V I V O PP-WM48B Wall Mounted Metal Pegboard Instruction Manual

May 15, 2024
V I V O

VIVO Logo Wall Mounted Metal Pegboard
Instruction ManualVIVO PP-WM48B Wall Mounted Metal
Pegboard SKU: PP-WM48B

PP-WM48B Wall Mounted Metal Pegboard

https://vivo-us.com/products/pp-wm48b

Scan the QR code with your mobile device or follow the link for helpful videos and specifications related to this product. https://vivo-us.com/products/pp- wm48b
GET IN TOUCH | Monday-Friday from 7:00am-7:00pm CST

| |
---|---|---
[email protected]| www.vivo-us.com
Chat live with an agent!| 309-278-5303

WARNING!
If you do not understand these directions, or if you have any doubts about the safety of the installation, please contact our product support team at 309-278-5303 or help@vivo- us.com for further assistance.
Check carefully to make sure there are no missing or defective parts.
Improper installation may cause damage or serious injury. Do not use this product for any purpose that is not explicitly specified in this manual. Do not exceed weight capacity. We cannot be liable for damage or injury caused by improper mounting, incorrect assembly or inappropriate use.
WARNING: CHOKING HAZARD
SMALL PARTS – NOT FOR CHILDREN UNDER 3 YEARS. ADULT SUPERVISION IS REQUIRED.

PACKAGE CONTENTS

| |
---|---|---
A (x3)
Panel| W-A (x18)
ST4x30mm Screw| W-B (x18)
Concrete Anchors

TOOLS NEEDED DO NOT EXCEED WEIGHT CAPACITY.
Failure to do so may result in serious injury.

WOOD WALL INSTALLATION

STEP 1 (Wood Wall)
Wood Wall:
Place a Panel (A) against the wall and and mark the drilling locations with a pencil.
For a wood stud wall, make sure that the holes line up with the studs. Use of a level and a stud finder is recommended. Drill 13/16” (30mm) deep holes using a 7/64” (3mm) drill bit, then install the Panel (A) using ST4x30mm Screws (W-A).
NOTE: If mounting to wood studs, make sure that the edge of the panel is centered with the stud. If not, it will cause the misalignment of future panels.

VIVO PP-WM48B Wall Mounted Metal Pegboard - centered STEP 2 (WOOD WALL)
Line up the other two Panels (A) with the first one and mark the screw holes. Drill 13/16” (30mm) deep holes using a 7/64” (3mm) drill bit, then install the Panel (A) using ST4x30mm Screws (W-A).VIVO PP-WM48B Wall Mounted Metal
Pegboard - Panels

CONCRETE WALL INSTALLATION

STEP 1 (Concrete Wall)
Place a Panel (A) against the wall and and mark the drilling locations with a pencil. Use of a level is recommended.
Drill 1-⅜” (35mm) deep holes using a 15/64” (6mm) drill bit, then insert the Concrete Anchors (W-B) into the holes and install the Panel (A) using ST4x30mm Screws (W-A). VIVO PP-WM48B Wall Mounted Metal Pegboard - Concrete Anchors
1STEP 2 (Concrete Wall)
Line up the other two Panels (A) with the first one and mark the screw holes. Drill 1-⅜” (35mm) deep holes using a 15/64” (6mm) drill bit, then insert the Concrete Anchors (W-B) into the holes and install the Panels (A) using ST4x30mm Screws (W-A). VIVO PP-WM48B Wall Mounted Metal Pegboard - drill
bit[ THIS PAGE INTENTIONALLY LEFT BLANK ] Love your new VIVO setup and want to share?
Tag us in your photo! @vivo_us
LAST UPDATED: 08/28/2023
REV1 Open Monday – Friday 7:00am – 7:00pm CS T,
our dedicated support team can offer immediate assistance with rapid response times. If any parts are received damaged or defective, please contact us. We are happy to replace parts to ensure you have a fully functioning product.

| 309-278-5303| AVG. RESOLUTION TIME (within office hrs): 5M 4S
---|---|---
| www.vivo-us.com
Chat live with an agent!| AVG. RESOLUTION TIME (within office hrs): < 15 M
| [email protected]| AVG. RESPONSE TIME (within office hrs): 1HR 8M
– 23% within < 15m
– 38% within < 30m
– 61% within < 1hr
– 83% within < 2hr
– 92% within < 3hr

FOR MORE VIVO PRODUCTS, CHECK OUT OUR WEBSITE AT: www.vivo-us.comVIVO Logo

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

V I V O User Manuals

Related Manuals