SEAVIEW SP2S1 Rail Pods Installation Guide

June 14, 2024
SEAVIEW

SEAVIEW SP2S1 Rail Pods

Product Information

Specifications:

  • Compatible Models: SP2S1, SP3S1, SP5S1
  • Recommended Sealant: Sudbury Elastomeric Marine Sealant
  • Sealant Purchase: Call 800-655-7922 or visit www.seaviewglobal.com
  • Tool Needed: Hole Saw (to drill a hole in the rail)
  • Recommended Blade: Jigsaw with 10 TPI (Teeth per Inch)
  • Bolt Sizes: M6 x 1 x 15mm, M4 x 0.7 x 20mm

FAQ:

  • Q: Where can I purchase Sudbury Elastomeric Marine Sealant?
    A: You can purchase Sudbury Elastomeric Marine Sealant by calling 800-655-7922 or visiting www.seaviewglobal.com.

  • Q: What type of blade is recommended for cutting with a jigsaw?
    A: We recommend using a jigsaw blade with 10 TPI (Teeth per Inch).

  • Q: How should I position the rubber gasket during assembly?
    A:
    Make sure the flaps of the rubber gasket are pulled over the outer edge of both pod housings.

  • Q: What are the contact details for Seaview’s European office?
    A:
    You can contact Seaview’s European office at +33 4 94 53 27 70 or visit their website at www.seaviewprogress.com.

For further assistance, please call 800-655-7922 or visit www.seaviewglobal.com

PARTS INCLUDED

SEAVIEW-SP2S1-Rail-Pods- \(1\)

TOOLS NEEDEDSEAVIEW-SP2S1-Rail-Pods- \(2\)
Sudbury Elastomeric Marine Sealant is recommended. To purchase call 800-655-7922 or visit www.seaviewglobal.com

INSTALLATION

  1. use a hole saw to drill a hole in your rail to pass the cables through.

  2. Use the appropriate grommet for your application, and place it on the rail. Be sure to align the opening in the grommet with the hole.

  3. Install the stainless steel clamp assembly as shown.

  4. Secure the clamp with the six M6x1x15mm bolts.

  5. Insert the large bolt and rubber ring into the housing as shown.

  6. Insert the second rubber ring onto the large bolt. Apply Loctite to the threads as shown.SEAVIEW-SP2S1-Rail-Pods- \(8\)

  7. Place the instrument template onto the lid.

  8. Trace the template with a pen.

  9. Remove the template from the lid.

  10. Drill the mounting holes for your instrument. Follow the manufacturer’s instructions for this.

  11. Use a jigsaw (10 TPI blade is recommended) and cut the line that you marked in step #8.
    Pro Tip: Use masking tape around the area you plan to cut to avoid unwanted marks from the jigsaw.

  12. Install the instrument and cables.

  13. Install the rubber gasket and lid assembly on to housing.
    Note: rubber gasket should already be applied to the front face plate .SEAVIEW-SP2S1-Rail-Pods- \(15\)

  14. Secure housing assembly with the M4 x 0.7 x20mm and washers.SEAVIEW-SP2S1-Rail-Pods- \(16\)

Tel: 800-655-7922
www.seaviewglobal.com

EUROPEAN OFFICE
Tel: +33 4 94 53 27 70
www.seaviewprogress.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals