BYD DS5K0AF00-I Battery Box LV5.0 Battery Module User Guide
- August 23, 2024
- BYD
Table of Contents
BYD DS5K0AF00-I Battery Box LV5.0 Battery Module User Guide
Configure the Battery System
LV5.0 is equipped with Bluetooth and WIFI function. Through the mobile APP, you can realize intelligent battery management, including remote data monitoring, firmware upgrade and troubleshooting.
Download the APP ” BYD Energy”
Configuration steps:
For detailed configuration steps, please refer to the user manual and APP instructions, Website: www.bydenergy.com.
Scalability
One tower could be made up by 1 to 4 battery modules, and 8 towers could be connected in parallel at most.
Safety
IMPORTANT SAFETY INSTRUCTIONS
The battery module has been designed and tested in accordance with international safety requirements. However, in order to prevent personal injury and property damage and ensure long-term operation of the battery module, please read this section carefully and observe all safety information at all times.
Battery Module Leakage
If the battery modules leak electrolytes, contacting with the leaking liquid
or gas should be avoided. The electrolyte is corrosive, and the contact may
cause skin irritation and chemical burns. If one is exposed to the leaked
substance, follow these steps:
Accidental inhalation: Evacuate the contaminated area, and seek medical help
immediately.
Eye exposure: Rinse eyes with flowing water for 15 minutes and seek medical
help immediately.
Skin contact: Wash the affected area thoroughly with soap and water and seek
medical help immediately.
Accidental ingestion: Induce vomiting and seek medical help immediately.
Fire fighting Measures
The battery modules may catch fire when it is put into the fire. In case of
fire, please make sure that an ABC or carbon dioxide extinguisher is nearby.
Water cannot be used to extinguish the fire.
Full protective clothing and self-contained breathing apparatus are required
for the firefighters to extinguish the fire.
Battery Modules Handling and Storage Guide
- The battery module and its components should be protected from damage when transporting and handling.
- Do not impact, pull, drag, or step on the battery module.
- Do not insert unrelated objects into any part of the battery module.
- Do not throw the battery module into a fire.
- Do not soak the battery module in water or seawater.
- Do not expose to strong oxidizers.
- Do not short circuit the battery module.
- The battery module cannot be stored at high temperatures ( ≥ 50°C).
- The battery module cannot be stored directly under the sun.
- The battery module cannot be stored in a high humidity environment.
- Do not use the battery module if it is defective, or appears cracked, broken or other wise damaged, or fails to operate.
- Do not attempt to open, disassemble, repair, tamper with, or modify the battery modules. The battery modules are not user-serviceable.
- Do not use cleaning solvents to clean the battery module.
Battery Module Overview
Structure Dimension Drawing
Battery Module Description
*1. DC Connector & Inverter Cable length need to be customized, please contact your distributor.
-
- Data Cable is suitable for the tower (2~4 modules).
-
- PE Link must be used for more than one battery module.
Requirements for Installation
Scope of Delivery
Tools & Additional Accessories (not included in the scope of delivery)
Safety Gear
Installation Scene
Note:Battery module must be installed indoors instead of outdoors.
Floor Installation
-
Open the box, take out battery module and accessories.
-
Install the feet to the battery module. When stacking 2 or more modules, only the bottom one installs the foot.
-
Adjust the feet to ensure that the battery remains horizontal ( Tilt is not allowed! ).
-
Put the battery module along the wall, and keep a distance of 0~63 mm.
Preparation for Wiring
DC Connection ( DC cable 16mm²/ OT 16mm² -M6 / Heat Shrink Tubing R6 )
Data Cable Connection
- Connect the Battery Module and Inverter with Inverter cable into INV port.
- Data cable is connected between the battery modules in the tower.
Connecting the PE
Battery module & tower require only one grounding wire.
Floor Installation
Protective Cover Installation
SET-UP Topology
Operation
Requirements:
- After the battery and inverter are installed, *the equipment starts up in this order: Battery →Switch→ Inverter.**
-
Turn on the air switch between battery and inverter if there is any.
Press the button, after 1s, the battery module or tower will be activated. Then they will match automatically. The green LED light indicates that the battery runs normally.- Press the button for around 2~3s to shut down the equipment, *the equipment shuts down in this order: Inverter → Battery→ Switch.**
-
Turn off the air switch between battery and inverter if there is any.
LED Signals
Copyright©2023 BYD Co., Ltd. All Rights Reserved.
BYD reserves the right to modify the technical datasheet and appearance of the
product in the catalog without prior advice to the users. No part of this
document can be copied or reproduced without BYD permission.
www.bydenergy.com
BYD Company Limited
+86-755-89888888
3009, BYD Road, Pingshan, Shenzhen, P.R.China
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>