HFCL ion4l3 Wi-Fi Solutions to Bridge Digital Divide User Guide

June 3, 2024
HFCL

ion4l3 Wi-Fi Solutions to Bridge Digital Divide
User Guide

ANYWHERE
EVERYWHERE

HFCL ion4l3 Wi Fi Solutions to Bridge Digital Divide-
Everywhere

Introduction

Thank you for choosing the IO’s Unlicensed Band Radio (UBR).
Enterprise Grade point-to-point and point-to-multipoint solution is optimally designed to support low to medium capacity enterprise applications in unlicensed 5 GHz spectrum for short and long range links.

Packaging Content

Mounting Kit

  1. Hood (1)
  2. M6 Hex Bolts with split washers (6)
  3. M6 Flange Nuts with serrations (4),
  4. M8 x 220 Bolts (2),
  5. Riveted U clamps (1),
  6. Pole clamp assembly (1),
  7. Pole clamp (1),
  8. Nuts M8 (4), M8 split washer (4) & M8 flat washers (4)

ion413 Specifications

Peak Throughput(aggregate) Up to 700 Mbps Aggregate UL/DL Throughput
MIMO 2X2
Modulation Upto 256 QAM
Channel Bandwidth 10/20/40/80 MHz
Wireless QoS 80211eWMM
Wireless Security WPA, WPA2, & 128-bit AES-PSK with hardware acceleration
Power Supply IEEE 802.3af Active PoE
Power Consumption (Max) <15 W
gPS Location GNSS-7 (GPS +GLONASS)
Antenna Type Integrated High Performance Dish Antenna
Antenna Gain 25 dBi
Management Standalone (via GUI) or through appliance-based EMS or cloud-based
Enclosure Dimensions 465 x 465 x 235 mm or 18.3 x 18.3x 9.25 inches
Weight 2 kg
Operating Temperature 0Cto 55C
Certifications CE, FCC, RoHS 3 0, IP67

Product Overview

HFCL ion4l3 Wi Fi Solutions to Bridge Digital Divide- Figure
2

Installation Set-up

The 2×2 UBR with integrated dish antenna has four studs on its backside for attaching the mounting bracket. The mounting bracket is designed in such a way that UBR can be mounted on the pole with the help of its attaching parts. It provides freedom of movement to the UBR for link alignment even after mounting.

  1. Use four M6 flange nuts and attach the hood with the UBR.
    Refer to the image below:HFCL ion4l3 Wi Fi Solutions to Bridge Digital
Divide- Figure 3 Note: Make sure that the cut in the hood aligns with lug connector.

  2. Attach pole clamp assembly with riveted U clamp with the help of three M6 hex bolts and split spring lock washers.

  3. Mount this assembly from the previous step on UBR using three M6 hex bolts and split spring lock washers

  4. Once UBR is assembled, the next step is to mount on the pole using two MS x 220 bolts and four split spring lock washers and flat washers.HFCL ion4l3 Wi Fi Solutions to Bridge Digital Divide- Figure 6

  5. Slightly loosen M6 bolts, rotate brackets to align the pointer mark, at an optimum angle to set the azimuth and elevation. Once the desired setting is attained, securely tighten the six bolts using a compatible spanner.HFCL ion4l3 Wi Fi Solutions to Bridge Digital Divide- Figure 7

Getting the ion413 Online

Step 1: Power up
UBR can be powered up using PoE adaptor (48V) as shown below:

HFCL ion4l3 Wi Fi Solutions to Bridge Digital Divide- Figure
8

Note: For powering on UBR, only use HFCL POE adapter. Plug and Adaptor will vary by country/ region.

Step 2: Login and Configure the UBR
Follow the steps mentioned below and connect UBR to a network

  1. Connect ethernet cable to the laptop/computer

  2. Connect the other end of ethernet cable to the data port on PoE adapter

  3. Connect UBR’s PoE supported ethernet port to PoE adapter power port. Device will be powered onHFCL ion4l3 Wi Fi Solutions to Bridge Digital Divide- Figure 9

  4. Open web browser and enter “UBR IP address” in the address bar. The default static IP address for 2×2 UBR is set to “192.168.1.1”

  5. A login screen will appear

  6. Enter the default login credential details:
    User- admin, Password- HFcl!@23#ionHFCL ion4l3 Wi Fi Solutions to Bridge
Digital Divide- Figure 10

  7. Refer our user manual on our website io.hfcl.com for detailed information to configure UBR

Step 3: Check the LED status

HFCL ion4l3 Wi Fi Solutions to Bridge Digital Divide- Figure
11

LED Color Status

Green LED
(Power indication)| Green color notifies the user that the device is powered ON
BLUE LED
(RSSI/Link indication)| Single blink: -1 to -50 dBm
Double blink: -51 to -60 dBm
Triple blink: Greater than -60 dBm
NOTE – If [ink is down, then link LED will be in continuous OFF state
BLUE LED
(Alarm Indication)| Single blink: Minor Alarms
Double blink: Major Alarms
Triple blink: Critical Alarms

NOTE – During Reboot and Factory Reset, all the three LEDs will glow for 7 secs and the power LED will continue to glow

Safety Precautions

Observe following safety precautions to avoid damage to the ion413 UBR

Do not power the device during installation
Do not subject the device to high temperatures
Keep away from high voltage cables
Do not power off the unit in the middle of an upgrade process
The gland should be ground facing all the time
Make sure the earthing wire is connected properly to the earthing points
Do not open the enclosure when the UBR is working
Fasten the device tightly

Contact Us:
Email: iosupport@hfcl.com
Website: www.hfcl.com
wwwio.hfcl.com
8, Commercial Complex, Masjid Moth,
Greater Kailash-II, New Delhi- 110048
Part Number: QSG-02-0007
Revision: A
HFCL Limited All Rights Reserved.
IO Networks and the IO logo are registered trademarks of HFCL Limited
Specifications are subject to change without notice

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals