LEDALITE ID-M1-P0 Cable Mount Instruction Manual
- May 15, 2024
- LEDALITE
Table of Contents
- ID-M1-P0 Cable Mount
- Product Information
- Specifications:
- 1. Install Ceiling Mounting Components
- 2. Install Crossbar Strap for Non-Power (M1-P0)
- 3. Install Canopy to Crossbar Strap
- 4. Install Collar(s) and Gripper
- 5. Install Aircraft Cable into Gripper
- Q: What tools are required for installation?
- Q: How much weight can the fasteners support?
ID-M1-P0 Cable Mount
“`html
Product Information
Specifications:
- Model: ID-M1
- Support Connection: Ceiling Mount
- Tools Required: Phillips screwdriver, flat-head screwdriver,
cable/wire cutter, pliers
Product Usage Instructions
1. Install Ceiling Mounting Components
Follow national and local electrical codes and building
codes.
2. Install Crossbar Strap for Non-Power (M1-P0)
Secure crossbar strap with stud to the structure using
appropriate fasteners that can support a load of 750lbs each.
3. Install Canopy to Crossbar Strap
Align the mounting hole in the canopy with the crossbar strap
and secure using a #6 x 3/8 in. screw.
4. Install Collar(s) and Gripper
Attach collar(s) and gripper onto the threaded stud.
5. Install Aircraft Cable into Gripper
Insert the crimp end of the aircraft cable into the luminaire
and feed the free end into the gripper. Lower the luminaire until
supported by the cable, then cut excess cable after determining the
desired height.
Frequently Asked Questions (FAQ)
Q: What tools are required for installation?
A: You will need a Phillips screwdriver, flat-head screwdriver,
cable/wire cutter, and pliers.
Q: How much weight can the fasteners support?
A: The fasteners should be able to support a load of 750lbs
each.
“`
ID-M1 Cable Mount
Installation Instruction
Support Connection at Ceiling
IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.
M1 – 0°-15° Slope Mount Non-accessible ceiling What is Included in this
package:
M1-P0 – M1 Cable Mounting Installation without Power M1-P1 – M1 Cable Mounting
Installation with Power
M1 P0
· CROSSBAR STRAP W/ STUD (x1) · FORMED CANOPY CP0 (x1) · ¼-20 THREADED COLLAR
(x2) · SCREW 6-B X 32 (X1) · A/C WIRE GRIPPER (x1)
M1 P1
· CROSSBAR STRAP W/ STUD (x1) · FORMED CANOPY CP1 (x1) · ¼-20 THREADED COLLAR
(x2) · SCREW 6-B X 32 (X1) · A/C WIRE GRIPPER (x1) · HEYCO BUSHING SNAP (x2) ·
HEYCO BUSHING STRAIN (x2)
PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, flat-head screwdriver, cable/wire
cutter, pliers
11/30/2023 page 1 www.ledalite.com Rev D
ID-M1
M1 Cable Mount Instruction Sheet Support Connection at Ceiling
1 Install ceiling mounting components
ATTENTION: Install in accordance to national and local electrical codes and
building codes. ATTENTION: Refer to associated installation instruction to
complete installation (e.g, leveling, joining, powered and non powered
mounts.)
2 Install crossbar strap with stud to structure for non-power (M1-P0).
Crossbar strap
Installed
Select appropriate fasteners, which will support a load of 750lbs. each to attach crossbar strap with stud to structure.
Secure crossbar strap with stud to location specified on application drawings.
3 Install canopy to crossbar strap
4 Install collar(s) and gripper
Installed
Collar(s)
Installed
Screw
Gripper
Install canopy to crossbar strap. Guide stud through hole in canopy, align the mounting hole in canopy with crossbar strap. Use a #6 x 3/8 in. screw (provided) to secure canopy to mounting plate.
Install provided collar(s) and gripper onto threaded stud.
11/30/2023 page 2 www.ledalite.com Rev D
ID-M1
M1 Cable Mount Instruction Sheet Support Connection at Ceiling
5 Install aircraft cable into gripper
Installed
Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.
After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.
11/30/2023 page 3 www.ledalite.com Rev D
ID-M1
M1 Cable Mount Instruction Sheet Support Connection at Ceiling
1 Install ceiling mounting components
ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.) ATTENTION: Signify Ledalite recommends that crossbar straps with studs be mounted to supporting structure to ensure compliance with local electrical code.
2 Install power cord in octagonal box or equivalent.
3 Install crossbar strap with stud to structure for non-power (M1-P1).
GND
4″
100mm
Install an Iberville #54151-K octagonal box or equivalent. Slip strain relief bushing over one end of power cord, approximately one inch and crimp. Make power and ground connection in octagonal box.
Select appropriate fasteners, which will support a load of 750lbs. each to attach crossbar strap with stud to structure. Feed power cord through hole in crossbar strap. Secure crossbar strap to location specified on application drawings.
4 Install canopy to crossbar strap
5 Install collar(s) and gripper
Screw Snap bushing
Installed
Collar(s)
Griper
Installed
Snap bushing (provided) into canopy power supply hole and feed power cord
through. Guide stud through hole in canopy, align the mounting hole in canopy
with crossbar strap. Use a #6 x 3/8 in. screw (provided) to secure canopy to
mounting plate.
11/30/2023 page 4 www.ledalite.com Rev D
Install provided collar(s) and gripper onto threaded stud.
ID-M1
M1 Cable Mount Instruction Sheet Support Connection at Ceiling
6 Install A/C cable into gripper
Installed
Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.
After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.
!
ATTENTION: Install in accordance with local and national building and electric codes.
11/30/2023 page 5 www.ledalite.com Rev D
www.signify.com
ID-M2 Cable Mount
Installation Instruction
Support Connection at Ceiling
IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.
M2 Fixed Position Mount T-grid ceiling What is Included in this package:
M2-P0 M2 Cable Mounting Installation without Power M2-P1 M2 Cable Mounting
Installation with Power
M2 P0
· Tie Off Plate (x1) · ¼-20 HEX MACHINE NUT STL (x3) · ¼-20 HEX LOCK (DIMPLE)
STL (x1) · SCREW 6-B X 32 (X1) · A/C WIRE GRIPPER (x1)
M2 P1
· Tie Off Plate (x1) · ¼-20 HEX MACHINE NUT STL (x3) · ¼-20 HEX LOCK (DIMPLE)
STL (x1) · SCREW 6-B X 32 (x1) · A/C WIRE GRIPPER (x1 HEYCO BUSHING SNAP (x2)
· HEYCO BUSHING STRAIN (x2) · M2 MOUNTING STRAP (x1) · M2 MOUNTING STRAP COVER
(x1)
PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, Flat-head screwdriver, #2 Robertson
screwdriver (optional), Hole saw, A/C wire cutters, Pliers
11/30/2023 page 6 www.ledalite.com Rev D
ID-M2
M2 Cable Mount Instruction Sheet Support Connection at Ceiling
1 Install ceiling mounting components non-power
ATTENTION: Install in accordance to national and local electrical codes and
building codes. ATTENTION: Refer to associated installation instruction to
complete installation (e.g, leveling, joining, powered and non powered
mounts.)
2 Install ¼”-20 threaded rod to structure for non-power (M2-P0).
Secure ¼”-20 threaded rod (supplied by others) to the substructure, directly
above specified mount Location. (see layout drawings) Note: Recommend using a
minimum A36 steel ¼”-20 threaded rod. Important: The free end of the threaded
rod must be located at approximately 1/2″ below ceiling level. Drill a 3/4″.
diameter hole in ceiling tile at the specified mount location
ATTENTION: The ¼”-20 ready rod which is attached to the substructure must safely support an axial load of 1500lbs.
3 Thread Locknut onto threaded rod
4 Install canopy and gripper
Dimple lock nut
Canopy
2/5 in. Star washer Gripper
Tighten gripper (provided) against locknut, washer and canopy.
Installed
IMPORTANT: ENSURE THAT THE ¼”-20 GRIPPER IS TIGHTENED SECURELY AGAINST THE
MOUNTING
STRAP AND CANOPY.
Thread locknut onto threaded rod until bottom of nut is 9/16 ” above free end
of rod.
11/30/2023 page 7 www.ledalite.com Rev D
ID-M2
M2 Cable Mount Instruction Sheet Support Connection at Ceiling
5 Install A/C cable into gripper
Installed
Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.
After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.
11/30/2023 page 8 www.ledalite.com Rev D
ID-M2
M2 Cable Mount Instruction Sheet Support Connection at Ceiling
1 Install ceiling mounting components power
ATTENTION: Install in accordance to national and local electrical codes and building codes. ATTENTION: Refer to associated installation instruction to complete installation (e.g, leveling, joining, powered and non powered mounts.)
2 Install ¼”-20 threaded rod to structure for power (M2-P1).
+ 1/8 in. 2-1/2 in.- 1/4 in.
Secure ¼”-20 threaded rod (supplied by others) to the substructure, directly
above specified mount location. (see layout drawings) Note: Recommend using a
minimum A36 steel ¼”-20 threaded rod.
Important: The free end of the threaded rod must be located approximately 1/2″
below ceiling level. Drill a 2-1/2″ diameter hole in ceiling tile at the
specified mount location.
ATTENTION: The ¼”-20 ready rod which is attached to the substructure must safely support an axial load of 1500lbs.
3 Thread locknut and mounting strap
4 Install canopy and install gripper
6.00 in.
Mounting strap
Tighten gripper (provided) against mounting strap and canopy.
Installed
Thread one of the ¼”-20 nuts (provided) onto the threaded rod to at least 6″
above the free end of the rod. Spin mounting strap onto threaded rod until
tabs contact ceiling tile.
Slide canopy onto ¼”-20 threaded rod, and begin tightening the gripper against
the mounting strap and canopy.
IMPORTANT: ENSURE THAT THE ¼”-20 GRIPPER IS TIGHTENED SECURELY AGAINST THE
MOUNTING
STRAP AND CANOPY.
11/30/2023 page 9 www.ledalite.com Rev D
ID-M2
M2 Cable Mount Instruction Sheet Support Connection at Ceiling
5 Install A/C cable into gripper
6 Make power connections
¼” 20 Nut
Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into
gripper.
After cables have been secured, carefully lower luminaire until supported by
cable. Cut excess cable after the desired height is determined and luminaire
is level.
7 Attach J-box cover
Ground screw
Strain relief
Access the mount from above, through an adjacent tile, and screw mount further on to threaded rod so the canopy is again in contact with ceiling tile after any settling. Lock mount in place by tightening the ¼”-20 nut down onto the top of the mounting strap.
Installed
Connect power cable to ground screw provided. Pass power cord (provided) through canopy power hole and bushing, crimp metal strain relief onto cord above canopy. Make appropriate power connections.
!
ATTENTION: Install in accordance with local and national building and electric codes.
11/30/2023 page 10 www.ledalite.com Rev D
www.signify.com
ID-M3 Cable Mount
Installation Instruction
Support Connection at Ceiling
IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.
M3 – 0°-90° Slope Mount Non-accessible ceiling What is Included in this
package:
M3-P0 M3 Cable Mounting Installation without Power M3-P1 M3 Cable Mounting
Installation with Power
M3 P0
· MOUNT BRACKET (x1) · BOLT BRACKET MOUNT (x1) · LOCK NUT (x1) · HEX HEAD
SCREW (x1) · A/C WIRE GRIPPER (x1) · COLLAR (x2)
M3 P1
· A/C CROSS BAR STRAP(x1) · CANOPY EXTENSION RING (x1) · FORMED CANOPY P1 (x1)
· MOUNT BRACKET (x1) · BOLT BRACKET MOUNT (x1) · LOCK NUT (x1) · HEX HEAD
SCREW (x1) · A/C WIRE GRIPPER (x1) · COLLAR (x2) · HEYCO BUSHING SNAP (x2) ·
HEYCO BUSHING STRAIN (X2)
PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, Flat-head screwdriver, #2 Robertson
screwdriver (optional), A/C wire cutters, Pliers
11/30/2023 page 11 www.ledalite.com Rev D
ID-M3
M3 Cable Mount Instruction Sheet Support Connection at Ceiling
1 Install ceiling mounting components non-power
ATTENTION: Install in accordance to national and local electrical codes and
building codes. ATTENTION: Refer to associated installation instruction to
complete installation (e.g, leveling, joining, powered and non powered
mounts.)
2 Install Bolt Bracket Mount (M3-P0).
Select an appropriate fastener which will support a load of 1500lbs. and accommodate a 3/8″ diameter hole to attach the bracket to the structure.
Secure bolt bracket to structure at location specified on application drawings.
Mount bracket
3 Connect Bracket Mount to Bolt Bracket
ATTENTION: The fastener which is attached to the structure must safely support
a load of 1500lbs.
Connect mount bracket to bolt bracket using #1032 x 1-½” bolt and nut supplied
with mount.
Bolt Bracket
4 Install collar(s) and gripper
5 Adjustability
180°
Collar
Gripper
Thread collars and gripper onto bolt bracket.
360° Adjustable
Adjustable to find ideal position.
11/30/2023 page 12 www.ledalite.com Rev D
ID-M3
M3 Cable Mount Instruction Sheet Support Connection at Ceiling
6 Install A/C cable into gripper
7 Install collar(s) and gripper
A/C cable
Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable into gripper.
After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.
11/30/2023 page 13 www.ledalite.com Rev D
ID-M3
M3 Cable Mount Instruction Sheet Support Connection at Ceiling
1 Install ceiling mounting components power
ATTENTION: Install in accordance to national and local electrical codes and
building codes. ATTENTION: Refer to associated installation instruction to
complete installation (e.g, leveling, joining, powered and non powered
mounts.)
2 Install octagonal box for power (M3-P1). 3 Install crossbar strap & power
cord
Install an Iberville #54151-K octagonal box or equivalent 1″ to 6″ from the
mounting location.
4 Install extension collar and canopy
Cross bar strap
Extension collar
Cross bar strap
Strain relief
Power cord
Slip strain relief bushing over power cord approximately 1″ from end of jacket
and crimp it. Complete power and ground connections in octagonal box. Feed
power cord through hole in cross bar strap and Secure cross bar strap to
octagonal box.
5 Install extension collar and canopy
Canopy
Screw
Bushing
Snap bushing into canopy power hole in canopy. Feed power cord through canopy extension collar then through power hole in canopy.
Bring the canopy up to ceiling level, align mounting hole in canopy with that of crossbar strap and use the supplied #6 x 3/8″ screw to secure canopy to crossbar strap.
11/30/2023 page 14 www.ledalite.com Rev D
ID-M3
M3 Cable Mount Instruction Sheet Support Connection at Ceiling
6 Install M3 mount to specified location 7 Install collar(s) and gripper
A/C cable
Refer to steps 1 through 5 on M3-P. Secure bolt bracket to structure at
location specified on application drawings. Insert crimp end of A/C cable into
luminaire. Feed free end of A/C cable into gripper.
8 Installed
After cables have been secured, carefully lower luminaire until supported by cable. Cut excess cable after the desired height is determined and luminaire is level.
Complete power connections at luminaire. Refer to luminaire installation instructions.
!
ATTENTION: Install in accordance with local and national building and electric codes.
11/30/2023 page 15 www.ledalite.com Rev D
www.signify.com
ID-M5 Cable Mount
Installation Instruction
Support Connection at Ceiling
IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.
M5 24″ T-grid Span Mount T-grid ceiling What is Included in this package:
M5-P0 M5 Cable Mounting Installation without Power M5-P1 M5 Cable Mounting
Installation with Power
M5 P0
· M5 SUPPORT PLATE (x1) · M5 LOCATION CHANNEL (x1) · M5 MOUNTING STRAP S/A
(x1) · A/C WIRE GRIPPER (x1) · COLLAR (x1) · COLLAR (x1) · HEX NUT (x1) ·
SCREW (x2) · MOLDED CANOPY (x1)
M5 P1
· M5 SUPPORT PLATE (x1) · M5 LOCATION CHANNEL (x1) · M5 MOUNTING STRAP S/A
(x1) · A/C WIRE GRIPPER (x1) · COLLAR (x1) · COLLAR (x1) · HEX NUT (x1) ·
SCREW (x2) · MOLDED CANOPY (x1) · HEYCO BUSHING SNAP (x2) · HEYCO BUSHING
STRAIN (X2)
PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, Flat-head screwdriver, #2 Robertson
screwdriver (optional), A/C wire cutters, Pliers
11/30/2023 page 16 www.ledalite.com Rev D
ID-M5
M5 Cable Mount Instruction Sheet Support Connection at Ceiling
1, 2 Install ceiling mounting components non-power
ATTENTION: Install in accordance to national and local electrical codes and
building codes. ATTENTION: Refer to associated installation instruction to
complete installation (e.g, leveling, joining, powered and non powered
mounts.)
3, 4 Prepare mounting strap
Mounting strap
1. Attach four 12 gauge steel guy wires (by others) to substructure above. Guy wires should be angled at approximately 45° or less off the horizontal. Do not tie off loose ends until step 2.
Location Channel
For 1″ T-bar only
Support plate assembly
5, 6 Install mounting strap
T-bar (1-1/2″ shown)
2. Drill a 2-1/4 inch diameter hole in ceiling tile at desired mount location
using a hole saw. Ensure center of hole is minimum 2 inches away from edge of
T-bar. Note: This mounting system is designed to work with 1 inch and/or 1-1/2
inch T-bar systems. Determine specific application and follow appropriate
instructions in step 3.
3. For 1 inch T-bar slide location channel through mounting strap., and fold
tabs of location channel as shown. 3. For 1-1/2 inch T-bar slide location
channel through mounting strap, and use location channel as shipped.
Safety screw (1-1/2″ shown)
4. Snap support plate assembly past mounting strap tabs to bottom of location
channel.
5. Through an adjacent tile, place mounting assembly over 2-1/4 inch diameter
hole and adjust mounting strap to desired position. Once strap is aligned with
mounting location, snap assembly to T-bar.
7, 8 Install safety screws & guy wires
6. To secure location channel, screw a self-tapping metal screw (supplied by others) into T-bar at each end.
Guy wire (buy others)
Safety screw
Safety screw
Important: Location channel is designed to locate mounting point, NOT to
support fixture.
7. From below installed mount, tighten the two #8 sheet metal screws, to bind
location channel, mounting strap And support plate together.
1″ T-bar
8 screw
1-1/2″ T-bar
8. IMPORTANT: Attach guy wires installed in the first step to support plate by threading free ends through corner holes and tightly wrapping wires around themselves a minimum of four turns.
11/30/2023 page 17 www.ledalite.com Rev D
ID-M5
M5 Cable Mount Instruction Sheet Support Connection at Ceiling
9 Attach canopy, collar, and gripper
Mounting strap
9. Secure canopy to mounting strap by threading the collar onto the mounting
strap ¼-20″ stud.
Important: Fully tighten the ¼-20″ gripper against mounting strap hex nut.
Canopy
Collar Gripper
Installed
10. Insert crimp end of A/C cable into luminaire. Feed free end of A/C cable
into gripper.
After cables have been secured, carefully lower luminaire until supported by
cable. Cut excess cable after the desired height is determined and luminaire
is level.
If applicable, make appropriate power connections at fixture level.
10 Install A/C into gripper
Installed
11/30/2023 page 18 www.ledalite.com Rev D
ID-M5
M5 Cable Mount Instruction Sheet Support Connection at Ceiling
1-8 Install ceiling mounting components non-power
Refer to steps 1 8 prior to starting power versions of the mounting in step 11
11 -13
Install power and J-box
J-box (by others) T-bar
(1-1/2″ shown)
Power Cord S/M screw
Safety screw (1-1/2″ shown)
14 Install safety screws & guy wires
Electrical conduit
Guy wire (buy others)
11. Assemble j-box, strain relief connector, and power cord. 12. Feed power
cord through mounting strap hole(s). 13. Fasten j-box assembly to mounting
strap using a self tapping sheet screw. (supplied by others) 14. Connect
electrical conduit to j-box and make required electrical connections. 15.
Insert and feed power cord through canopy hole. 16. Secure canopy to mounting
strap by threading the collar onto the mounting strap ¼-20″ stud. 17. Insert
crimp end of A/C cable into luminaire. Feed free end of A/C cable into
gripper. After cables have been secured, carefully lower luminaire until
supported by cable. Cut excess cable after the desired height is determined
and luminaire is level. If applicable, make appropriate power connections at
fixture level.
15-17 Install safety screws & guy wires
Safety screw
Safety screw
1″ T-bar
8 screw
1-1/2″ T-bar
Canopy
Installed
Important: Fully tighten the ¼-20″ gripper against mounting strap hex nut.
Collar Gripper
A/C cable
!
ATTENTION: Install in accordance with local and national building and electric codes.
11/30/2023 page 19 www.ledalite.com Rev D
www.signify.com
ID-M6 Cable Mount
Installation Instruction
Support Connection at Ceiling
IMPORTANT: Read all instructions including fixture/sensor wiring AND mechanical details before beginning installation.
M6 On-grid Mount T-grid ceiling What is Included in this package:
M6-P0 M6 Cable Mounting Installation without Power M6-P1 M6 Cable Mounting
Installation with Power
M6 P0
· A/C WIRE GRIPPER (x1) · CADDY IDS CLIP (x1) · COLLAR (x1) · MOLDED CANOPY
(x1)
M6 P1
· A6 POWER ADAPTER BRACKET (x1) · A/C WIRE GRIPPER (x1) · CADDY IDS CLIP (x1)
· COLLAR (x1) · HEX NUT, 10-24 (x2) · ELEC, FLEX CONDUIT ½: #XC-241 (x1) ·
SCREW, 10-24 X 9/16″ (x2) · MOLDED CANOPY (x1) · HEYCO BUSHING SNAP (x1) ·
HEYCO BUSHING STRAIN (X2)
PLEASE RETAIN PACKAGE FOR FUTURE REFERENCE
TOOLS REQUIRED: Phillips screwdriver, Flat-head screwdriver, #2 Robertson
screwdriver (optional), A/C wire cutters, Pliers
11/30/2023 page 20 www.ledalite.com Rev D
ID-M6
M6 Cable Mount Instruction Sheet Support Connection at Ceiling
1 Install ceiling mounting components non-power
ATTENTION: Install in accordance to national and local electrical codes and
building codes. ATTENTION: Refer to associated installation instruction to
complete installation (e.g, leveling, joining, powered and non powered
mounts.)
This mounting system is available for 1″, 9/16″, or 9/16″ x 5/16″ screw slot
t-bar grid systems.
Important: Mounting system will support a MAXIUMUM 65lbs LOAD.
Note: Power mount requires use of a 4″ square electrical junction box (contractor supplied).
NON-POWER MOUNT (Refer to Figure 1)
Hanger wire
T-bar
1. Remove ceiling tiles at mount location. 2. Disassemble t-bar clip and lock into place around t-bar.
T-bar clip
3. Secure t-bar clip to structure above using an approved hanger wire.
4. Slide the canopy overtop the t-bar clip bolt, then thread gripper
FIGURE 1
onto the bolt. Fully tighten the gripper.
5. Insert crimp end of A/C cable into luminaire. Feed
free end of A/C cable into gripper. 6. After cables have been secured, carefully lower
Canopy
luminaire until supported by cable. 7. Cut excess cable after the desired height is determined and
Collar
luminaire is level.
8. If applicable, make appropriate power connections at fixture level.
Gripper
9. Replace ceiling tiles.
POWER MOUNT (Refer to Figures 2 to 6) 1. Remove ceiling tiles at mount location.
Aircraft cable
2. Disassemble t-bar clip and lock into place around t-bar.
3. Secure junction box bracket to t-bar clip using flat-top screw and locknut.
4. Attach an approved hanger wire from structure above to junction box bracket.
5. Attach junction box to bracket using flat-top screw and locknut. Junction box should be oriented with three knockouts
facing down.
Continue on next page
Hanger wire Lock nut
Junction box bracket
FIGURE 3
FIGURE 2
Fla-top screw
11/30/2023 page 21 www.ledalite.com Rev D
ID-M6
M6 Cable Mount Instruction Sheet Support Connection at Ceiling
POWER MOUNT (cont.) 6. Attach flex-conduit connector to center knockout in
bottom of junction
box. 7. Slide canopy over the t-bar clip bolt, then thread the gripper onto
the
bolt. Fully tighten the gripper. 8. Install power cord, make required
electrical connections, and install
junction box cover. 9. Insert crimp end of A/C cable into luminaire. Feed free
end of A/C cable into gripper. 10. After cables have been secured, carefully
lower luminaire until supported by cable. 11. Cut excess cable after the
desired height is determined and luminaire is level. 12. If applicable, make
appropriate power connections at fixture level. 13. Notch ceiling tile to
clear the flex-conduit connector. 14. See Figure 6 for cutting dimensions. 15.
Replace ceiling tiles.
FIGURE 4
FIGURE 5
Cut ceiling tile
3/4″
1-1/4″
FIGURE 6
!
ATTENTION: Install in accordance with local and national building and electric codes.
11/30/2023 page 22 www.ledalite.com Rev D
www.signify.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>