TRANE BAYHZCN300 Horizontal Economizer Conversion Kit Instruction Manual
- June 13, 2024
- Trane
Table of Contents
Installation Instructions
Horizontal Economizer Conversion Kit
Packaged Rooftop Units
*12.5 to 25 Tons
Model Number:
BAYHZCN300
**
Used With:
E/GCC180-300
T/YS180-300, T/YH180-300, T/YZ150-300, W/D/G**180-300
SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air- conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the equipment.
Warnings, Cautions, and Notices
Read this manual thoroughly before operating or servicing this unit. Safety
advisories appear throughout this manual as required. Your personal safety and
the proper operation of this machine depend upon the strict observance of
these precautions.
The three types of advisories are defined as follows:
WARNING
Indicates a potentially hazardous situation which, if not avoided, could
result in death or serious injury.
CAUTION
Indicates a potentially hazardous situation which, if not avoided, could
result in minor or moderate injury. It could also be used to alert against
unsafe practices.
NOTICE
Indicates a situation that could result in equipment or property-damage only
accidents.
Important Environmental Concerns
Scientific research has shown that certain man-made chemicals can affect the
earth’s naturally occurring stratospheric ozone layer when released to
theatmosphere. In particular, several of the identified chemicals that may
affect the ozone layer are refrigerants that contain Chlorine, Fluorine and
Carbon (CFCs) and those containing Hydrogen, Chlorine, Fluorine and Carbon
(HCFCs). Not all refrigerants containing these compounds have the same
potential impact to the environment. Trane advocates the responsible handling
of all refrigerantsincluding industry replacements for CFCs such as HCFCs and
HFCs.
Important Responsible Refrigerant Practices
Trane believes that responsible refrigerant practices are important to the
environment, our customers, and the air conditioning industry. All technicians
who handle refrigerants must be certified according to local rules. For the
USA, the Federal Clean Air Act (Section 608) sets forth the requirements for
handling, reclaiming, recovering and recycling of certain refrigerants and the
equipment that is used in these service procedures. In addition, some states
or municipalities may have additional requirements that must also be adhered
to for responsible management of refrigerants. Know the applicable laws and
follow them.
WARNING
Proper Field Wiring and Grounding Required!
Failure to follow code could result in death or serious injury. All field
wiring MUST be performed by qualified personnel. Improperly installed and
grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these
hazards, you MUST follow requirements for field wiring installation and
grounding as described in NEC and your local/state/national electrical codes.
WARNING
Personal Protective Equipment (PPE) Required!
Failure to wear proper PPE for the job being undertaken could result in death
or serious injury. Technicians, in order to protect themselves from potential
electrical, mechanical, and chemical hazards, MUST follow precautions in this
manual and on the tags, stickers, and labels, as well as the instructions
below:
-
Before installing/servicing this unit, technicians MUST put on all PPE required for the work being undertaken (Examples; cut resistant gloves/ sleeves, butyl gloves, safety glasses, hard hat/bump cap, fall protection, electrical PPE and arc flash clothing). ALWAYS refer to appropriate Safety
Data Sheets (SDS) and OSHA guidelines for proper PPE. -
When working with or around hazardous chemicals, ALWAYS refer to the appropriate SDS and OSHA/GHS (Global Harmonized System ofClassification and Labeling of Chemicals) guidelines for information on allowable personal exposure levels, proper respiratory protection and handling instructions.
-
If there is a risk of energized electrical contact, arc, or flash, technicians MUST put on all PPE in accordance with OSHA, NFPA 70E, or other countryspecific requirements for arc flash protection, PRIOR to servicing the unit.
NEVER PERFORM ANY SWITCHING, DISCONNECTING, OR VOLTAGE TESTING WITHOUT PROPER
ELECTRICAL PPE AND ARC FLASH CLOTHING. ENSURE ELECTRICAL METERS AND EQUIPMENT
ARE PROPERLY RATED FOR INTENDED VOLTAGE.
WARNING
Follow EHS Policies!
Failure to follow instructions below could result in death or serious injury.
- All Trane personnel must follow the company’s Environmental, Health and Safety (EHS) policies when performing work such as hot work, electrical, fall protection, lockout/tagout, refrigerant handling, etc. Where local regulations are more stringent than these policies, those regulations supersede these policies.
- Non-Trane personnel should always follow local regulations.
Copyright
This document and the information in it are the property of Trane, and may not
be used or reproduced in whole or in part without written permission. Trane
reserves the right to revise this publication at any time, and to make changes
to its content without obligation to notify any person of such revision or
change.
Trademarks
All trademarks referenced in this document are the trademarks of their
respective owners.
Revision History
Updated Used With information on front cover.
Inspection
- Unpack all components of the kit.
- Check carefully for shipping damage. If any damage is found, report it immediately, and file a claim against the transportation company.
- Visually inspect the components for shipping damage as soon as possible after delivery, before it is stored. Concealed damage must be reported within 15 days.
Note: Do not attempt to repair any damaged parts until the parts are inspected by the carrier’s representative.
Parts List
Table 1. Parts list
Qty | Description |
---|---|
1 | Return Air Damper Assembly |
– | Screws |
1 | Installation Instructions Guide |
Installation
WARNING
Hazardous Voltage w/Capacitors!
Failure to disconnect power and discharge capacitors before servicing could
result in death or serious injury. Disconnect all electric power, including
remotedisconnects and discharge all motor start/run capacitors before
servicing.
Follow proper lockout/ tagout procedures to ensure the power cannot be
inadvertently energized. Verify with a CAT III or IV voltmeter rated per NFPA
70E that all capacitors have discharged.
-
Remove horizontal return duct cover.
Note: The outdoor air damper assembly panel/ side panel does not need to be removed in order to install this assembly. It has been hidden in the following figures for better visualization of the installation steps. -
Attach connecting rod assembly to outdoor damper using two screws. See Figure 2.
-
Attach return air damper assembly to top and bottom flanges of return opening using six screws. See Figure 3.
-
Attach connecting rod to return air damper using three screws.
Trane and American Standard create comfortable, energy efficient indoor
environments for commercial and residential applications. For more
information, please visit trane.com or americanstandardair.com.
Trane and American Standard have a policy of continuous product and product
data improvement and reserve the right to change design and specifications
without notice. We are committed to using environmentally conscious print
practices.
ACC-SVN170F-EN 15 Apr 2023
Supersedes ACC-SVN170E-EN (Dec 2022)
©2023
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>