ULINE S-16322 Plastic Storage Boxes Installation Guide

June 7, 2024
ULINE

ULINE S-16322 Plastic Storage Boxes Installation Guide

ASSEMBLY INSTRUCTIONS

BOX ASSEMBLY
  1. Fold side “A” inside box, so that it fits snugly against inside wall of carton. (See Figure 1)
    ASSEMBLY INSTRUCTIONS

  2. Fold sides “B” and “D” flat against side “C”. (See Figure 2)
    ASSEMBLY INSTRUCTIONS

  3. Fold sides “B”, “C” and “D” up to form bottom of carton. (See Figure 3)
    ASSEMBLY INSTRUCTIONS

  4. Place carton on flat surface. Lift side “D” up against carton wall. (See Figure 4)
    ASSEMBLY INSTRUCTIONS

  5. Lift side “B” against opposite carton wall. (See Figure 5)
    ASSEMBLY INSTRUCTIONS

  6. Push side “A” down against bottom of carton. (See Figure 6)
    ASSEMBLY INSTRUCTIONS

LID ASSEMBLY
  1. Lift side panels up and fold in small panels to center. (See Figure 7)
    ASSEMBLY INSTRUCTIONS

  2. Fold end panel up and over flaps to lock tabs into slots. (See Figure 8)
    ASSEMBLY INSTRUCTIONS

  3. Repeat step 2 on other end. (See Figure 8)

Contact: 1-800-295-5510

Website: uline.com

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals