HORNBACH Drain box DN 50 Luxembourg Instructions
- June 9, 2024
- HORNBACH
Table of Contents
Mounting instruction
Ablauf Grundkörper
03700608 11/22 Rev. 00 Technical modifications reserved
1
Connection left Connection right
2
3
Substructure element
4
5
Edge insulation strips
6
7
8
9
10
Caution: Do not damage the sealing collar.
Utilisation:
– The correct fitting of the discharge element is to be checked.
– Suitable only for use indoor.
The relevant processing guidelines of all trades must be observed.
1 Can be used to compensate for height when installing substrate elements.
These substrate elements are to be provided by the customer (e.g. XPS, EPS).
The substructure must be chosen so that the top edge of the installation frame
is level with the screed. The top edge of the installation frame is not
allowed to project above the screed!
2 Fixing the installation frame in place by:
– Applying Flex tile adhesive to the entire surface area
– Applying tile adhesive to battens
– Applying standard mounting or construction adhesive at specific points
3 After the installation of the drain fitting, a leakage test must be carried
out.
4 The processing instructions of the sealing system are to be observed.
5 Remove the transparent cover and fold the sealing collar over the seal.
WESKO GmbH Sanitär- und Baubedarf • Illbruckstraße 1 • 34537 Bad Wildungen
T 05621 – 801-333 • F 05621 – 801-309 • info@wesko-sanitaer.de • www.wesko-sanitaer.de