NSL Bollard Lights Installation Guide
- June 1, 2024
- nsl
Table of Contents
NSL Bollard Lights
Specifications
- Installation: Cement Foundation
- Power Supply : Connect to power supply
- Wiring: Black (+) LINE, White (-) COMMON, GROUND, Purple (V+) DIM, Pink(Gray) (V-) DIM
- Adjustable Settings: Wattage & CCT
Product Usage Instructions
Installation
- Drill holes in the cement foundation.
- Place the expansion screw in the drilled holes.
- Lock the bottom of the lamp onto the expansion screw.
- Connect the wires and put the wiring caps on the board.
- Lock the aluminium body onto the base using the three set screws.
- Check the lamp is firm after installation, and connect the power supply to light it.
Wiring Instructions
- Ensure the input voltage is correct before wiring.
- Connect the black fixture lead to the (+) LINE supply lead.
- Connect the white fixture lead to the (-) COMMON supply lead.
- Connect the GROUND wire from the fixture to the supply ground.
- For 0-10V DIMMABLE WIRING: Connect purple fixture lead to (V+) DIM lead and Pink(Gray) fixture lead to (V-) DIM lead. Cap Vaux 12V fixture lead if present.
Cleaning & Maintenance
CAUTION: Ensure fixture temperature is cool enough to touch before cleaning.
- Clean the lens & fixture with a non-abrasive glass cleaning solution.
- Avoid opening the fixture to clean the LED and do not touch the LED directly.
Adjustable Switch Setting
(Only for Models with Power and CCT adjustable functions)
IMPORTANT
Installation Instructions
READ CAREFULLY BEFORE INSTALLING THE FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
Fixtures must be wired in accordance with the National Electrical Code and all
applicable local codes. Proper grounding is required for safety. This product
must be installed in accordance with the applicable installation code by a
person familiar with the construction and operation of the product and the
hazards involved.
WARNING: Make certain power is OFF before installing or maintaining
fixture. No user-serviceable parts inside.
- Drill holes in the cement foundation.
- Place the expansion screw in the drilled holes.
- Lock the bottom of the lamp ontothe expansion screw.
- Connect the wires and put the wiring gaps on the board.
- Lock the aluminium body onto the base using the three set screws; Check the lamp is firm after installation, and connect the power supply to light it.
- Dimension of the installation base.For reference:
WIRING
WARNING: Before wiring, make certain the input voltage is correct!
-
Connect the black fixture lead to the (+) LINE supply lead.
-
Connect the white fixture lead to the (-) COMMON supply lead.
-
Connect the GROUND wire from fixture to supply ground
0-10V DIMMABLE WIRING -
Connect the purple fixture lead to the (V+) DIM lead.
-
Connect the Pink(Gray) fixture lead to the (V-) DIM lead.
-
Cap the Vaux 12V fixture lead, if present. Do NOT connect.
TROUBLESHOOTING
- Check that the line voltage at fixture is correct. Refer to wiring directions.
- Is the fixture grounded properly?
CLEANING & MAINTENANCE
CAUTION: Be sure the fixture temperature is cool enough to touch. Do not clean or maintain while fixture is energized.
- Clean lens & fixture with a non-abrasive glass cleaning solution.
- Do not open the fixture to clean the LED. Do not touch the LED.
WATTAGE & CCT ADJUSTABLE SWITCH SETTING
(Only for the Models with Power and CCT adjustable functions)
NOTE
These instructions do not cover all details or variations in equipment nor do
they provide for every possible situation during installation operation or
maintenance.
contact
- 2299 Kenmore Avenue, Tonawanda, New York 14207
- 303.926.1100
- nslsales@nslusa.com
- www.nslusa.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>