INSTALLATION INSTRUCTIONS

**INSTALLATION INSTRUCTIONS

**

INSTALLATION INSTRUCTIONS
IMPORTANT SAFETY INSTRUCTIONS – READ ALL INSTRUCTIONS BEFORE USING

logo

  • TO AVOID FIRE, SHOCK OR DEATH: TURN OFF POWER SUPPLYING THIS EQUIPMENT, AND CONFIRM POWER IS OFF, before installing, removing or servicing this equipment.

  • This equipment MUST BE installed and serviced by an

  • Replace all doors and covers before connecting power to this

To be installed and/or used in accordance with electrical codes and regulations

LIMITED PRODUCT WARRANTY

For Leviton’s limited product warranty, go to www.leviton.com. For a printed copy of the warranty you may call 1-800-323-8920. Patents covering this product, if any, can be found on Leviton.com/patents.

INSTALLATION

WARNING: TO AVOID FIRE, SHOCK OR DEATH: TURN OFF
POWER SUPPLYING THIS EQUIPMENT, AND CONFIRM
POWER IS OFF, before installing, removing or servicing this equipment.

Step 1: Enclosure Knockouts

NOTE: Before removing any knockouts from the enclosure, consult the local electrical code to determine the knockout requirements.

  1. To remove knockouts (A) , first strike the center of the
  2. Pry each ring (B) up, one at a time, and grip both ends with a pair of
  3. Use the pliers to bend the rings until they disconnect from the enclosure (fig. 1).

Step 2: Enclosure Mounting

Surface Mounting

NOTE: Leviton® load centers can be inverted for bottom feed applications.

  1. Keyholes (C) at the top and bottom of the enclosure are provided to assist in the alignment and leveling of the enclosure (fig. 2).
  2. Temporary screws or nails (not provided) should be used in these keyholes during alignment and
  3. Four (x4) mounting holes (D) have been precut in the back of the enclosure for ease of installation (fig. 2).
  4. Use screws or nails (not provided) in these four (x4) mounting holes (D) to secure the enclosure to the
  5. Remove the temporary screws or nails that were used to align and level the enclosure through the keyholes (C).
    diagram, schematic

Flush Mounting

NOTE: Leviton load centers can be inverted for bottom feed applications.

  1. Four (x4) mounting slots (E) have been precut on the side of the enclosure for installation between
  2. Pierce the foil tape (F) on side of enclosure with a mounting screw or
  3. If using 1/2 inch sheetrock, align the embossed (1/2) line with the front of the stud to achieve optimal flush mounting (fig. 3).
  4. Use the mounting slots (E) on both sides of enclosure to mount the enclosure with screws or nails (not provided) (fig. 3).

Step 3: Phase, Neutral and Ground Conductors WARNING: Use ONLY approved fittings and clamps to avoid damage to wires.

  1. Bring the phase wires (G) , neutral (H) and ground (I) conductors into the enclosure through the predetermined

  2. Determine whether or not the application requires the use of a main circuit breaker (J) (fig. 4) , or if main lugs (K) (fig. 5) can be used based on the local electrical codes

  3. Connect the phase wires (G) , neutral (H) and ground (I) conductors to appropriate terminals and torque to spec in the terminations tabl e (fig. 4 or 5).
    diagram

  4. If installing with a main circuit breaker (J) , also install terminal covers (L) that have been provided (fig. 6).

  5. When installing this enclosure as the service entrance, the bonding strap (M)

(included) MUST BE installed (fig. 7). Torque to 20 lb-ins.

  1. When installing this enclosure as a sub panel, DO NOT install the bonding strap (M). NOTE: For Service Equipment, apply “SERVICE DISCONNECT” label (provided) to trim, near main breaker

NOTE: For Branch Equipment, apply “MAIN” label (provided) to trim, near main breaker handle.

  1. Connect the phase wires (G) , neutral (H) and ground (I) conductors to appropriate terminals and torque to spec in the terminations table (fig. 4 or 5).
    diagram

  2. If installing with a main circuit breaker (J) , also install terminal covers (L) that have been provided (fig. 6).
    diagram

  3. When installing this enclosure as the service entrance, the bonding strap (M)

(included) MUST BE installed (fig. 7). Torque to 20 lb-ins.

  1. When installing this enclosure as a sub panel, DO NOT install the bonding strap (M). NOTE: For Service Equipment, apply “SERVICE DISCONNECT” label (provided) to trim, near main breaker

NOTE: For Branch Equipment, apply “MAIN” label (provided) to trim, near main breaker handle.

Step 5: Installing Cover (Sold separately)

  1. Remove the main breaker knockout (R) if a main breaker was Do not remove in installations using the main lugs (K).
  2. Twist-outs (S) must be removed for each position that contains a branch circuit
  3. To remove twist-outs (S) , first strike with a screwdriver, then twist with pliers until detached (fig. 10).
    diagram, schematic

NOTE: Fill any unused open spaces in cover using filler plates

(see filler plate instructions).

  1. Install door using the cover screws (provided).
  2. Leviton covers contain a feature for adjustment in flush mounting

In flush mount applications for covers larger than 42 spaces, dead front interlock tabs MUST BE disengaged to allow for adjustment of dead front position (fig.11a). Turn each adjustment screw (T) until the cover fits tightly against the circuit breakers (fig.11b).

Apply circuit directory labels in the appropriate location depending on cover/door type.

Step 6: Complete the Installation

WARNING: Before providing power to the load center, check all electrical connections and confirm that the wiring is correct
Ensure that the main and all branch circuit breakers are in the OFF position. To energize, first turn ON the main breaker, and then turn ON each individual branch circuit breaker

SAVE THESE INSTRUCTIONS

TERMINATIONS

Termination Point| Wire Gauge| Strip Length| Torque
---|---|---|---
Main Breaker or Main Lug| 300 MCM – #3 AWG| 1.0 in.| 250 lb-ins.
Main Neutral| 300 MCM – #3 AWG| 1.5 in.| 375 lb-ins.
Main Ground| 2/0 AWG – #4 AWG| 0.75 in.| 50 lb-ins.
Load Power (brass)| #4 AWG – #8 AWG

10 AWG – #14 AWG

| 0.40 in.

0.40 in.

| 45 in-lbs.

35 in-lbs.

Load Neutral (silver)| #4 AWG – #8 AWG

10 AWG – #14 AWG

| 0.40 in.

0.40 in.

| 45 in-lbs.

35 in-lbs.

Ground Bus| #4 AWG – #6 AWG

8 AWG

10 AWG – #14 AWG

| 0.50 in.

0.50 in.

0.50 in.

| 35 in-lbs.

25 in-lbs.

20 in-lbs.

diagram, schematic diagram

Read More About This Manual & Download PDF:

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals