LEDALITE ID-M1-P0 Cable Mount Instruction Manual

May 15, 2024
LEDALITE

ID-M1-P0 Cable Mount

“`html

Product Information

Specifications:

  • Model: ID-M1
  • Support Connection: Ceiling Mount
  • Tools Required: Phillips screwdriver, flat-head screwdriver,
    cable/wire cutter, pliers

Product Usage Instructions

1. Install Ceiling Mounting Components

Follow national and local electrical codes and building
codes.

2. Install Crossbar Strap for Non-Power (M1-P0)

Secure crossbar strap with stud to the structure using
appropriate fasteners that can support a load of 750lbs each.

3. Install Canopy to Crossbar Strap

Align the mounting hole in the canopy with the crossbar strap
and secure using a #6 x 3/8 in. screw.

4. Install Collar(s) and Gripper

Attach collar(s) and gripper onto the threaded stud.

5. Install Aircraft Cable into Gripper

Insert the crimp end of the aircraft cable into the luminaire
and feed the free end into the gripper. Lower the luminaire until
supported by the cable, then cut excess cable after determining the
desired height.

Frequently Asked Questions (FAQ)

Q: What tools are required for installation?

A: You will need a Phillips screwdriver, flat-head screwdriver,
cable/wire cutter, and pliers.

Q: How much weight can the fasteners support?

A: The fasteners should be able to support a load of 750lbs
each.

“`

ID-M1 Cable Mount
Installation Instruction
Support Connection at Ceiling

IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.

M1 – 0°-15° Slope Mount ­ Non-accessible ceiling What is Included in this package:
M1-P0 – M1 Cable Mounting Installation without Power M1-P1 – M1 Cable Mounting Installation with Power

M1 ­P0
· CROSSBAR STRAP W/ STUD (x1) · FORMED CANOPY CP0 (x1) · ¼-20 THREADED COLLAR (x2) · SCREW 6-B X 32 (X1) · A/C WIRE GRIPPER (x1)

M1 ­P1
· CROSSBAR STRAP W/ STUD (x1) · FORMED CANOPY CP1 (x1) · ¼-20 THREADED COLLAR (x2) · SCREW 6-B X 32 (X1) · A/C WIRE GRIPPER (x1) · HEYCO BUSHING SNAP (x2) · HEYCO BUSHING STRAIN (x2)

PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, flat-head screwdriver, cable/wire cutter, pliers
11/30/2023 page 1 www.ledalite.com Rev D

ID-M1

M1 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1 Install ceiling mounting components
ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.)
2 Install crossbar strap with stud to structure for non-power (M1-P0).

Crossbar strap

Installed

Select appropriate fasteners, which will support a load of 750lbs. each to attach crossbar strap with stud to structure.

Secure crossbar strap with stud to location specified on application drawings.

3 Install canopy to crossbar strap

4 Install collar(s) and gripper

Installed

Collar(s)

Installed

Screw

Gripper

Install canopy to crossbar strap. Guide stud through hole in canopy, align the mounting hole in canopy with crossbar strap. Use a #6 x 3/8 in. screw (provided) to secure canopy to mounting plate.

Install provided collar(s) and gripper onto threaded stud.

11/30/2023 page 2 www.ledalite.com Rev D

ID-M1

M1 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

5 Install aircraft cable into gripper

Installed

Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.

After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.

11/30/2023 page 3 www.ledalite.com Rev D

ID-M1

M1 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1 Install ceiling mounting components

ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.) ATTENTION: Signify Ledalite recommends that crossbar straps with studs be mounted to supporting structure to ensure compliance with local electrical code.

2 Install power cord in octagonal box or equivalent.

3 Install crossbar strap with stud to structure for non-power (M1-P1).

GND

4″

100mm

Install an Iberville #54151-K octagonal box or equivalent. Slip strain relief bushing over one end of power cord, approximately one inch and crimp. Make power and ground connection in octagonal box.

Select appropriate fasteners, which will support a load of 750lbs. each to attach crossbar strap with stud to structure. Feed power cord through hole in crossbar strap. Secure crossbar strap to location specified on application drawings.

4 Install canopy to crossbar strap

5 Install collar(s) and gripper

Screw Snap bushing

Installed

Collar(s)
Griper

Installed

Snap bushing (provided) into canopy power supply hole and feed power cord through. Guide stud through hole in canopy, align the mounting hole in canopy with crossbar strap. Use a #6 x 3/8 in. screw (provided) to secure canopy to mounting plate.
11/30/2023 page 4 www.ledalite.com Rev D

Install provided collar(s) and gripper onto threaded stud.

ID-M1

M1 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

6 Install A/C cable into gripper

Installed

Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.

After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.

!

ATTENTION: Install in accordance with local and national building and electric codes.

11/30/2023 page 5 www.ledalite.com Rev D

www.signify.com

ID-M2 Cable Mount
Installation Instruction
Support Connection at Ceiling

IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.

M2 ­ Fixed Position Mount ­ T-grid ceiling What is Included in this package:
M2-P0 ­ M2 Cable Mounting Installation without Power M2-P1 ­ M2 Cable Mounting Installation with Power
M2 ­ P0
· Tie Off Plate (x1) · ¼-20 HEX MACHINE NUT STL (x3) · ¼-20 HEX LOCK (DIMPLE) STL (x1) · SCREW 6-B X 32 (X1) · A/C WIRE GRIPPER (x1)

M2 ­ P1
· Tie Off Plate (x1) · ¼-20 HEX MACHINE NUT STL (x3) · ¼-20 HEX LOCK (DIMPLE) STL (x1) · SCREW 6-B X 32 (x1) · A/C WIRE GRIPPER (x1 HEYCO BUSHING SNAP (x2) · HEYCO BUSHING STRAIN (x2) · M2 MOUNTING STRAP (x1) · M2 MOUNTING STRAP COVER (x1)

PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, Flat-head screwdriver, #2 Robertson screwdriver (optional), Hole saw, A/C wire cutters, Pliers
11/30/2023 page 6 www.ledalite.com Rev D

ID-M2

M2 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1 Install ceiling mounting components non-power
ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.)
2 Install ¼”-20 threaded rod to structure for non-power (M2-P0).
Secure ¼”-20 threaded rod (supplied by others) to the substructure, directly above specified mount Location. (see layout drawings) Note: Recommend using a minimum A36 steel ¼”-20 threaded rod. Important: The free end of the threaded rod must be located at approximately 1/2″ below ceiling level. Drill a 3/4″. diameter hole in ceiling tile at the specified mount location

ATTENTION: The ¼”-20 ready rod which is attached to the substructure must safely support an axial load of 1500lbs.

3 Thread Locknut onto threaded rod

4 Install canopy and gripper

Dimple lock nut

Canopy

2/5 in. Star washer Gripper

Tighten gripper (provided) against locknut, washer and canopy.

Installed

IMPORTANT: ENSURE THAT THE ¼”-20 GRIPPER IS TIGHTENED SECURELY AGAINST THE MOUNTING
STRAP AND CANOPY.

Thread locknut onto threaded rod until bottom of nut is 9/16 ” above free end of rod.
11/30/2023 page 7 www.ledalite.com Rev D

ID-M2

M2 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

5 Install A/C cable into gripper

Installed

Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.

After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.

11/30/2023 page 8 www.ledalite.com Rev D

ID-M2

M2 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1 Install ceiling mounting components power

ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.)

2 Install ¼”-20 threaded rod to structure for power (M2-P1).

+ 1/8 in. 2-1/2 in.- 1/4 in.

Secure ¼”-20 threaded rod (supplied by others) to the substructure, directly above specified mount location. (see layout drawings) Note: Recommend using a minimum A36 steel ¼”-20 threaded rod.
Important: The free end of the threaded rod must be located approximately 1/2″ below ceiling level. Drill a 2-1/2″ diameter hole in ceiling tile at the specified mount location.

ATTENTION: The ¼”-20 ready rod which is attached to the substructure must safely support an axial load of 1500lbs.

3 Thread locknut and mounting strap

4 Install canopy and install gripper

6.00 in.

Mounting strap

Tighten gripper (provided) against mounting strap and canopy.

Installed

Thread one of the ¼”-20 nuts (provided) onto the threaded rod to at least 6″ above the free end of the rod. Spin mounting strap onto threaded rod until
tabs contact ceiling tile.

Slide canopy onto ¼”-20 threaded rod, and begin tightening the gripper against the mounting strap and canopy.
IMPORTANT: ENSURE THAT THE ¼”-20 GRIPPER IS TIGHTENED SECURELY AGAINST THE MOUNTING
STRAP AND CANOPY.

11/30/2023 page 9 www.ledalite.com Rev D

ID-M2

M2 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

5 Install A/C cable into gripper

6 Make power connections

¼” ­ 20 Nut

Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.
After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.
7 Attach J-box cover

Ground screw

Strain relief

Access the mount from above, through an adjacent tile, and screw mount further on to threaded rod so the canopy is again in contact with ceiling tile after any settling. Lock mount in place by tightening the ¼”-20 nut down onto the top of the mounting strap.

Installed

Connect power cable to ground screw provided. Pass power cord (provided) through canopy power hole and bushing, crimp metal strain relief onto cord above canopy. Make appropriate power connections.

!

ATTENTION: Install in accordance with local and national building and electric codes.

11/30/2023 page 10 www.ledalite.com Rev D

www.signify.com

ID-M3 Cable Mount
Installation Instruction
Support Connection at Ceiling

IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.

M3 – 0°-90° Slope Mount ­ Non-accessible ceiling What is Included in this package:
M3-P0 ­ M3 Cable Mounting Installation without Power M3-P1 ­ M3 Cable Mounting Installation with Power

M3 ­ P0
· MOUNT BRACKET (x1) · BOLT BRACKET MOUNT (x1) · LOCK NUT (x1) · HEX HEAD SCREW (x1) · A/C WIRE GRIPPER (x1) · COLLAR (x2)

M3 ­ P1
· A/C CROSS BAR STRAP(x1) · CANOPY EXTENSION RING (x1) · FORMED CANOPY P1 (x1) · MOUNT BRACKET (x1) · BOLT BRACKET MOUNT (x1) · LOCK NUT (x1) · HEX HEAD SCREW (x1) · A/C WIRE GRIPPER (x1) · COLLAR (x2) · HEYCO BUSHING SNAP (x2) · HEYCO BUSHING STRAIN (X2)

PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, Flat-head screwdriver, #2 Robertson screwdriver (optional), A/C wire cutters, Pliers
11/30/2023 page 11 www.ledalite.com Rev D

ID-M3

M3 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1 Install ceiling mounting components non-power
ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.)

2 Install Bolt Bracket Mount (M3-P0).

Select an appropriate fastener which will support a load of 1500lbs. and accommodate a 3/8″ diameter hole to attach the bracket to the structure.

Secure bolt bracket to structure at location specified on application drawings.

Mount bracket
3 Connect Bracket Mount to Bolt Bracket

ATTENTION: The fastener which is attached to the structure must safely support a load of 1500lbs.
Connect mount bracket to bolt bracket using #1032 x 1-½” bolt and nut supplied with mount.

Bolt Bracket
4 Install collar(s) and gripper

5 Adjustability
180°

Collar
Gripper
Thread collars and gripper onto bolt bracket.

360° Adjustable
Adjustable to find ideal position.

11/30/2023 page 12 www.ledalite.com Rev D

ID-M3

M3 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

6 Install A/C cable into gripper

7 Install collar(s) and gripper

A/C cable

Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.

After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.

11/30/2023 page 13 www.ledalite.com Rev D

ID-M3

M3 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1 Install ceiling mounting components power
ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.)
2 Install octagonal box for power (M3-P1). 3 Install crossbar strap & power cord

Install an Iberville #54151-K octagonal box or equivalent 1″ to 6″ from the mounting location.
4 Install extension collar and canopy
Cross bar strap
Extension collar

Cross bar strap

Strain relief

Power cord
Slip strain relief bushing over power cord approximately 1″ from end of jacket and crimp it. Complete power and ground connections in octagonal box. Feed power cord through hole in cross bar strap and Secure cross bar strap to octagonal box.
5 Install extension collar and canopy

Canopy

Screw

Bushing

Snap bushing into canopy power hole in canopy. Feed power cord through canopy extension collar then through power hole in canopy.

Bring the canopy up to ceiling level, align mounting hole in canopy with that of crossbar strap and use the supplied #6 x 3/8″ screw to secure canopy to crossbar strap.

11/30/2023 page 14 www.ledalite.com Rev D

ID-M3

M3 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

6 Install M3 mount to specified location 7 Install collar(s) and gripper

A/C cable

Refer to steps 1 through 5 on M3-P. Secure bolt bracket to structure at location specified on application drawings. Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.
8 Installed

After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.

Complete power connections at luminaire. Refer to luminaire installation instructions.

!

ATTENTION: Install in accordance with local and national building and electric codes.

11/30/2023 page 15 www.ledalite.com Rev D

www.signify.com

ID-M5 Cable Mount
Installation Instruction
Support Connection at Ceiling

IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.

M5 ­ 24″ T-grid Span Mount ­ T-grid ceiling What is Included in this package:
M5-P0 ­ M5 Cable Mounting Installation without Power M5-P1 ­ M5 Cable Mounting Installation with Power

M5 ­ P0
· M5 SUPPORT PLATE (x1) · M5 LOCATION CHANNEL (x1) · M5 MOUNTING STRAP S/A (x1) · A/C WIRE GRIPPER (x1) · COLLAR (x1) · COLLAR (x1) · HEX NUT (x1) · SCREW (x2) · MOLDED CANOPY (x1)

M5 ­ P1
· M5 SUPPORT PLATE (x1) · M5 LOCATION CHANNEL (x1) · M5 MOUNTING STRAP S/A (x1) · A/C WIRE GRIPPER (x1) · COLLAR (x1) · COLLAR (x1) · HEX NUT (x1) · SCREW (x2) · MOLDED CANOPY (x1) · HEYCO BUSHING SNAP (x2) · HEYCO BUSHING STRAIN (X2)

PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, Flat-head screwdriver, #2 Robertson screwdriver (optional), A/C wire cutters, Pliers
11/30/2023 page 16 www.ledalite.com Rev D

ID-M5

M5 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1, 2 Install ceiling mounting components non-power
ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.)

3, 4 Prepare mounting strap
Mounting strap

1. Attach four 12 gauge steel guy wires (by others) to substructure above. Guy wires should be angled at approximately 45° or less off the horizontal. Do not tie off loose ends until step 2.

Location Channel

For 1″ T-bar only

Support plate assembly
5, 6 Install mounting strap
T-bar (1-1/2″ shown)

2. Drill a 2-1/4 inch diameter hole in ceiling tile at desired mount location using a hole saw. Ensure center of hole is minimum 2 inches away from edge of T-bar. Note: This mounting system is designed to work with 1 inch and/or 1-1/2 inch T-bar systems. Determine specific application and follow appropriate instructions in step 3.
3. For 1 inch T-bar slide location channel through mounting strap., and fold tabs of location channel as shown. 3. For 1-1/2 inch T-bar slide location channel through mounting strap, and use location channel as shipped.

Safety screw (1-1/2″ shown)

4. Snap support plate assembly past mounting strap tabs to bottom of location channel.
5. Through an adjacent tile, place mounting assembly over 2-1/4 inch diameter hole and adjust mounting strap to desired position. Once strap is aligned with mounting location, snap assembly to T-bar.

7, 8 Install safety screws & guy wires

6. To secure location channel, screw a self-tapping metal screw (supplied by others) into T-bar at each end.

Guy wire (buy others)

Safety screw

Safety screw

Important: Location channel is designed to locate mounting point, NOT to support fixture.
7. From below installed mount, tighten the two #8 sheet metal screws, to bind location channel, mounting strap And support plate together.

1″ T-bar

8 screw

1-1/2″ T-bar

8. IMPORTANT: Attach guy wires installed in the first step to support plate by threading free ends through corner holes and tightly wrapping wires around themselves a minimum of four turns.

11/30/2023 page 17 www.ledalite.com Rev D

ID-M5

M5 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

9 Attach canopy, collar, and gripper
Mounting strap

9. Secure canopy to mounting strap by threading the collar onto the mounting strap ¼-20″ stud.
Important: Fully tighten the ¼-20″ gripper against mounting strap hex nut.

Canopy

Collar Gripper

Installed

10. Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.
After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.
If applicable, make appropriate power connections at fixture level.

10 Install A/C into gripper

Installed

11/30/2023 page 18 www.ledalite.com Rev D

ID-M5

M5 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1-8 Install ceiling mounting components non-power

Refer to steps 1 ­ 8 prior to starting power versions of the mounting in step 11

11 -13

Install power and J-box
J-box (by others) T-bar
(1-1/2″ shown)

Power Cord S/M screw

Safety screw (1-1/2″ shown)

14 Install safety screws & guy wires

Electrical conduit

Guy wire (buy others)

11. Assemble j-box, strain relief connector, and power cord. 12. Feed power cord through mounting strap hole(s). 13. Fasten j-box assembly to mounting strap using a self tapping sheet screw. (supplied by others) 14. Connect electrical conduit to j-box and make required electrical connections. 15. Insert and feed power cord through canopy hole. 16. Secure canopy to mounting strap by threading the collar onto the mounting strap ¼-20″ stud. 17. Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper. After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level. If applicable, make appropriate power connections at fixture level.
15-17 Install safety screws & guy wires

Safety screw

Safety screw

1″ T-bar

8 screw

1-1/2″ T-bar

Canopy

Installed

Important: Fully tighten the ¼-20″ gripper against mounting strap hex nut.

Collar Gripper

A/C cable

!

ATTENTION: Install in accordance with local and national building and electric codes.

11/30/2023 page 19 www.ledalite.com Rev D

www.signify.com

ID-M6 Cable Mount
Installation Instruction
Support Connection at Ceiling

IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.

M6 ­ On-grid Mount ­ T-grid ceiling What is Included in this package:
M6-P0 ­ M6 Cable Mounting Installation without Power M6-P1 ­ M6 Cable Mounting Installation with Power
M6 ­ P0
· A/C WIRE GRIPPER (x1) · CADDY IDS CLIP (x1) · COLLAR (x1) · MOLDED CANOPY (x1)

M6 ­ P1
· A6 POWER ADAPTER BRACKET (x1) · A/C WIRE GRIPPER (x1) · CADDY IDS CLIP (x1) · COLLAR (x1) · HEX NUT, 10-24 (x2) · ELEC, FLEX CONDUIT ½: #XC-241 (x1) · SCREW, 10-24 X 9/16″ (x2) · MOLDED CANOPY (x1) · HEYCO BUSHING SNAP (x1) · HEYCO BUSHING STRAIN (X2)

PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, Flat-head screwdriver, #2 Robertson screwdriver (optional), A/C wire cutters, Pliers
11/30/2023 page 20 www.ledalite.com Rev D

ID-M6

M6 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

1 Install ceiling mounting components non-power
ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.)
This mounting system is available for 1″, 9/16″, or 9/16″ x 5/16″ screw ­slot t-bar grid systems.
Important: Mounting system will support a MAXIUMUM 65lbs LOAD.

Note: Power mount requires use of a 4″ square electrical junction box (contractor supplied).

NON-POWER MOUNT (Refer to Figure 1)

Hanger wire

T-bar

1. Remove ceiling tiles at mount location. 2. Disassemble t-bar clip and lock into place around t-bar.

T-bar clip

3. Secure t-bar clip to structure above using an approved hanger wire.

4. Slide the canopy overtop the t-bar clip bolt, then thread gripper

FIGURE 1

onto the bolt. Fully tighten the gripper.

5. Insert crimp end of A/C cable into luminaire. Feed

free end of A/C cable into gripper. 6. After cables have been secured, carefully lower

Canopy

luminaire until supported by cable. 7. Cut excess cable after the desired height is determined and

Collar

luminaire is level.

8. If applicable, make appropriate power connections at fixture level.

Gripper

9. Replace ceiling tiles.

POWER MOUNT (Refer to Figures 2 to 6) 1. Remove ceiling tiles at mount location.

Aircraft cable

2. Disassemble t-bar clip and lock into place around t-bar.

3. Secure junction box bracket to t-bar clip using flat-top screw and locknut.

4. Attach an approved hanger wire from structure above to junction box bracket.

5. Attach junction box to bracket using flat-top screw and locknut. Junction box should be oriented with three knockouts

facing down.

Continue on next page

Hanger wire Lock nut

Junction box bracket

FIGURE 3

FIGURE 2

Fla-top screw

11/30/2023 page 21 www.ledalite.com Rev D

ID-M6

M6 Cable Mount Instruction Sheet ­ Support Connection at Ceiling

POWER MOUNT (cont.) 6. Attach flex-conduit connector to center knockout in bottom of junction
box. 7. Slide canopy over the t-bar clip bolt, then thread the gripper onto the
bolt. Fully tighten the gripper. 8. Install power cord, make required electrical connections, and install
junction box cover. 9. Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper. 10. After cables have been secured, carefully lower luminaire until supported by cable. 11. Cut excess cable after the desired height is determined and luminaire is level. 12. If applicable, make appropriate power connections at fixture level. 13. Notch ceiling tile to clear the flex-conduit connector. 14. See Figure 6 for cutting dimensions. 15. Replace ceiling tiles.
FIGURE 4

FIGURE 5

Cut ceiling tile

3/4″

1-1/4″

FIGURE 6

!

ATTENTION: Install in accordance with local and national building and electric codes.

11/30/2023 page 22 www.ledalite.com Rev D

www.signify.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals