SEAVIEW SP2P Deck Pods Installation Guide
- June 14, 2024
- SEAVIEW
Table of Contents
SEAVIEW SP2P Deck Pods Installation Guide
PARTS INCLUDED
TOOLS NEEDED
Installation Instructions
-
Place the base onto the mounting surface and mark the four bolt holes.
-
Drill the four marked holes
-
Using a hole saw drill a hole in the center for cables.
-
Peel off the sticky backing on the base gasket.
-
Apply the gasket to the bottom of the base
-
Place the base assembly onto the mounting surface.
-
Place the base assembly onto the mounting surface.
-
Place the large washer and base housing onto the base.
-
Insert the locking screw into the front of the body
-
Apply marine adhesive sealant as shown.
-
Assemble the inner backing plate, housing and base as shown.
-
Place the instrument template onto the pod face plate.
-
Trace the template with a pen.
-
Remove the template from the face plate.
-
Drill the mounting holes for your instrument. Follow the manufacturers instructions for this.
-
Use a jigsaw (10 TPI blade is recommended) and cut the line that you marked in step #19.
Pro Tip: Use masking tape around the area you plan to cut to avoid unwanted marks from the jigsaw.
-
Install the instrument and cables.
-
Install the rubber gasket and lid assembly on to housing.
Note that the rubber gasket may already be installed onto the front face plate.
-
Secure the housing with the eight M4x0.7x20mm bolts and washers.
-
To swivel the Deck Pod loosen the locking screw and rotate the Deck Pod. Tighten the locking screw to lock the Deck Pod in place.
OPTIONAL ACCESSORIES
Call 800-655-7922 or visit www.seaviewglobal.com for available accessories.
EUROPEAN OFFICE
Tel: +33 4 94 53 27 70
www.seaviewprogress.com
Tel:800-655-7922
www.seaviewglobal.com
References
- Seaview | Leaders In Mounting Solutions For Marine Electronics
- Profitez des meilleurs équipements pour votre bateau
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>