ULINE Boltless Shelving Installation Guide

June 7, 2024
ULINE

ULINE Boltless Shelving

TOOL NEEDED

Rubber Mallet


PARTS

Upright Post x 4 (A)

|

Upright Post x 4 (A)

---|---

Front/Back Support x 10 (C)

|

Board x 5 (D)

ASSEMBLY

NOTE: Lean posts against a wall or assemble with another person.

  1. Connect two upright posts (A) by inserting a side support piece (B) at the bottom, middle and top of the posts. ( See Figure 1a )
    NOTE: The side support must be inserted so that the flat surface is on top. ( See Figure 1b )

  2. Repeat step one for the other two upright posts.
    NOTE: Each side has three side supports. Each shelving unit has six side supports.

  3. Connect the two upright post assemblies by inserting front/back supports (C) at the bottom, middle and top of each upright post (A). ( See Figure 2a )
    NOTE: The front/back support must be inserted so the inner v-channel is facing up. ( See Figure 2b )

  4. Attach the remaining front/back supports (C) at the desired shelf levels. ( See Figure 3 )
    NOTE: Ensure all supports are fully seated.
    NOTE: Completed unit has 10 front/back supports and six side supports.

  5. Set boards (D) on top of supports. ( See Figure 4 )


1-800-295-5510
uline.com

Documents / Resources

| ULINE Boltless Shelving [pdf] Installation Guide
Boltless Shelving
---|---

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals