SEAVIEW Starlink Maritime Top Plate User Manual

June 9, 2024
SEAVIEW

SEAVIEW-LOGO

SEAVIEW Starlink Maritime Top Plate

PARTS NUMBER

SEAVIEW-Starlink-Maritime-Top-Plate-FIG-1

OVERVIEW

SEAVIEW-Starlink-Maritime-Top-Plate-FIG-2

  1. BOLT THE TOP PLATE (1) TO THE SEAVIEW MODULAR MOUNT USING THE 8 BOLTS
    (3) . MAKE SURE THE MODULAR TOP GASKET IS ALIGNED IN THE MODULAR TOP GROOVE. THE GASKET SITS BETWEEN THE MOUNT AND THE TOP PLATE.

  2. PASS YOUR STARLINK CABLE THROUGH THE RUBBER GROMMET (2) , THEN RUN IT ALL THE WAY THROUGH THE TOP PLATE AND MOUNT.

  3. ALIGN THE GROMMET (2) TO THE LIP IN THE CENTER OF THE PLATE (1) . MAKE SURE THE GROOVE IN THE GROMMET IS SECURELY WRAPPED AROUND THE PLATE LIP.

  4. BOLT THE STARLINK WEDGE BASE TO THE TOP PLATE (1) USING THE 4 BOLTS PROVIDED (6) . THE BOLTS ARE INSTALLED FROM THE BOTTOM UP TRAVELING FIRST THROUGH THE S.S. WASHERS (7) , THEN THE TOP PLATE (1) , THE STARLINK WEDGE BASE PLATE, THE PLASTIC WASHERS (5) , AND FINALLY INTO THE NYLOC NUTS (4) .

PROPRIETARY AND CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SEAVIEW. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF SEAVIEW IS PROHIBITED.

UNLESS OTHERWISE SPECIFIED

  • DIMENSIONS ARE IN INCHES
  • TOLERANCES:
  • FRACTIONAL
  • ANGULAR: MACH BEND
  • TWO PLACE DECIMAL .01
  • THREE PLACE DECIMAL .003

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SEAVIEW User Manuals

Related Manuals