ACV EVO S Retro Fit Mounting Plate Kit Instruction Manual

June 13, 2024
ACV

ACV EVO S Retro Fit Mounting Plate Kit

Product Information

  • Product Name: EVO S Retro-Fit Mounting Plate Kit
  • Model Numbers: 40, 60, 70 40P, 60P, 70P
  • Manufacturer : ACV U.K. Limited
  • Address : St. David’s Business Park, Dalgety Bay Fife, Scotland KY11 9PF
  • Contact : Tel: 0044 (0)1383 820100 | Website: www.acv.com/gb
  • UIN : 236073 A01

Product Usage Instructions

Fitting Instructions
When replacing any part on this appliance, use only spare parts that conform to the safety and performance specifications required by ACV. Do not use reconditioned or copied parts that have not been authorized by ACV. For the latest specifications and maintenance practices, visit the ACV website, and download the relevant information in PDF format.

IMPORTANT : Note to the installer – Leave these instructions adjacent to the gas meter.

Introduction
Before commencing installation, ensure that the mounting frame/s are placed on a flat and level floor. Prior to installing the boiler or headers, drill and fit the floor bolts (not provided) through the holes in the front of the frame feet. The ACV EVO S boiler requires the installation of the retrofit mounting plate to ensure proper alignment on the Ideal EVO S support frame. The retrofit mounting plate is necessary because the ACV EVO S boiler has a smaller footprint than the Ideal EVO S boiler and cannot fit without it.

Fitting the Retro-Fit
MOUNTING PLATE

  1. Isolate all flue, water, gas, and electrical services/supplies to the existing Ideal EVO S boiler.
  2. Remove the boiler from the frame using suitable lifting equipment to safely handle the boiler weight (Refer to Ideal EVO S Installation Manual).
  3. Install the retrofit mounting plate onto the two hooks on the support frame.
  4. Install the 2 x M6 self-drilling screws through the 2 holes into the support frame and fully tighten them.
  5. Install the ACV EVO S boiler onto the two locating hooks on the retrofit mounting plate.
  6. Reconnect all flue, water, gas, and electrical services/supplies to the ACV EVO S boiler.
  7. Follow all checks and procedures stated in the ACV EVO S Installation Manual Commissioning section.

Kit Contents

  • A – 1 x 40-70 kW Retro-Fit Mounting Plate
  • B – 1 x DN25-1 BSP Mac Union *
  • C – 2 x DN32 – 1 1/4 Gasket *
  • D – 2 x M6 Self Drilling Screw

These items are supplied to assist with the boiler retrofitting process.
Note : ACV pursues a policy of continuing improvement in the design and performance of its products. The right is therefore reserved to vary specifications without notice.

Fitting Instructions

When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specifications that we require. Do not use reconditioned or copied parts that have not been clearly authorized by ACV.
For the very latest copy of literature for specification and maintenance practices visit our website www.acv.com/gb where you can download the relevant information in PDF format.

IMPORTANT : NOTE TO THE INSTALLER: LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER.

INTRODUCTION

IMPORTANT : Before commencing installation, the mounting frame/s must stand on a flat and level floor. Before the boiler or headers are installed drill and fit the floor bolts (not provided) through the holes in the front of the frame feet.
Before you install the ACV EVO S boiler you must install the retrofit mounting plate.
The retrofit mounting plate will correctly align the ACV EVO S boiler on the Ideal EVO S support frame.

Note : The ACV EVO S boiler has a smaller footprint than the Ideal EVO S boiler, and will not fit without using the retrofit mounting plate.

KIT CONTENTS

  • Supplied to assist with the boiler retro-fitting process

FITTING THE RETRO-FIT MOUNTING PLATE

  1. Isolate all flue, water, gas, and electrical services/supplies to the existing Ideal EVO S boiler.
  2. Remove the boiler from the frame using suitable lifting equipment to safely handle the boiler weight. (Refer to Ideal EVO S Installation Manual).
  3. Install the retro-fit mounting plate onto the two hooks on the support frame.
  4. Install the 2 x M6 self-drilling screws through the 2 holes (as below) into the support frame fully tightened.
  5. Install the ACV EVO S boiler onto the two locating hooks on the Retrofit mounting plate.
  6. Reconnect all flue, water, gas, and electrical services/supplies to the ACV EVO S boiler.
  7. Do all the checks as stated in the ACV EVO S Installation Manual Commissioning section.

ACV U.K. Limited
St. David’s Business Park,
Dalgety Bay
Fife, Scotland
KY11 9PF
Tel: 0044 (0)1383 820100
www.acv.com/gb
ACV pursues a policy of continuing improvement in the design and performance of its products. The right is therefore reserved to vary specifications without notice.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals