SDC PD2090A Panic Device Top Latch Bolt Lock Instruction Manual

June 6, 2024
SDC

SDC PD2090A Panic Device Top Latch Bolt Lock

SDC PD2090A Panic Device Top Latch Bolt Lock

INSTALLATION

Installation-fig

  1. Review the installations shown in figures A through D. Center line of panic device deter-mines location of release.
  2. The locking bolt will function as long as it enters the top latch bolt at some point. If it is not possible to line up on the panic device center line, a larger notch may have to be cut in the lock stile of the door to clear the lock latch bolt.
  3. Remove bottom rod assembly.
  4. A metal filler block must be placed in the top rail at the point of automatic relock switch. This block must be flush with the top of the door (required for the automatic relock switch). Because of variables, this filler block is not supplied by SDC. Notch inside top rail at relock switch.
  5. After reinforcement tabs have been installed, attach power leads as shown in wire diagram.
  6. Insert lock into mortise and attach with machine screws provided.

SPECIFICATION

  • Faceplate: 10″ x 1-1/2” x 1/8″
  • I.D. Requirements: 10″ x 1-1/2″ x 1-1/2″
  • Solenoid: 24 VAC and 24 VDC available
  • (Continuous Duty 2 Stage): Pull-in Coil – 57.6 watt / 2.4 amp at 24VDC Holding Coil – 8.4 watt / .35 amp at 24VDC
  • Bolt: 1/2″ diameter x 1/2″ throw
  • B: Bolt position indicates bolt locked or unlocked 5 A. @ 30VDC
  • D: Door position indicates door open or closed 5 A. @ 30VDC

TROUBLESHOOTING

  • Top latch will not stand up: Adjust top latch.
  • Bolt will not retract: Check voltage at lock. Check the rating of the transformer. Check for cracks in the switch on side of the lock body.
  • Bolt projects too soon: Adjust auto relock switch
  • Bolt projects when door is open: ARS has been bypassed. Check to wire.

TYPICAL INSTALLATION FOR PANIC LOCK

Installation-fig 2

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals