RANGER CARGO RACK Installation Guide
- June 6, 2024
- RANGER
Table of Contents
INSTALLATION GUIDE
7 – 1/16″ ( center of the feet to the end of the crossbar )
1605-PHM or 1605-PHM3 CARGO RACK
ProMaster 136″ Wheelbase
INSTALLATION GUIDE
FOOT PLACEMENT GUIDE
VEHICLE | DIMENSION ( A ) |
---|---|
Nissan nV | 7″ |
Sprinter | 10″ hr, 6 – 1/2″ If |
transit | 8 – 7/8″ |
Promaster | 7 – 1/16″ |
16-UCD72 Crossbar
2 Bars ( 72″ )
PHASE 1 – ASSEMBLY
1.1 SETUP
1.1.1 Verify all parts are present.
BILL OF MATERIALS
Item No. | Description | Qty. |
---|---|---|
18-187 | Foot | 4 |
18-041 | Crossbar 72″ | 1 |
16-0001 | Crossbar 72″ w/ Ranger Logo | 1 |
18-198 | End Plastic Plug | 4 |
18-191 | Stud Plate | 4 |
94-1806 | Fastener kit | 1 |
1.2 PREPARATION
1.2.1 Remove one crossbar from the box and put the crossbar on the table.
NOTE:
open the next box and follow the install guide inside the box on how to
assemble your rack.
INSTALLATION GUIDE
FOOT PLACEMENT GUIDE
VEHICLE | DIMENSION ( A ) |
---|---|
Nissan nV | 7″ |
Sprinter | 10″ hr, 6 – 1/2″ if |
transit | 8 – 7/8″ |
Promaster | 7 – 1/16″ |
16-UCS72 Crossbar
1 Bar ( 72″ )
PHASE 1 – ASSEMBLY
1.1 SETUP
1.1.1 Verify all parts are present.
BILL OF MATERIALS
Item No. | Description | Qty. |
---|---|---|
18-187 | Foot | 2 |
18-041 | Crossbar 72″ | 1 |
18-198 | End Plastic Plug | 2 |
18-191 | Stud Plate | 2 |
96-1805 | Fastener kit | 1 |
PHASE 1 – ASSEMBLY
1.2 PREPARATION
1.2.1 Remove the crossbar from the box and put the crossbar on the table.
NOTE:
open the next box and follow the install guide inside the box on how to
assemble your rack.
INSTALLATION GUIDE
18-U0022 MOUNTING TRACKS
Ram ProMaster ( 136″ Wheelbase, Standard & High Roof )
REQUIRED ITEMS
- Cordless Impact
- Tape Measure
- Ladder
- 1/2″ Socket
PHASE 1 – ASSEMBLY
1.1 SETUP
1.1.1 Verify all parts are present.
Verify all Parts are Present
Item No. | Description | Qty. |
---|---|---|
10-711 | Mounting Track 106″ Long | 2 |
10-342 | Roof Clamp | 6 |
10-343 | Top Roof Clamp | 6 |
70-015 | Foam Sheet | 6 |
96-0022 | Fastener Kit | 1 |
1.1.3 Identify the Assembly and Installation fastener bags.
PHASE 2 – INSTALLATION
2.1 MOUNTING TRACKS INSTALLATION
2.1.1 Attach the foam sheet under the mounting track.
2.1.2 Slide the stud plate on both ends of the mounting track.
2.1.3 Install the mounting tracks onto the roof of the van.
NOTE: Notice the orientations of the roof clamps, top roof clamps, and
mounting tracks.
The top roof clamp should lay flat on the roof clamp and not slant.
“Congratulations, you have successfully installed your
Mounting Tracks
Thank you for doing business with us.”
For any feedback or suggestions, you might have, please contact: cs@rangerdesign.com
“Congratulations, you have successfully installed your
Cargo Rack on your vehicle!
Thank you for doing business with us.”
For any feedback or suggestions, you might have, please
contact:cs@rangerdesign.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>