizontal line twice the door width long. Attach the wall portion of brackets into wall blocking.
  • Secure Track
    • Attach the track to the wall brackets and insert stops into the track ends.
  • Fit Door Guide to Floor
    • Mount the door guide to the floor using anchors and screws. Make sure to route the bottom of the door to receive the floor-mounted guide.
  • Hang Door
    • Lift the door onto the track and make adjustments to ensure it is plumb.
  • Adjust Stops
    • Adjust the stops as needed and tighten the set screws with sufficient force.
  • Re-attach Anti-Rise Pins into Hangers
    • Re-attach the anti-rise pins into the hangers for added security.

FAQs

  • Q: What is the recommended door overlap on the guide side?
    • A: The minimum recommended door overlap on the guide side is 2″ (51mm).
  • Q: What should I do if I need to use drywall spacers?
    • A: If using drywall spacers, use a 3/4″ drill bit to remove the gypsum board at bracket locations and replace it with appropriate thickness spacers against blocking.
  • Q: How do I adjust the stops on the door?
    • A: Adjust stops accordingly and tighten set screws with sufficient force to ensure they stay in place after final adjustment.

DIMENSION

WARNING: Must be installed into wall blocking. If you have questions about what type of wall blocking is required, consult a structural engineer.

NGP-SLSS2-6-Stainless-Steel-Sliding-Door-FIG-1
\(1\)TOOLS REQUIRED

NGP-SLSS2-6-Stainless-Steel-Sliding-Door-FIG-1 \(2\)

Dimensions shown: Inches (mm)
Notes:

  1. “X” = Door Overlap (2″ overlap recommended)
  2. Minimum door overlap on guide side is 2″ (51).
  3. Must be installed into wall blocking.
  4. If you have questions about what type of wall blocking is required, consult a structural engineer.
    • IMPORTANT: If bracket fasteners are loosened, they must be re-tightened using a minimum of 11 ft. lb. of torque.

PARTS

NGP-SLSS2-6-Stainless-Steel-Sliding-Door-FIG-1
\(3\)

INSTALATION

  1. Prepare Hanger
    • Remove the anti-rise pin from the hanger using the tool provided.
  2. Prepare Door for Hanger
    • Drill four holes for two hangers.
  3. Mount Hangers to Door
    • Attach hangers to the door with a tool (H) provided.NGP-SLSS2-6-Stainless-Steel-Sliding-Door-FIG-1 \(8\)
  4. Attach Brackets
    • Locate the centerline of the track as shown on the first page. Using a level, mark a horizontal line twice the door width long. Mark bracket screw locations, as shown on the first page, into WALL BLOCKING. Attach the wall portion of brackets as shown.
    • Optional drywall spacers SLSS-DWS
    • If using drywall spacers: use a 3/4″ drill bit to remove gypsum board at bracket locations. Use appropriate thickness spacers to replace the gypsum board removed and seat against blocking.
  5. Secure Track
    • Attach track to wall brackets as shown. Insert stops into track ends.
  6. Fit Door Guide to Floor
    • Mark for the position of door guide.
    • Check post fasteners for tightness.
    • Mount door guide to the floor with anchors and 2 ST4.2×25 screws.
    • Options:
    • Cut track to net length
    • Wall Mounted Guide
    • Bottom Channel Guide
    • (Requires 3/8″ x 7/8″ route in door bottom)NGP-SLSS2-6-Stainless-Steel-Sliding-Door-FIG-1 \(13\)
  7. Hang Door
    • Route the bottom of the door to receive floor floor-mounted guide as shown. Lift the door onto the track. Make adjustments to the hanger so that the door is plumb.
  8. Adjust Stops
    • Adjust stops accordingly. Tighten the set screw with sufficient force to drive the set screw into the bar after the final adjustment.
  9. Re-attach Anti-Rise Pins into Hangers

CONTACT

For the complete list of Stainless Steel Sliding Door Hardware, the most up- to-date product information, and installation instructions, scan the QR code or visit ngp.com.

NGP-SLSS2-6-Stainless-Steel-Sliding-Door-FIG-1 \(19\)

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals