FRYMASTER FQE30 2-Vat 3000 Fryers Instructions

June 12, 2024
FRYMASTER

FRYMASTER - Logo

Instruction Sheet
Follow these instructions to install a solid shortening heater kit 8263782 in FQE30 2-Vat 3000 fryers.

FQE30 2-Vat 3000 Fryers

  1. Disconnect power cord from power source before removing any panels from the equipment. Remove the fryer from the hood to gain access to the front and back of the unit.

  2. Remove lower back. It is recommended to also remove doors and cabinet sides for ease of access.

  3. Locate and remove ATO box cover and carefully disconnect wiring from ATO Pump (Figures 1 & 2).
    FRYMASTER FQE30 2 Vat 3000 Fryers - Product Overview 1

  4. Locate and remove splash guard Fig 3 from bottom rear of system (Fig 3)
    FRYMASTER FQE30 2 Vat 3000 Fryers - Product Overview 2

  5. Disconnect ATO flex line from ATO check valve at the return manifold (Fig 4).

  6. Remove check valve assembly from the oil manifold and plug (Fig 5).

  7. Reinstall ATO box cover from step 3, then remove the wire shield cover from the rear of the box. (Fig 6)
    FRYMASTER FQE30 2 Vat 3000 Fryers - Product Overview 5

  8. Disconnect the ATO probe connections from the top row of the ATO board, This will be the 4 pin connections, and replace with resistor jumpers from the kit. Reinstall shield cover from step 7.

  9. Remove the controller from the far left control box. Using the wiring diagram on the last page, feed the 1080490 harness through the rear of the far left control box. Attach the harness to T1 & T2 and allow the C2 connector to remain on rear. Attach the other end of the connector from the heater strips to the C2 connector. Fig 7

  10. Mount handy boxes in location shown on rear of contactor boxes above the power cords (Figure 7).
    FRYMASTER FQE30 2 Vat 3000 Fryers - Product Overview 6

  11. Using one of the 36-inch heaters from the kit and a length of foil tape, add heater to bottom side of manifold, wrapping extra length around the ends and over the top securing in place with foil tape. (Figure 7).

  12. Wrap all flex lines and filter pump using foil tape to retain tightly around oil line. While it may not be shown well in illustration, ALL check valves and return valve bodies must  also be covered in heater strips (Figures 8 & 9).

  13. Reinstall splash guard from (Figure 3).
    Using Wago Connectors
    Wago connectors allow stripped wires (3mm) to be cleanly connected. They are easy to use:
    1. Life completely the orange lever. It will stay upright.
    2. Insert stripped wires.
    3. Close orange levers.

  14. Remove JIB cradle and install factory shipping brace if available (Figure 10).

  15. Route all wires toward handy boxes and cover wires in sleeving.

  16. Use Wago terminal blocks to wire up heaters according to diagram.

  17. When all heater tapes have been attached and connected, position the fryer near the hood, apply power and test to ensure the heater tapes are functioning.

  18. Replace back on fryer.

FRYMASTER FQE30 2 Vat 3000 Fryers - Product Overview
11

FRYMASTER DEAN
8700 LINE AVENUE, SHREVEPORT, LA 71106
318-865-1711
800-551-8633
WWW.FRYMASTER.COM
EMAIL: FRYSERVICE@WELBILT.COM

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals