TRANE FIABARM002 Precedent Packaged Rooftop Units Instruction Manual
- June 13, 2024
- Trane
Table of Contents
- TRANE FIABARM002 Precedent Packaged Rooftop Units
- Product Information
- SAFETY WARNING
- Introduction
- General Information
- Installation Damper Shipped with Unit
- Installation Damper Shipped Separately
- Install Damper into Unit
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
TRANE FIABARM002 Precedent Packaged Rooftop Units
Product Information
- Product Name: Barometric Relief Damper
- Model Number: FIABARM002**
- Compatible with: T/YSJ072-150A PrecedentTM Packaged Rooftop Units.
SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air- conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the equipment.
Introduction
Read this manual thoroughly before operating or servicing this unit.
Warnings, Cautions, and Notices
Safety advisories appear throughout this manual as required. Your personal safety and the proper operation of this machine depend upon the strict observance of these precautions.
The three types of advisories are defined as follows:
WARNING: Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
CAUTION: Indicates a potentially hazardous situation which, if not
avoided, could result in minor or moderate injury. It could also be used to
alert against unsafe practices.
NOTICE: Indicates a situation that could result in equipment or property-
damage only accidents.
Important Environmental Concerns
Scientific research has shown that certain man-made chemicals can affect the earth’s naturally occurring stratospheric ozone layer when released to the atmosphere. In particular, several of the identified chemicals that may affect the ozone layer are refrigerants that contain Chlorine, Fluorine and Carbon (CFCs) and those containing Hydrogen, Chlorine, Fluorine and Carbon (HCFCs). Not all refrigerants containing these compounds have the same potential impact to the environment. Trane advocates the responsible handling of all refrigerants-including industry replacements for CFCs and HCFCs such as saturated or unsaturated HFCs and HCFCs.
Important Responsible Refrigerant Practices
Trane believes that responsible refrigerant practices are important to the environment, our customers, and the air conditioning industry. All technicians who handle refrigerants must be certified according to local rules. For the USA, the Federal Clean Air Act (Section 608) sets forth the requirements for handling, reclaiming, recovering and recycling of certain refrigerants and the equipment that is used in these service procedures. In addition, some states or municipalities may have additional requirements that must also be adhered to for responsible management of refrigerants. Know the applicable laws and follow them.
WARNING: Proper Field Wiring and Grounding Required!
Failure to follow code could result in death or serious injury. All field wiring MUST be performed by qualified personnel. Improperly installed and grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these hazards, you MUST follow requirements for field wiring installation and grounding as described in NEC and your local/state/national electrical codes.
WARNING: Personal Protective Equipment (PPE) Required!
Failure to wear proper PPE for the job being undertaken could result in death or serious injury. Technicians, in order to protect themselves from potential electrical, mechanical, and chemical hazards, MUST follow precautions in this manual and on the tags, stickers, and labels, as well as the instructions below:
- Before installing/servicing this unit, technicians MUST put on all PPE required for the work being undertaken (Examples; cut resistant gloves/sleeves, butyl gloves, safety glasses, hard hat/bump cap, fall protection, electrical PPE and arc flash clothing). ALWAYS refer to appropriate Safety Data Sheets (SDS) and OSHA guidelines for proper PPE.
- When working with or around hazardous chemicals, ALWAYS refer to the appropriate SDS and OSHA/GHS (Global Harmonized System of Classification and Labeling of Chemicals) guidelines for information on allowable personal exposure levels, proper respiratory protection and handling instructions.
- If there is a risk of energized electrical contact, arc, or flash, technicians MUST put on all PPE in accordance with OSHA, NFPA 70E, or other country-specific requirements for arc flash protection, PRIOR to servicing the unit. NEVER PERFORM ANY SWITCHING, DISCONNECTING, OR VOLTAGE TESTING WITHOUT PROPER ELECTRICAL PPE AND ARC FLASH CLOTHING. ENSURE ELECTRICAL METERS AND EQUIPMENT ARE PROPERLY RATED FOR INTENDED VOLTAGE.
WARNING: Follow EHS Policies!
Failure to follow instructions below could result in death or serious injury.
- All Trane personnel must follow the company’s Environmental, Health and Safety (EHS) policies when performing work such as hot work, electrical, fall protection, lockout/tagout, refrigerant handling, etc. Where local regulations are more stringent than these policies, those regulations supersede these policies.
- Non-Trane personnel should always follow local regulations.
Copyright
This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
Trademarks
- All trademarks referenced in this document are the trademarks of their respective owners.
General Information
Inspection
- Unpack all components of the kit.
- Check carefully for shipping damage. If any damage is found, report it immediately, and file a claim against the transportation company.
- Visually inspect the components for shipping damage as soon as possible after delivery, before it is stored. Concealed damage must be reported within 15 days.
- If concealed damage is discovered, stop unpacking the shipment.
- Do not remove damaged material from the receiving location. Take photos of the damage, if possible. The owner must provide reasonable evidence that the damage did not occur after delivery.
- Notify the carrier’s terminal of damage immediately by phone and by mail. Request an immediate joint inspection of the damage by the carrier and the consignee.
Note: Do not attempt to repair any damaged parts until the parts are inspected by the carrier’s representative.
Parts List
- One (1) Barometric Relief Hood
- One (1) Duct Cover with Barometric Relief Cutout
- One (1) Barometric Relief Blade
- One (1) Mist Eliminator
- One (1) Rain Shield
- Ten (10) Screws
Installation Damper Shipped with Unit
WARNING: Hazardous Voltage!
Failure to disconnect power before servicing could result in death or serious injury. Disconnect all electric power, including remote disconnects before servicing. Follow proper lockout/tagout procedures to ensure the power can not be inadvertently energized. Verify that no power is present with a voltmeter.
- See Figure 1,through Figure 7.
- Remove 1 and pull off the clear film.
- Remove the packaged assembly of 2, 3, 4, 5, and 6.
- Remove the two screws (7) that hold 2, 3, and 4 to 5 and 6.
- Remove the screw 8 holding 2, 3, and 4 together.
- Remove the screw 9 holding 5 and 6 together.
- Attach 2 to 4, and 5 to 6. The results are the assembled rain shield 10 and internal hood 11 shown in Figure 4.
- Remove screw 12.
- Attach 11 to 1 as shown.
Installation Damper Shipped Separately
- Separate 10 (and 3) from the assembly of 1 and 11.
- Insert 3 into 10 and make sure that 3 is properly seated.
- Attach 10 to 1 as shown.
Install Damper into Unit
WARNING: Hazardous Voltage!
Failure to disconnect power before servicing could result in death or serious injury. Disconnect all electric power, including remote disconnects before servicing. Follow proper lockout/tagout procedures to ensure the power can not be inadvertently energized. Verify that no power is present with a voltmeter.
Important: If there is an economizer:
- There may be a duct blockoff plate already installed or ready to be installed in the opening 13. The blockoff plate must be removed if a barometric relief damper is used. Remove it or do not install it.
- Confirm the economizer is in the open position 14 before installing the barometric relief damper.
- If necessary, remove the existing duct cover from the unit.
- Attach the assembly to the unit using six screws.
Trane and American Standard create comfortable, energy efficient indoor environments for commercial and residential applications. For more information, please visit trane.com or americanstandardair.com. Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>