peak design M-WM-AA-CH-WEB-1 Wall Mount Instructions

June 8, 2024
peak design

peak design M-WM-AA-CH-WEB-1 Wall Mount
peak design M-WM-AA-CH-WEB-1 Wall Mount

MOUNT INSTALLATION

  1. Select a mounting location. Wall Mount attaches with an adhesive back. See recommended mounting surfaces below.
    Smooth Surfaces
    (e.g. tile, metal, glass)
    Mount with no issues, prep with provided wipe.
    Porous Surfaces
    (e.g. drywall, painted walls, wood)
    Mount with caution. Removal may damage surface. Do not prep with provided wipe.

  2. If mounting on smooth surface, clean surface with the provided wipe. Allow 5 minutes to dry.

  3. Remove adhesive backing and attach to desired location. Press down firmly for 30 seconds. For proper bond, wait 24 hours before use.

Wait 24 hours before use.
Failure to wait a full 24 hours will result in a weak bond.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

peak design User Manuals

Related Manuals