Deye SUN-29.9K-SG01HP3-EU-BM3 Hybrid Inverter User Manual
- June 15, 2024
- Deye
Table of Contents
Hybrid Inverter
SUN-29.9K-SG01HP3-EU-BM3
SUN-30K-SG01HP3-EU-BM3
SUN-35K-SG01HP3-EU-BM3
SUN-40K-SG01HP3-EU-BM4
SUN-50K-SG01HP3-EU-BM4
User Manual
SUN-29.9K-SG01HP3-EU-BM3 Hybrid Inverter
About This Manual
The manual mainly describes the product information, guidelines for
installation, operation and maintenance. The manual cannot include complete
information about the photovoltaic (PV) system.
How to Use This Manual
Read the manual and other related documents before performing any operatoon on
the inverter. Documents must be stored carefully and be available at all
times.
Contents may be periodically updated or revised due to product development.
The information in this manual is subject to change without notice. The latest
manual can be acquired via service@deye.com.cn
Safety Introductions
Safety signs
| The DC input terminals of the inverter must not be grounded.
---|---
| The AC and DC circuits must be disconnected separately, and the maintenance
personnel must wait for 5 minutes before they are completely powered off before
they can start working.
| Please read the instructions carefully before use.
| Surface high temperature, Please do not touch the inverter case.
| Prohibit disassembling inverter case, there existing shock hazard, which may
cause serious injury or death, please ask
qualified person to repair.
| Do Not put it in the waste bin! Recycle it by licensed professional!
- This chapter contains important safety and operating instructions. Read and keep this manual for future reference.
- Before using the inverter, please read the instructions and warning signs of the batiery and corresponding sections in the instruction manual.
- Do not disassemble the inverter. If you need maintenance or repair, take it to a professional service center.
- Improper reassembly may result in electric shock or fire.
- To reduce risk of electric shock, disconnect all wires before atiempting any maintenance or cleaning. Turning off the unit will not reduce this risk.
- Caution: Only qualified personnel can install this device with batiery.
- Never charge a frozen batiery.
- For optimum operation of this inverter, please follow required specification to select appropriate cable size. It is very important to correctly operate this inverter.
- Be very cautious when working with metal tools on or around batieries. Dropping a tool may cause a spark or short circuit in batieries or other electrical parts, even cause an explosion.
- Please strictly follow installation procedure when you want to disconnect AC or DC terminals. Please refer to “Installation” section of this manual for the details.
- Grounding instructions – this inverter should be connected to a permanent grounded wiring system. Be sure to comply with local requirements and regulation to install this inverter.
- Never cause AC output and DC input short circuited. Do not connect to the mains when DC input short circuits.
Product Introductions
This is a multifunctional inverter, combining functions of inverter, solar
charger and batiery charger to offer uninterruptible power support with
portable size. Its comprehensive LCD display offers user configurable and easy
accessible bution operation such as batiery charging, AC/solar charging, and
acceptable input voltage based on different applications.
2.1 Product Overview
1: Inverter indicators
2: LCD display
3: Function buttons
4: Power on/off buton
5: DC switch
6: Meter port| 7: Parallel port
8: CAN port
9: DRM port
10: BMS port
11: RS485 port
12: Generator input| 13: Grid
14: Function port
15: Load
16: PV input
17: Battery input
18: WiFi Interface
---|---|---
2.2 Product Size 2.3 Product Features
– 230V/400V Three phase Pure sine wave inverter.
– Self-consumption and feed-in to the grid.
– Auto restart while AC is recovering.
– Programmable supply priority for battery or grid.
– Programmable multiple operation modes: On grid, off grid and UPS.
– Configurable battery charging current/voltage based on applications by LCD
setting.
– Configurable AC/Solar/Generator Charger priority by LCD setting.
– Compatible with mains voltage or generator power.
– Overload/over temperature/short circuit protection.
– Smart battery charger design for optimized battery performance
– With limit function, prevent excess power overflow to the grid.
– supporting WIFI monitoring and build-in 2 strings for 1 MPP tracker, 1
string for 1 MPP tracker.
– Smart settable three stages MPPT charging for optimized battery performance.
– Time of use function.
– Smart Load Function.
2.4 Basic System Architecture
The following illustration shows basic application of this inverter.
It also includes following devices to have a complete running system.
– Generator or Utility
– PV modules
Consult with your system integrator for other possible system architectures
depending on your requirements.
This inverter can power all kinds of appliances in home or office environment,
including motor type appliances such as refrigerator and air conditioner.
2.5 Product handling requirements
Two people stand on both sides of the machine, holding two handles to lift the
machine.
Installation
3.1 Parts List
Check the equipment before installation. Please make sure nothing is damaged
in the package. You should have received the items in the following package:
3.2 Mounting instructions
Installation Precaution
This Hybrid inverter is designed for outdoor use(IP6S), Please make sure the
installation site meets below conditions:
– Not in direct sunlight
– Not in areas where highly flammable materials are stored.
– Not in potential explosive areas.
– Not in the cool air directly.
– Not near the television Antenna or antenna cable.
– Not higher than altitude of about 2000 meters above sea level.
– Not in environment of precipitation or humidity(>95%)
Please AVOID direct sunlight, rain exposure, snow laying up during
installation and operation. Before connecting all wires, please take off the
metal cover by removing screws as shown below: Considering the
following points before selecting where to install:
– Please select a vertical wall with load-bearing capacity for installation,
suitable for installation on concrete or other non-flammable surfaces,
installation is shown below.
– Install this inverter at eye level in order to allow the LCD display to be
read at all times.
– The ambient temperature is recommeded to be between -40~60 C to ensure
optimal operation.
– Be sure to keep other objects and surfaces as shown in the diagram to
guarantee sufficient heat dissipation and have enough space for removing
wires. For proper air circulation to dissipate
heat, allow a clearance of approx. 50cm to the side and approx. 50cm above and
below the unit. And 100cm to the front.
Mounting the inverter
Remember that this inverter is heavy! Please be careful when lifting out from
the package.
Choose the recommend drill head(as shown in below pic) to drill 4 holes on the
wall, 62-70mm deep.
- Use a proper hammer to fit the expansion bolt into the holes.
- Carry the inverter and holding it, make sure the hanger aim at the expansion bolt,fix the inverter on the wall.
- Fasten the screw head of the expansion bolt to finish the mounting.
3.3 Battery connection
For safe operation and compliance, a separate DC over-current protector or
disconnect device is required between the battery and the inverter. In some
applications, switching devices may not be required but over-current
protectors are still required. Refer to the typical amperage in the table
below for the required fuse or circuit breaker size. Safety Hint:
Please use approved DC cable for battery system.
Model | Cross section (mm2 ) |
---|---|
Range | Recommended value |
29.9/30/35/40/50kW | 16. 00-25.0 (6-4AWG) |
Chart 3-2
The steps to assemble the battery plug connectors are listed as follows: a)
Pass the cable through the terminal. (as shown in picture 3.3) b) Put on the rubber ring. (as shown in picture 3.4)c) crimp terminals. (as shown in picture 3.5) d) Fasten terminal with a bolt. (as shown in picture 3.6)e) Fasten the terminal with outer cover. (as shown in picture
3.7) 3.3.2 Function port
definition 3.4 Grid connection and backup
load connection
- Before connecting to the grid, a separate AC breaker must be installed between the inverter and the grid, and also between the backup load and the inverter.This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current. For the 29.9/30/35/40/50kW model, the recommended AC breaker for backup load is 240A. For the 29.9/30/35/40/50kW model, the recommended AC breaker for grid is 240A.
- There are three terminal blocks with “Grid” “Load”and “GEN” markings. Please do not misconnect input and output connectors.
All wiring must be performed by a qualified personnel.It is very important for
system safety and efficient operation to use appropriate cable for AC input
connection. To reduce risk of injury, please use the proper recommended cable
as below.
Grid connection and backup load connection (Copper wires) (bypass)
Model | Wire Size | Cable(mm2) | Torque value(max) |
---|---|---|---|
29.9/30/35/40/50kW | 4/0AWG | 107 | 28.2Nm |
Grid connection and backup load connection (Copper wires)
Model | Wire Size | Cable(mm2) | Torque value(max) |
---|---|---|---|
29.9/30/35kW | B6AWG | 133 | 12.4Nm |
40kW | 4AWG | 211 | 12.4Nm |
50kw | 2AWG | 336 | 16.9Nm |
Chart 3-3 Recommended Size for AC wires
Please follow below steps to implement Grid, load and Gen port connection:
- Before making Grid, load and Gen port connection, be sure to turn off AC breaker or disconnector first.
- Remove insulation sleeve 10mm length, insert the wires according to polarities indicated on the terminal block. Make sure the connection is complete. Be sure that AC power source is disconnected before attempting to wire it to the unit.
- Then, insert AC output wires according to polarities indicated on the terminal block and tighten terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well.
- Make sure the wires are securely connected.
- Appliances such as air conditioner are required at least 2-3 minutes to restart because it is required to have enough time to balance refrigerant gas inside of circuit. Ifa power shortage occurs and recovers in short time, it will cause damage to your connected appliances. To prevent this kind of damage, please check manufacturer of air conditioner if it is equipped with time-delay function before installation. Otherwise, this inverter will trigger overload fault and cut off output to protect your appliance but sometimes it still causes internal damage to the air conditioner
3.5 PV Connection
Before connecting to PV modules, please install a separately DC circuit
breaker between inverter and PV modules. It is very important for system
safety and efficient operation to use appropriate cable for PV module
connection.
To avoid any malfunction, do not connect any PV modules with possible leakage
current to the inverter. For example, grounded PV modules will cause leakage
current to the inverter. When using PV modules, please ensure the PV+ & PV- of
solar panel is not connected to the system ground bar.
It is requested to use PV junction box with surge protection. Otherwise, it
will cause damage on inverter when lightning occurs on PV modules.
3.5.1 PV Module Selection:
When selecting proper PV modules, please be sure to consider below parameters:
- Open circuit Voltage (Voc) of PV modules can not exceed max. PV array open circuit voltage of inverter.
- Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage.
- The PV modules used to connected to this inverter shall be Class A rating certified according to IEC 61730.
Inverter Model | 29.9kW | 30kW | 35kW | 40kW | 5%W |
---|---|---|---|---|---|
PV Input Voltage | 600V (180V∼1000V) | ||||
PV Array MPPT Voltage Range | 1S0V-850V | ||||
No. of MPP Trackers | 3 | 4 | |||
No. of Strings per MPP Tracker | 2+2+2 | 2+2+2+2 |
Chart 3-5
3.5.2 PV Module Wire Connection:
- Switch the Grid Supply Main Switch(AC)OFF.
- Switch the DC Isolator OFF.
- Assemble PV input connector to the inverter.
Safety Hint:
When using PV modules, please ensure the PV+ & PV- of solar panel is not
connected to the system ground bar.
Safety Hint:
Before connection, please make sure the polarity of PV array matches the “DC+”
and “DC-” symbols.
Safety Hint:
Before connecting inverter, please make sure the PV array open circuit voltage
is within the 1000V of the inverter. Safety Hint:
Please use approved DC cable for PV system.
Cable type | Cross section (mm2 ) |
---|---|
Range | Recommended value |
Industry generic PV cable (model: PV1-F) | 2.5-4 (12-10AWG) |
Chart 3-6
The steps to assemble the DC connectors are listed as follows:
a) Strip off the DC wire about 7mm, disassemble the connector cap nut (see
picture 5.3).b) Crimping metal terminals with
crimping pliers as shown in picture 5.4. c) Insert the
contact pin to the top part of the connector and screw up the cap nut to the
top part of the connector. (as shown in picture 5.5). d) Finally insert the DC connector into the positive and negative
input of the inverter, shown as picture 5.6 Warning:
Sunlight shines on the panel will generate voltage, high voltage in series may
cause danger to life. Therefore, before connecting the DC input line, the
solar panel needs to be blocked by the opaque material and the DC switch
should be ‘OFF”, otherwise, the high voltage of the inverter may lead to life-
threatening conditions. Please do not switch off DCisolator when the DC
current when there is high voltage or current.Technicians need to wait until
night to keep safety.
Warning:
Please use its own DC power connector from the inverter accessories. Do not
interconnect the connectors of different manufacturers.Max. DC input current
should be 20A. if exceeds, it may damage the inverter and it is not covered by
Deye warranty.
*3.6 CT Connection Note: when the reading of the
load power on the LCD is not correct, please reverse the CT arrow.
3.6.1 Meter Connection Note:
When the inverter is in the off-grid state, the N line needs to be connected
to the earth.
Note:
In final installation, breaker certified according to IEC 60947-1 and IEC
60947-2 shall be installed with the equipment.
3.7 Earth Connection(mandatory)**
Ground cable shall be connected to ground plate on grid side, this prevents
electric shock if the original protective conductor fails.
Model | Wire Size | Cable(mm2) | Torque value(max) |
---|---|---|---|
29.9/30/35/40/50kW | 0AWG | 53.5 | 20.3Nm |
The conductor should be made of the same metal as the phase conductors.
3.8 WIFI Connection
For the configuration of Wi-Fi Plug, please refer to illustrations of the Wi-
Fi Plug. The Wi-FI Plug is not a standard configuration, it’s optional.
3.9 Wiring System for Inverter 3.10 Wiring diagram
This diagram is an example for an application in which neutral is separated
from the PE in the distribution box.
For countries such as China, Germany,the Czech Republic, Italy, etc., please
follow local wiring reguations!
Note: Backup function is optional in German market.please leave backup
side empty if backup function is not available in the inverter. 3.11 Typical application diagram
of diesel generator 3.12 Three phase parallel
connection diagram
Note: For the parallel system, the lead-acid battery is not supported.
Please use Deye approved lithium battery.
OPERATION
4.1 Power ON/OFF
Once the unit has been properly installed and the batteries are connected
well, simply press On/Off button(located on the left side of the case) to turn
on the unit. When system without battery connected, but connect with either PV
or grid, and ON/OFF button is switched off, LCD wil still light up(Display
will show OFF), In this condition, when switch on ON/OFF button and select NO
battery,system can still working.
4.2 Operation and Display Panel
The operation and display panel, shown in below chart, is on the front panel
of the inverter.
Itincludes four indicators, four function keys and a LCD display, indicating
the operating status and input/output power information.
LED Indicator | Messages |
---|---|
DC | Green led solid light |
AC | Green led solid light |
Normal | Green led solid light |
Alarm | Red led solid light |
Chart 4-1 LED indicators
Function Key | Description |
---|---|
Esc | To exit setting mode |
up | To go to previous selection |
Down | To go to next selection |
Enter | To confirm the selection |
Chart 4-2 Function Buttons
LCD Display Icons
5.1 Main Screen
The LCD is touchscreen, below screen shows the overall information of the
inverter.
- The icon in the center of the home screen indicates that the system is Normal operation. If it turns into “comm./FO1~F64” , it means the inverter has communication errors or other errors, the error message will display under this icon(FO1-F64 errors, detail error info can be viewed in the System Alarms menu).
- At the top of the screen is the time.
- System Setup Icon, Press this set button,you can enter into the system setup screen which including Basic Setup, Battery Setup, Grid Setup, System Work Mode, Generator port use, Advanced function and Li-Batt info.
- The main screen showing the info including Solar, Grid, Load and Battery. ts also displaying the energy flow direction by arrow. When the power is approximate to high level, the color on the panels will changing from green to red so system info showing vividly on the main screen.
- PV power and Load power always keep positive.
- Grid power negative means sell to grid, positive means get from grid.
- Battery power negative means charge, positive means discharge.
5.1.1 LCD operation flow chart 5.2 Solar Power Curve
This is Solar Panel detail page.
(1) Solar Panel Generation.
(2) Voltage, Current, Power for each MPPT.
(3) Daily and total PV production.
Press the “Energy “button will enter into the power curve page. This is
Inverter detail page.
(1) Inverter Generation.
Voltage, Current, Power for each Phase.
AC-T: mean Heat-sink temperature. This is Load detail page.
(1) Load Power.
(2) Voltage, Power for each Phase.
(3) Daily and total Load consumption .
When you check “Selling First” or “Zero export to Load” on system work mode
page, the information on this page is about backup load which connect on Load
port of hybrid inverter.
When you check “Zero export to CT”on system work mode page, the information on
this page is including backup Ioad and home load.
Press the “Energy “ button will enter into the power curve page. This is
Grid detail page.
(1) status, Power, Frequency.
(2) L: Voltage for each Phase
CT: Power detected by the external current sensors
LD: Power detected using intemnal sensors on ACerid in/out breaker
(3) BUY: Energy from Grid to Inverter,
SELL: Energy from Inverter to grid.
Press the “Energy “ button will enter into the power curve page. 5.3 Curve Page-Solar & Load & Grid Solar power curve for daily, monthly, yearly and total can be
roughly checked on the LCD, for more accuracy power generation, pls check on
the monitoring system. Click the up and down arrow to check power curve of
different period.
5.4 System Setup Menu This is System Setup page.
5.5 Basic Setup Menu Factory Reset: Reset all parameters of the inverter.
Lock out all changes: Enable this menu for setting parameters that require
locking and cannot be set up.
Before performing a successful factory reset and locking the systems, to keep
all changes you need totype in a password to enable the setting.
The password for factory settings is 9999 and for lock outis 7777. Factory
Reset Password: 9999
Lock out all changes Password: 7777
5.6 Battery Setup Menu Battery capacity: it shows your battery bank
size to Deye hybrid inverter.
Use Batt V: Use Battery Voltage for all the settings (V).
Max. A charge/discharge: Max battery charge/discharge current(0-50A for
29.9/30/35/40/50kW model).
• For AGM and Flooded, we recommend Ah battery size x 20%= Charge/Discharge
amps.
• For Lithium, we recommend Ah battery size x 50% = Charge/Discharge amps.
For Gel, follow manufacturer’ s instructions.
No Batt: tick this item if no battery is connected to the system.
Parallel bat1 &bat2: if one set of battery was connected Bat 1 and Bat 2
then please enable this function. This is Grid Charge, you need select.
(2)
Start =30%: No use, Just for customization.
A =50A: It indicates the Current that the Grid charges the Battery.
Grid Charge: It indicates that the grid charges the battery.
Grid Signal: Disable.
This is Battery Setuppage. (1) (3)
Start =30%: Percent SOC below 30% system will AutoStart a connected
generator to charge the battery bank.
A =50A: Charge rate of 50A from the attached generator in Amps.
Gen Charge: uses the gen input of the system to charge battery bank from
an attached generator.
Gen Signal: Normally open relay that closes when the Gen Start signal
state is active.
Gen Max Run Time: It indicates the longest time Generator can run in one
day, when time is up, the Generator will be turned off. 24H means that it does
not shut down all the time.
Gen Down Time: It indicates the delay time of the Generator to shut down
after it has reached the running time. This page tells the PV
and diesel generator power the load and battery. This page tells generator
output voltage, frequency, power. And, how much energy is used from generator.
Lithium Mode: This is BMS protocol.Please reference the document(Approved
Battery).
Shutdown 10%: It indicates the inverter will shutdown if the SOC below
this value.
Low Batt 20%: It indicates the inverter will alarm if the SOC below this
value.
Restart 40%: Battery SOC at 40% AC output wil resume.
Recommended battery settings
Battery Type| Absorption Stage| Float Stage| Torque value
(every 30 days 3hr )
---|---|---|---
Lithium| Follow its BMS voltage parameters
5.7 System Work Mode Setup Menu Work Mode
Selling First: This Mode allows hybrid inverter to sell back any excess
power produced by the solar panels to the grid. If time of use is active, the
battery energy also can be sold into grid.
The PV energy will be used to power the load and charge the battery and then
excess energy will flow to grid.
Power source priority for the load s as follows:
- Solar Panels.
- Grid.
- Batteries (until programable % discharge is reached).
Zero Export To Load: Hybrid inverter will only provide power to the
backup load connected. The hybrid inverter will neither provide power to the
home load nor sell power to grid. The built-in CT will detect power flowing
back to the grid and will reduce the power of the inverter only to supply the
local load and charge the battery. Zero Export To CT:
Hybrid inverter will not only provide power to the backup load connected but
also give power to the home load connected. If PV power and battery power is
insufficient, it willtake grid energy as supplement. The hybrid inverter will
not sell power to grid. In this mode, a CT is needed. The installation method
of the CT please refer to chapter 3.6 CT Connection. The external CT will
detect power flowing back to the grid and will reduce the power of the
inverter only to supply the local load, charge battery and home load. Solar Sell: “Solar sell” is for Zero export to load or Zero
export to CT: when this item is active, the surplus energy can be sold back to
grid. When it s active, PV Power source priority usage is as follows: load
consumption and charge battery and feed into grid.
Max. sell power: Allowed the maximum output power to flow to grid.
Zero-export Power: for zero-export mode, it tells the grid output power.
Recommend to set it as 20-100W to ensure the hybrid inverter won’t feed power
to grid.
Energy Pattern: PV Power source priority.
Batt First: PV power is firstly used to charge the battery and then used
to power the load. If PV power s insufficient, grid will make supplement for
battery and load simultaneously.
Load First: PV power is firstly used to power the load and then used to
charge the battery. If PV power is insufficient, Grid will provide power to
load.
Max Solar Power: allowed the maximum DC input power.
Grid Peak-shaving: when it is active, grid output power will be limited
within the set value. If the load power exceeds the allowed value, it will
take PV energy and battery as supplement. If still can’t meet the load
requirement, grid power will increase to meet the load needs. Time of use:
it is used to program when to use grid or generator to charge the battery, and
when to discharge the battery to power the load. Only tick “Time Of Use” then
the follow items (Grid, charge, time, power etc.) will take effect.
Note: when in selling first mode and click time of use, the battery power
can be sold into grid.
Gen charge: utilize diesel generator to charge the battery in atime
period.
Time: real time, range of 01:00-24:00.
Note: when the grid is present, only the “time of use” is ticked, then
the battery will discharge. Otherwise, the battery won’t discharge even the
battery SOCis full. But n the off-grid mode (when grid is not available,
inverter will work in the off-grid mode automatically), the battery will
discharge without selecting the “Time Of Use”.
Power: Max. discharge power of battery allowed.
Batt(V or SOC %): battery SOC % or voltage at when the action is to
happen. For example
During 00:00-05:00,
if battery SOC is lower than 80% it will use grid to charge the battery until
battery SOC reaches 80%.
During 05:00-08:00,
if battery SOC is higher than 40%, hybrid inverter willdischarge the battery
until the SOC reaches 40%. At the same time, if battery SOC is lower than 40%,
then grid wil charge the battery SOC to 40%.
During 08:00-10:00,
if battery SOC is higher than 40%, hybrid inverter willdischarge the battery
until the SOC reaches 40%.
During 10:00-15:00,
when battery SOC is higher than 80%, hybrid inverter will discharge the
battery untilthe SOC reaches 80%.
During 15:00-18:00,
when battery SOC is higher than 40%, hybrid inverter will discharge the
battery until the SOC reaches 40%.
During 18:00-00:00,
when battery SOC is higher than 35%, hybrid inverter will discharge the
battery until the SOC reaches 35%. It allows users to choose which day to
execute the setting of “Time of Use”.
For example, the inverter will execute the time of use page on
Mon/Tue/Wed/Thu/Fri/Sat only.
5.8 Grid Setup Menu Grid Mode:
General Standard. UL1741 & 1EEE1547. CPUC RULE21. SRD-UL-1741. CEI_0_21
Internal. ENSOS49_CZ-PPDS(>16A). Australia_A. Australia_B. Australia_C.
AS4777_NewZealand. VDE4105. OVE-Directive R25. ENS0549 CZ_PPDS_L16A. NRSO97.
G98. G99. EN50549_1_Norway_133V. ENSO549_1 Norway_230V. Japan_200VAC_3P3W.
CE1_0_21_External. CE!_O0_21_Areti. Japan_400VAC_3P3W. Japan_415VAC_3P4W.
EN50549_1 Switzerland.
Please follow the local grid code and then choose the corresponding grid
standard.
Grid level: there’re several voltage levels for the inverter output
voltage when it is in off-grid mode.
LN:220V/LL:380V(AC), LN:230V/LL:400V(AC).
IT system: If the grid system is IT system, then please enable this
option. For example, the IT grid system voltage is 230Vac (the Line voltage
between any two live lines in a three-phase circuit is 230Vac, and the diagram
is as follow) then please enable “IT system” and tick the “Grid level” as
LN:230V/LL:400V(AC) as below picture shows. Normal
connect: The allowed grid voltage/frequency range when the inverter first
time connect to the grid.
Normal Ramp rate: It is the startup power ramp.
Reconnect after trip: The allowed grid voltage /frequency range for the
inverter connects the grid after the inverter trip from the grid.
Reconnect Ramp rate: It is the reconnection power ramp.
Reconnection time: The waiting time period for the inverter connects the
grid again.
PF: Power factor which is used to adjust inverter reactive power. HV1:
Level 1 overvoltage protection point;
(1)HVva2: Level 2 overvoltage protection point; (2) 0.10s—Trip time.
HV3: Level 3 overvoltage protection point.
LV1: Level 1 undervoltage protection point;
LV2: Level 2 undervoltage protection point;
LV3: Level 3 undervoltage protection point.
HF1: Level 1 over frequency protection point;
HF2: Level 2 over frequency protection point;
HF3: Level 3 over frequency protection point.
LF1: Level 1 under frequency protection point;
LF2: Level 2 under frequency protection point;
LF3: Level 3 under frequency protection point.
5.9 Generator Port Use Setup Menu FW: this series inverter is able to
adjust inverter output power according to grid frequency.
Droop F: percentage of nominal power per Hz For example, “Start freq F
50.2Hz, Stop freq F< 51.5, Droop F=40%PE/Hz” when the grid frequency reaches 50.2Hz, the inverter will decrease its active power at Droop F of 40%. And then when grid system frequency is less than 50.1Hz, the inverter will stop decreasing output power.
For the detailed setup values, please follow the local grid code. V(W): Itis used to adjust the inverter active power according to the set grid voltage.
V(Q): It is used to adjust the inverter reactive power according to the set grid voltage.
This function is used to adjust inverter output power (active power and reactive power) when grid voltage changes.
Lock-in/Pn 5%: When the inverter active power is less than 5% rated power, the VQ mode will not take effect.
Lock-out/Pn 20%: If the inverter active power is increasing from 5% to 20% rated power, the VQ mode will take effect again.
For example: V2=110%, P2=80%. When the grid voltage reaches the 110% times of rated grid voltage, inverter output power will reduce its active output power to 80% rated power.
For example: V1=94%, Q1=44%. When the grid voltage reaches the 94% times of rated grid voltage, inverter output power will output 44% reactive output power.
For the detailed setup values, please follow the local grid code. P(Q): Itis used to adjust the inverter reactive power according to the set active power.
P(PF): It used to adjust the inverter PF according to the set active power.
For the detailed setup values, please follow the local grid code.
Lockin/Pn 50%: When the inverter output active power is higher then 50% rated power, it won’t enter the P(PF) mode.
Lockout(Pn 50%: When the inverter output active poweris higher then 50%rated power, it will enter the P(PF) mode.
Note: only when the grid voltage is equal to or higher than 1.05times of rated grid voltage, then the P(PF) mode will take effect. Reserved: This function is reserved.It is not recommended.
5.9 Generator Port Use Setup Menu Generator input rated power: allowed Max. power from diesel generator.
GEN connect to grid input: connect the diesel generator to the grid input port.
Smart Load Output: This mode utilizes the Gen input connection as an output which only receives power when the battery SOC is above a user programmable threshold.
e.g. ON: 100%, OFF: 95%: When the battery bank SOC reaches 100%, Smart Load Port will switch on automatically and power the load connected. When the battery bank SOC < 95% , the Smart Load Port will switch off automatically.
Smart Load OFF Batt
• Battery SOC at which the Smart load will switch off.
Smart Load ON Batt
• Battery SOC at which the Smart load will switch on. simultaneously and then the Smart load will switch on.
On Grid always on: When click “on Grid always on” the smart load will switch on when the grid is present.
Micro Inv Input: To use the Generator input port as a micro-inverter on grid inverter input (AC coupled), this feature will also work with “Grid-Tied” inverters.
* Micro Inv input OFF:* when the battery SOC exceeds setting value, Microinveter or grid-tied inverter will shut down.
Micro Inv input ON: when the battery SOC is lower than setting value, Microinveter or grid-tied inverter will start to work.
AC Couple Frz High:** If choosing“Micro Inv input”, as the battery SOC reaches gradually setting value (OFF), during the process, the microinverter output power will decrease linear. When the battery SOC equals to the setting value (OFF), the system frequency will become the setting value (AC couple Frz high) and the Microinverter will stop working.
MI export to grid cutsoff: Stop exporting power produced by the microinverter to the grid.
- Note: Micro Inv Input OFF and On is valid for some certain FW version only.
5.10 Advanced Function Setup Menu Solar Arc Fault ON: This is only for US.
System selfcheck: Disable. this is only for factory.
Gen Pealc-shaving: Enable When the power of the generator exceeds the rated value of it,the inverter will provide the redundant part to ensure that the generator will not overload.
DRM: For AS4777 standard.
Backup Delay: When the grid cuts off, the inverter will give output power after the setting time.
For example, backup delay: 3ms. the inverter will give output power after 3ms when the grid cuts off.
Note: for some old FW version, the function is not available.
Signal island mode: If “Signal island mode” is checked and When inverter is in off-grid mode, the relay on the Neutral line (load port N line) will switch ON then the N line (load port N line) will bind to inverter ground. Asymmetric phase feeding: If it was checked, the inverter will take power from the grid balance of on each phase (L1/L2/L3) when needed. ![Deye SUN-29.9K-SG01HP3-EU-BM3 Hybrid Inverter
- parts66](https://manuals.plus/wp-content/uploads/2023/12/Deye-SUN-29.9K- SG01HP3-EU-BM3-Hybrid-Inverter-parts66.jpg)Ex_Meter For CT: when using zero-export to CT mode, the hybrid inverter can select EX_Meter For CT function and use the different meters.e.g. CHNT and Eastron.
5.11 Device Info Setup Menu This page show Inverter ID, Inverter version and alarm codes.
HMI: LCD version
MAIN: Control board FW version
Mode
Mode I:Basic Mode II: With Generator Mode III: With Smart-Load Mode IV: AC Couple The 1st priority power of the system is always the PV power, then 2nd and 3rd priority power will be the battery bank or grid according to the settings. The last power backup will be the Generator if it is available.
Limitation of Liability
In addition to the product warranty described alone, the state and local laws and regulations provide financial compensation for the product’s power connection (including violation of implied terms and warranties). The company hereby declares that the terms and conditions of the product and the policy can and can only legally exclude all liability within a limited scope.
Error code | Description | Solutions |
---|---|---|
F01 | DC_Inversed_Failure | 1. Check the PV input polarity 2 , Seek help from |
us, if can not go back to normal state.
F07| DC_START_Failu re| 1. The BUS voltage can’t be built from PV or battery.
2. Restart the inverter, If the fault still exists, please contact us for
help
F13| Working_Mode_change| 1. When the grid type and frequency changed it will
report F13;
2. When the battery mode was changed to “No battery” mode,it will report F13;
3. For some old FW version, it will report F 13 when the system work mode
changed;
4. Generally, it will disappear automatically when shows F 13;
5. If it remains same, turn on DC and AC switch for one minute, then turn on
the DC and AC switch.;
6. Seek help from us, if can not go back to normal state.
F15| AC_OverCurr_SW_Failure| AC side over current fault
1. Please check whether the backup load power and common load power are
within the range;
2. Restart and check whether it is normal;
3. Seek help from us, if can not go back to normal state.
F16| GFCI_Failure| Leakage current fault
1. Check the PV side cable ground connection
2. Restart the system 2-3 times
3., if the fault still existing, please contact us for help.
F18| Tz Ac_OverCurr_Fault| AC side over current fault
1. Please check whether the backup load power and commonload power are within
the range;
2. Restart and check whether it is normal;
3. Seek help from us, if cannot go back to normal state.
F20| Tz_Dc_OverCurr_Fault| DC side over current fault
1. Check PV module connection and battery connection;
2. When in the off-grid mode, the inverter startup with big power load, it
may report F20. Please reduce the load power connected;
3. If it remains same, turn on DC and AC switch for one minute, then turn on
the DC and AC switch.;
4. Seek help from us, if can not go back to normal state.
F21| Tz_HV_Overcurr_fault| BUS over current.
1, Check the PV input current and battery current setting
2. Restart the system 2~3 times.
3. If the fault still exists, please contact us for help.
---|---|---
F22| Tz_EmergStop_Fault| Remotely shutdown
1, it tells the inverter is remotely controlled.
F23| Tz_GFCI_OC_Fault| Leakage current fault
1. Check PV side cable ground connection.
2. Restart the system 2~3 times.
3. If the fault still exists, please contact us for help.
F24| DC_Insulation_Fault| PV isolation resistance is too low
1. Check the connection of PV panels and inverter is firmly and correctly;
2. Check whether the PE cable of inverter is connected to ground;
3. Seek help from us, if can not go back to normal state.
F26| BusUnbalance_Fault| 1. Please wait for a while and check whether it is
normal;
2. When the load power of 3 phases is big different, it will report the F26.
3 .When there’s DC leakage current, it will report F26
4. Restart the system 2~3 times.
5. Seek help from us, if can not go back to normal state.
F29| Parallel_Comm_Fault| 1. When in parallel mode, check the parallel
communication cable connection and hybrid inverter communication address
setting;
2. During the parallel system startup period, inverters will report F29.But
when all inverters are in ON status, it will disappear automatically;
3. If the fault still exists, please contact us for help.
F34| AC_Overload_Fault| 1, Check the backup load connection, make sure it is
in allowed power range
2, If the fault still exists, please contact us for help
F41| Parallel_system_Stop| 1, Check the hybrid inverter work status. If there’
1pcs hybrid inverter shutdown, all hybrid inverters will report F41 fault.
2, If the fault still exists, please contact us for help
F42| Parallel_Version_Fault| 1. Check whether the inverter version is
consistent.
2. Please contact us to upgrade the software version.
F47| AC_OverFreq_Fault| Grid frequency out of range
1. Check the frequency is in the range of specification or not;
2. Check whether AC cables are firmly and correctly connected;
3. Seek help from us, if can not go back to normal state.
---|---|---
F48| AC_UnderFreq_Fault| Grid frequency out of range
1. Check the frequency is in the range of specification or not;
2. Check whether AC cables are firmly and correctly connected;
3. Seek help from us, if can not go back to normal state.
F52| DC_VoltHigh_Fault| BUS voltage is too high
1. Check whether battery voltage is too high;
2. check the PV input voltage, make sure it is within the allowed range;
3. Seek help from us, if can not go back to normal state.
F53| DC_VoltLow_Fault| BUS voltage is too low
1. Check whether battery voltage is too low;
2. If the battery voltage is too low, using PV or grid to charge the battery;
3. Seek help from us, if can not go back to normal state.
F54| BAT2_VoltHigh_Fault| 1. Check the battery 2 terminal voltage is high;
2. Restart the inverter 2 times and restore the factory settings;
3. Seek help from us, if can not go back to normal state.
F55| BAT1_VoltHigh_Fault| 1. Check the battery 1 terminal voltage is high;
2. Restart the inverter 2 times and restore the factory settings;
3. Seek help from us, if can not go back to normal state.
F56| BAT1_VoltLow_Fault| 1. Check the battery 1 terminal voltage is low;
2. Restart the inverter 2 times and restore the factory settings;
3. Seek help from us, if can not go back to normal state.
F57| BAT2_VoltLow_Fault| 1. Check the battery 2 terminal voltage is low;
2. Restart the inverter 2 times and restore the factory settings;
3. Seek help from us, if can not go back to normal state.
F58| Battery_comm_Lose| 1, It tells the communication between hybrid inverter
and battery BMS disconnected when “BMS_Err-Stop” is active;
2, If don’t want to see this happen, you can disable “BMS_Err-Stop” item on
the LCD;
3, If the fault still exists, please contact us for help
F62| DRMs0_stop| 1, the DRM function is for Australia market only;
2, Check the DRM function is active or not;
3, Seek help from us, if can not go back to normal state after restart the
system.
F63| ARC_Fault| 1. ARC fault detection is only for US market;
2. Check PV module cable connection and clear the fault;
3. Seek help from us, if can not go back to normal state
F64| Heatsink_HighTemp_Fault| Heat sink temperature is too high
1. Check whether the working environment temperature is too high;
2. Turn off the inverter for 10mins and restart;
3. Seek help from us, if can not go back to normal state.
Chart 7-1 Fault information
Under the guidance of our company, customers return our products so that
our company can provide service of maintenance or replacement of products of
the same value. Customers need to pay the necessary freight and other related
costs. Any replacement or repair of the product will cover the remaining
warranty period of the product. If any part of the product or product is
replaced by the company itself during the warranty period, all rights and
interests of the replacement product or component belong to the company.
Factory warranty does not include damage due to the following reasons:
- Damage during transportation of equipment;
- Damage caused by incorrect installation or commissioning;
- Damage caused by failure to comply with operation instructions, installation instructions or maintenance instructions ;
- Damage caused by attempts to modify, alter or repair products;
- Damage caused by incorrect use or operation;
- Damage caused by insufficient ventilation of equipment;
- Damage caused by failure to comply with applicable safety standards or regulations ;
- Damage caused by natural disasters or force majeure (e.g. floods, lightning, overvoltage, storms, fires, etc.)
In addition, normal wear or any other failure will not affect the basic
operation of the product.
Any external scratches, stains or natural mechanical wear does not represent a
defect in the product.
Datasheet
Model| SUN-29.9KSG01HP3EU-BM3| SUN-30KSG01HP3EU-BM3| SUN-
35KSG01HP3EU-BM3| SUN-40KSG01HP3EU-BM4| SUN-50KSG01HP3EU-BM4
---|---|---|---|---|---
Battery Input Date
Battery Type| Li-Ion
Battery Voltage Range(V)| 160-800
Max. Charging Current(A)| 50+50
Max. Discharging Current(A)| 50+50
Max. Charging/Discharging Power(W)| 29900| 33000| 38500| 44000| 55000
Number of battery input| 2
Charging Strategy for Li-lon Battery| Self-adaption to BMS
PV String Input Data|
Max. DC Input Power(W)| 38870| 39000| 45500| 52000| 65000
Max. DC Input Voltage (V)| 1000
Start-up Voltage(V)| 180
MPPT Range(V)| 150-850
Full Load DC Voltage Range (V)| 360-850| 360-850| 420-850| 360-850| 450-850
Rated DC Input Voltage (V)| 600
PV Input Current(A)| 36+36+36| 36+36+36+36
Max.PV Isc(A)| 55+55+55| 55+55+55+55
No. of MPPT Trackers| 3| 4
No. of Strings Per MPPT Tracker| 2+2+2| 2+2+2+2
AC Output Data
Rated AC Output and UPS Power(W)| 29900| 30000| 35000| 40000| 50000
Max. AC Output Power(W)| 29900| 33000| 38500| 44000| 55000
Peak Power(off grid)| 1.5 time of rated power, 10 S
AC Output Rated Current(A)| 45.4/43.4| 45.5/43.5| 53.1/50.8| 60.7/58.0|
75.8/72.5
Max. AC Current(A)| 45.4/43.4| 50/47.9| 58.4/55.8| 66.7/63.8| 83.4/79.8
Max. Three-phase Unbalanced
Output Current(A)| 60| 60| 60| 70| 83.3
Max. Continuous AC Passthrough(A)| 200
Power Factor| 0.8 leading to 0.8 lagging
Output Frequency and Voltage| 50/60Hz; 3L/N/PE 220/380, 230/400Vac
Grid Type| Three Phase
Total Harmonic Distortion (THD)| <3% (of nominal power)
DC current injection| <0.5% ln
Efficiency|
Max. Efficiency| 97.60%
Euro Efficiency| 97.00%
MPPT Efficiency| >99%
Protection
Anti-islanding Protection| Integrated
PV Input Lightning Protection| Integrated
PV String Input Reverse Polarity Protection| Integrated
Insulation Resistor Detection| Integrated
Residual Current Monitoring Unit| Integrated
Output Over Current Protection| Integrated
Output Shorted Protection| Integrated
Over Voltage Category| DC Type II / AC Type III
Battery Over Current Protection| Fuses
Certifications and Standards
Grid Regulation| IEC 61727,IEC 62116,CEI 0-21,EN 50549,NRS 097,RD 140,
UNE 217002,OVE-Richtlinie R25,G99,VDE-AR-N 4105
EMC/Safety Regulation| IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2
General Data
Operating Temperature Rande(℃)|
Cooling| Smart cooling
Noise(dB)| ≤65 dB
Communication with BMS| CAN
Weight(kg)| 80
Cabinet size(mm)| 527W×894H×294D (Excluding connectors and brackets)
Protection Degree| IP65
Permissible Altitude| 2000m
Installation Style| Wall-mounted
Warranty| 5 years
Appendix I
Definition of RJ45 Port Pin for BMS1
No. | RS485 Pin |
---|---|
1 | 485_B |
2 | 485_A |
3 | GND_485 |
4 | CAN-H1 |
5 | CAN-L1 |
6 | GND_485 |
7 | 485_A |
8 | 485_B |
Definition of RJ45 Port Pin for BMS2
No. | RS485 Pin |
---|---|
1 | 485_B |
2 | 485_A |
3 | GND_485 |
4 | CAN-H2 |
5 | CAN-L2 |
6 | GND_485 |
7 | 485_A |
8 | 485_B |
Definition of RJ45 Port Pin for Meter
No. | Meter-485 Pin |
---|---|
1 | METER-485_B |
2 | METER-485_A |
3 | GND_COM |
4 | METER-485_B |
5 | METER-485_A |
6 | GND_COM |
7 | — |
8 | — |
Definition of RJ45 Port Pin for RS485
No. | RS485 Pin |
---|---|
1 | Modbus-485_B |
2 | Modbus-485_A |
3 | GND_485 |
4 | — |
5 | — |
6 | GND_485 |
7 | Modbus-485_A |
8 | Modbus-485_B |
RS232
No. | WIFI/RS232 |
---|---|
1 | |
2 | TX |
3 | RX |
4 | |
5 | D-GND |
6 | |
7 | |
8 | |
9 | 12Vdc |
This RS232 port is used to connect the wifi datalogger
Appendix II
- Split Core Current Transformer (CT) dimension: (mm)
- Secondary output cable length is 4m.
EU Declaration of Conformity
**** within the scope of the EU directives
- Electromagnetic compatibility 2014/30/EU (EMC)
- Low Voltage Directive 2014/35/EU (LVD)
- Restriction of the use of certain hazardous substances 2011/65/EU (RoHS)
NINGBO DEYE INVERTER TECHNOLOGY CO.,LTD confirms herewith that the products
described in this document are in compliance with the fundamental requirements
and other relevant provisions of the above mentioned directives. The entire EU
Declaration of Conformity can be found at
www.deyeinverter.com.
Please scan the QR code to download the certification.
https://www.deyeinverter.com/download/#microinverter-4
Ver: 2.2, 2023-09-27
NINGBO DEYE INVERTER TECHNOLOGY CO,, LTD.
Add: No.26 South YongJiang Road, Daqi, Beilun, NingBo, China
Tel: +86 (0) 574 8622 8957
Fax: +86 (0) 574 8622 8852
E-mail: service@deye.com.cn
Web: www.deyeinverter.com