SEAVIEW LTBUSS Light Bar Tops Instruction Manual
- June 15, 2024
- SEAVIEW
Table of Contents
INSTALLATION
INSTRUCTIONS
For Seaview Light Bar Tops:
LTBU, LTBUSS
Refer to website for most up to date instructions and videos.
WWW.SEAVIEWGLOBAL.COM
PARTS INCLUDED
TOOLS NEEDED
Sudbury Elastomeric Marine Sealant is recommended. To purchase call 800-655-7922 or visit www.seaviewglobal.com
-
Route the cables through the LTBU or LTUBSS, and then thread it on.
-
Apply marine adhesive sealant to the LTBU or LTBUSS as shown. Be sure to apply around the push pin hole as well. Insert the LTBU or LTBUSS into the light bar end.
-
Secure the LTBU or LTBUSS with the two black push pins.
-
When securing make sure that LTBU or LTBUSS is facing forward. To check this line up the notch on the LTBU or LTBUSS with the hole on the back of the light bar as shown.
Tel: 800-655-7922
www.seaviewglobal.com
EUROPEAN OFFICE
Tel: +33 4 94 53 27 70
www.seaviewprogress.com
2-08282022
References
- Seaview | Leaders In Mounting Solutions For Marine Electronics
- Profitez des meilleurs équipements pour votre bateau
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>