NATIONAL FIRE PRODUCTS NFP240624 Specflex Bracket for Hat Furring Channels Instruction Manual
- June 17, 2024
- National Fire Products
Table of Contents
Specflex
Bracket for Hat Furring Channels
NFP240624 Figure Number
Installation instructions
WARNING
- You must read and understand all instructions and warnings before attempting to install any Specflex sprinkler drop system components.
- Failure to follow these instructions can lead to improper operation, resulting in serious injury, death or property damage.
- We recommend wearing safety glasses or goggles, a hard hat and shoes with foot protection during installation.
REQUIRED system parts
Flexible Hose (Braided)
NFP240624 Pre-Assembled Bracket
REQUIRED Tools
Pipe Wrench, Screwdriver
PTFE Tape
Installation instructions
-
Inspect the Specflex sprinkler drop system components for any sign of physical damage. Make sure all components are included and in the proper order.
-
Disconnect the inlet nipple and outlet reducer from the flexible hose and check that each sealing gasket is in place properly. Reconnect outlet reducer to the flexible hose.
-
Ensure that both end threads are clean without any damage. Apply PTFE tape to the inlet nipple threads. Use a pipe wrench to connect the inlet nipple to the branch line.
-
Use a pipe wrench to connect the flexible hose to the inlet nipple. Torque range should be a minimum of 50 to a maximum of 58 ft-lbs. DO NOT use PTFE tape on the inlet nipple thread to connect to the Flexible hose.
-
Loosely assemble the adjustable end bracket based on the distance between the hat furring channels. Attach the NFP240624 bracket to the hat furring channels. Ensure the leg of each end bracket is properly engaged to the hat furring channels.
-
Tighten the wing bolts to secure the end brackets onto the hat furring channels. The recommended torque is 1.40–1.48 ft-lbs (190-200 cN • m).
DO NOT overtighten the wing bolt with tools. This may cause damage to the wing bolt. -
Latch down the lever and tighten the top wing bolt on the adjustable end bracket to secure it onto the stock bar. The recommended torque is 1.40–1.48 ft-lbs (190-200 cN • m).
-
Tighten two sheet metal screws on each end of the bracket, making sure to fully penetrate the hat furring channel. The recommended torque is 1.40–1.48 ft-lbs (190-200 cN • m).
Ensure the bottom wing bolts on both ends of the bracket are fully tightened. -
Press the release pin and open the center bracket. Load the flex hose on the proper height position in accordance with the type of sprinkler head being used.
Close the gate of the center bracket from the left to right and firmly push the lever toward the stock bar until it clicks to secure the outlet reducer. -
Verify the location marking on the outlet reducer and match the outlet location for the remaining head installations.
ferguson.com/nfp
©2023 Ferguson Enterprises, LLC 1023 4902543
Documents / Resources
|
NATIONAL FIRE PRODUCTS NFP240624 Specflex Bracket for Hat Furring
Channels
[pdf] Instruction Manual
NFP240624 Specflex Bracket for Hat Furring Channels, NFP240624, Specflex
Bracket for Hat Furring Channels, Bracket for Hat Furring Channels, Hat
Furring Channels, Furring Channels, Channels
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>