HINKLEY 27094MB Chapel Hill Large Wall Mount Lantern Instruction Manual

June 9, 2024
HINKLEY

HINKLEY-27094MB-Chapel-Hill-Large-Wall-Mount-Lantern-
logo

HINKLEY 27094MB Chapel Hill Large Wall Mount Lantern

HINKLEY-27094MB-Chapel-Hill-Large-Wall-Mount-Lantern-product-
inmage

Assembly Instructions

start here

  1. Find a clear area in which you can work.

  2. Unpack fixture and glass from carton.

  3. Carefully review instructions prior to assembly.

  4. To start release mounting plate (A) from backplate (B) by removing ball knobs (F). Keep screws (K) in mounting plate

  5. Secure mounting plate (A) to junction box (J) using 8- 32″ screws (C)(not provided) Note: if mounting plate is bending due to ground screw drill a small relief hole in mounting surface to avoid plate bending

  6. Hook inspection cable (S) to mounting strap to support fixture during wiring

  7. Make all wiring connections using IS-18 provided

  8. Place backplate (B) over mounting plate (A). Secure backplate by slipping screws (K) through mounting holes (D) and replacing ball knobs (F)

SAFETY WARNING: READ WIRING AND GROUNDING INSTRUC-TIONS (I.S. 18) AND ANY ADDITIONAL DIRECTIONS. TURN POWER SUPPLY OFF DURING INSTALLATION. IF NEW WIRING IS REQUIRED, CONSULT A QUALIFIED ELECTRICIAN OR LOCAL AUTHORITIES FOR CODE REQUIREMENTS.

Make electrical connections from supply wire to fixture lead wires. Refer to instruction sheet (I.S. 18) and follow all instructions to make all necessary wiring connections.

Then refer back to this sheet to complete installation of this fixture.

  1. To begin fixture assembly secure scroll (R) and top cover (T) using knob (K) to fixture top (H)
  2. Secure bottom cover (X) using knob (K)Secure bottom cover (X) using knob ( )V
  3. Place larger glass panels (G) into bottom cage (Z)
  4. Secure bottom cage (Z) to middle cage (U) using screws (N)
  5. Secure smaller glass panels (Y) to middle cage (U) using glass clips (P) and screws (M)
  6. Secure fixture top (H) to middle cage (U) using water proof gasket (L) and screws (W)
  7. Fixture can now be powered on

I.S. 18 wiring grounding instructions

SAFETY WARNING: READ WIRING AND GROUNDING INSTRUCTIONS (IS 18) AND ANY ADDITIONAL DIRECTIONS. TURN POWER SUPPLY OFF DURING INSTALLATION. IF NEW WIRING IS REQUIRED, CONSULT A QUALIFIED ELECTRICIAN OR LOCAL AUTHORITIES FOR CODE REQUIREMENTS

wiring instructions

Indoor Fixtures

  1. Connect positive supply wire (A) (typically black or the smooth, unmarked side of the two-conductor cord) to positive fixture lead (B) with appropriately sized twist on connector – see Drawings 1 or 2.
  2. Connect negative supply wire (C) (typically white or the ribbed, marked side of the two-conductor cord) to negative fixture lead (D).
  3. Please refer to the grounding instructions below to complete all electrical connections
Outdoor Fixtures
  1. Connect positive supply wire (A) (typically black or the smooth unmarked side of the two-conductor cord) to positive fixture lead (B) with appropriately sized twist on connector — see Drawings 2 or 3.
  2. Connect negative supply wire (C) (typically white or the ribbed, marked side of the two-conductor cord) to negative fixture lead (D).
  3. Cover open end of connectors with silicone sealant to form a watertight seal.
    • If installing a wall mount fixture, use caulk to seal gaps between the fixture mounting plate (backplate) and the wall. This will help prevent water from entering the outlet box. If the wall surface is lap siding, use caulk and a fixture mounting platform specially.
  4. Please refer to the grounding instructions below to complete all electrical connections.

grounding instructions

Flush Mount Fixtures
For positive grounding in a 3-wire electrical system, fasten the fixture ground wire (E) (typically copper or green plastic coated) to the fixture mounting strap (M) with the ground screw (S) – see Drawing 1.
Note: On straps for screw supported fixtures, first install the two mounting screws in strap. Any remaining tapped hole may be used for the ground screw.

Chain Hung Fixtures
Loop fixture ground wire (E) (typically copper or green plastic coated) under the head of the ground screw (S) on fixture mounting strap (M) and connect to the loose end of the fixture ground wire directly to the ground wire of the building system with appropriately sized twist-on connectors – see Drawing 2.

Post-Mount Fixtures
Connect fixture ground wire (E) (typically copper or green plastic coated) to power supply ground with appropriately sized twist-on connector inside post. Cover open end of connector with silicone sealant to form a watertight seal – see Drawing 3.

IS200 Caulking Instructions

start here
After securing fixture to the wall it is recommended that the gap between the wall and the fixture backplate be sealed on the top and both sides, with a good quality waterproof caulk or silicone sealant (NOT INCLUDED) – see Drawing

After securing fixture in place it is recommended that the gap between the mounting top and fixture base be sealed with any good quality waterproof caulk or silicone sealant (not included). It is also recommended that a small bead of caulk or sealant be put under the ball knobs used to mount fixture – see Drawing 2.

HINKLEY-27094MB-Chapel-Hill-Large-Wall-Mount-
Lantern-07

HINKLEY 33000 Pin Oak Parkway, Avon Lake, OH 44012 800.446.5539 / 440.653.5500 hinkley.com

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals