ULINE Wall Guard Hand Dryer Installation Guide

May 15, 2024
ULINE

HAND DRYER
WALL GUARD
INSTALLATION GUIDE
ULINE Wall Guard Hand Dryer

Wall Guard Hand Dryer

ULINE Wall Guard Hand Dryer - Figure 1 Recommended location of adhesive strips

SPECIFICATIONS

Size: 31-3/4″ x 15-3/4″ x 3/64″
Material: Stainless Steel 304
Net Weight: 3.6 Kg [7.93 Ib ]

INSTALLATIONS

Mounted with 4 strips of construction grade 3M adhesive tape [ Included ]

INSTALLATIONS

  1. Clean the wall surface with isopropyl alcohol prior to installation and make sure that the surface is dry and free of any dust and debris.

  2. Center the Wall Guard underneath the hand dryer so that the top of the Wall Guard is 1″ below the bottom of the dryer.

  3. Carefully measure and mark the wall surface for replacement of the Wall Guard with a pencil or temporary marker.

  4. Four strips of double-sided adhesive are included for each panel. Apply the tape strips to textured side of black or white panel and smooth side of brushed stainless steel panel as follows:
    • Lay out tape strips according to illustration at left.
    • Remove one strip and apply to either right or left side to start.
    • Press each tape strip firmly onto the wall as it is applied.
    • Continue untilall4stripsare applied.
    Note: Alignment is critical. Once placed on the wall, the Wall Guard can not be repositioned.

  5. Align the top edge of the Wall Guard with the marking on the wall and firmly press into place against the entire surface of the Wall Guard.

  6. Optional: After guard is applied to the wall you may add silicone sealant around edge.

CLEANING INSTRUCTIONS

Clean the installed Wall Guard with mild soapy water and soft cloth. Mild dish soap mixed with water in a spray bottle works better.
DO NOT USE any cleaner that contains any ammonia or abrasive cleansers to clean the surface.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals