ULINE S-16139 Asphalt Pothole Filler Instructions

June 7, 2024
ULINE

ULINE S-16139 Asphalt Pothole Filler

TOOLS NEEDED

Broom

|

Shovel

|

Tamper

---|---|---

INSTRUCTIONS

  1. Sweep area to be repaired. Be sure to remove all loose material.
    NOTE: Product may become compressed during shipping, but this does not affect product quality. If product stiffens in the bag, roll the bag over a hard surface to loosen product to potting soil consistency.

  2. Fill area with asphalt pothole filler to a height that is 25% higher than the depth of the hole.
    NOTE: For repairs over 2″ deep, it is very important to apply this material in 1-2″ layers. Pour some material into the hole, compact it with a post or tamper and repeat until the area is repaired. Finished patch should be slightly crowned above surrounding surface.

  3. Compact with a tamper, a shovel or by driving over the area with the wheels of your car.

  4. Return any unused product to the bag and store for future use. The area is immediately ready to drive on.

NUMBER OF BAGS REQUIRED


DEPTH

| 2 SQ. FT.| 4 SQ. FT.| 6 SQ. FT.
2″| 1| 2|

3

3″

| 2| 3| 4
4″| 2| 5|

6

1-800-295-5510
uline.com

Documents / Resources

| ULINE S-16139 Asphalt Pothole Filler [pdf] Instructions
S-16139, Asphalt Pothole Filler
---|---

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals