ULINE Peanut Dispensers Instruction Manual
- June 7, 2024
- ULINE
Table of Contents
ULINE Peanut Dispensers
TOOLS NEEDED
RECOMMENDED HARDWARE (NOT INCLUDED)
PARTS
PART
|
QTY
|
H-185
|
H-186
---|---|---|---
Capacity|
———–
|
20 CU. FT.
|
40 CU. FT
Canvas Bag|
1
|
✓
|
✓
Chain and Rope|
1
|
✓
|
✓
Flex Tubing|
1
|
✓
|
✓
Steel Rod|
2
|
✓
|
✓
Valve Assembly|
1
|
✓
|
✓
Clamp Ring|
1
|
✓
|
✓
U-Bolt|
1
|
✓
|
✓
Pulley|
2
|
✓
|
✓
INSTRUCTIONS
NOTE: Read instructions thoroughly. Remove all components from box and locate all parts. Remove pulley and U-bolt from rope.
INSTALLING PULLEYS
- Attach pulleys to ceiling using hook or other secure method.
- Make sure one pulley is positioned directly above the center of dispenser and the other clears the side of bag so rope will not interfere when raising and lowering bag.
- Ensure rope tie-off method is in place (cleat, anchor, post, etc.).
INSTALLING VALVE ASSEMBLY
- Slide clamp ring over open side of tubing.
- Insert valve assembly into bottom of flex tubing. Ensure tubing covers entire flange.
- Turn yellow handles to desired position.
- Slide clamp ring down around tubing, covering flange, and tighten screw with flat head screwdriver.
SETTING UP CANVAS BAG
-
Locate two steel rods with tail ends.
-
Insert end of chain link into the loop of rod.
-
Repeat step two with the other chain links.
-
Insert one tail end through grommet at corner of canvas bag. Do not try to fit grommet into the loop.
-
Insert the other tail end through grommet on the opposite side of canvas bag.
-
Repeat step four and five with the second rod creating an “X” across the bag.
-
Locate U-bolt and remove the two nuts and plate from the bolt.
-
Place U-bolt over the center of rods “X” formation.
-
Re-insert plate then the two nuts on the U-bolt. Tighten nuts with pliers.
-
Thread rope through both pulleys.
-
Raise bag to desired height and tie off rope.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>