HARVEST TEC 664BB 115 Gallon Preservative Applicator Instruction Manual
- June 3, 2024
- HARVEST TEC
Table of Contents
- HARVEST TEC 664BB 115 Gallon Preservative Applicator Instruction Manual
- Installation of Dual Channel Processor (DCP)
- Installation and Routing Wire Harnesses and Baler Interface Harness
- Pin Outs
- Power/Comm Harness 006-6650TM at Hitch
- Power/Comm Harness 006-6650LS at Hitch
- iPad Integration Control / BLE on Harness 006-6650TM
- 006-6650VA to DCP Whip
- 006-6650VA to 006-6650 LS
- 006-6650VA Harness to Baler Plug
- Main Power Connector on DCP
- Star Wheel and Bale Rate Sensor Connector on DCP
- End of Bale Sensor on DCP
- Pump Communication Plug on DCP
- Pump Connection Colors
- Flow Meter Connection on Pump Controller
- Connector for Crop Eyes on DCP
- Parts Breakdown
- Read More About This Manual & Download PDF:
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
HARVEST TEC 664BB 115 Gallon Preservative Applicator Instruction Manual
Introduction
Thank you for purchasing the 664BB Hay Preservative Applicator System. This
applicator system has been designed to plug directly into the baler’s ISOBUS
and display on the New Holland Intelliview 3 or Intelliview 4, Case Pro 300 or
Pro 700. As well as the option of operation through an Apple iPad (not
included) using the Hay App. The 664BB Preservative Applicator System offers
these advantages:
- Operation coordinated with baler operation
- Less cab clutter providing better visibility
- Ease of use with all information on one screen
- Records kept together
- The system is ready for future updates
This manual will take you through the steps for installing the update to the automatic applicator. If you are unsure about installing the system after consulting this manual, please contact your local authorized dealership for additional assistance. If you are in need of parts for the system please see the parts breakdown in the back of this manual and contact your local authorized dealer to order the parts. This applicator is designed to apply Harvest Tec buffered propionic acid. Right and Left sides are determined by facing in the direction of forward travel.
System Requirements
Made for iPad® running the current iOS operating system
or one version previous required for iPad option
iPad is a trademark of Apple Inc., registered in the U.S. and other countries.
600 Series Applicators with serial number before DCP27000 will require the DCP
to be sent to Harvest Tec for a required update in order to use the iPad
Integration Module (030-6672C).
*Hay App version must be at least 2.5.18 (or higher) to operate with the iPad Integration Module
If choosing to operate the unit though the ISOBUS monitor, pn 006-6670A will
need to be ordered through your local equipment dealer. 2018 Krone balers (and
beyond) Serial Number 976909 will need pn 006-6650VAK.
Tools Needed:
- Standard wrench set
- Side cutter
Installation of Dual Channel Processor (DCP)
The Dual Channel Processor (DCP) has the same bolt pattern as the Precision
Information Processor (PIP) you will be removing. The location of the main
controller does not change so use the same holes and install the new Dual
Channel Processor (DCP) in the same location with two 5/16” x 1” bolts, two
5/16” x 1-1/4” bolts, locks, fender washers and hex nuts. Mount the DCP/PIP
cover over the top of the DCP and secure with the hardware using the 5/16” x
1-1/4” bolts on the top with the DCP/PIP shield.
DCP or PIP Location
CNH Balers
Installation and Routing Wire Harnesses and Baler Interface Harness
Route harnesses along inside of the baler (figure 19). Keep harnesses away
from moving parts and hydraulic hoses. Secure with existing cable clamps or
use cable ties. When all connections are made to the DCP secure wires as shown
above to allow for water to be shed away from the DCP.
Locate and remove the Active Terminator of baler (figure 20 and 21). Attach
Baler Interface Harness (006-6650VA) to that location. Reconnect Active
Terminator to open port of that same harness (006-6650VA)
Installation of iPad Integration Control
Locate a safe location in the cab of the tractor to place the iPad Integration
Control (030-6672C). Recommended location is securely fastened out of the
operators way in a location that is close enough to reach with the iPad cord.
Connect the Power / Communication harness (006-6650TM(E)) to the bottom of the
receiver.
To operate the applicator, plug the iPad cord into the communication port
indicated by:
iPad Integration Control Light Signals
Green Slow Blink – Power supplied to the applicator system and the unit is
going through its startup process. This will take approximately 25-35 seconds.
Green Double Blink – Indicating the iPad module recognizes the iPad but the
app is not open or connected. Green Solid Light – Module is connected to the
app and is ready to operate.
*Recommended to use the USB cable included with the applicator kit (006-6672USBC)
Bluetooth Receiver Lights
Pre-2020 applcaitors equipped with Bluetooth receivers (030-6672B) are now
equipped with lights to indicate both power and Hay App connection on the
Apple iPad. Clean light regularly
Blinking Lights – System is waiting for the processor to connect, which could
take up to 35 seconds.
Red Light – The Bluetooth receiver has power
Green Light – The Bluetooth receiver is connected to the Hay App.
*600 Series Applicators with serial number before DCP27000 will require the
DCP to be sent to Harvest Tec for a required update in order to use the iPad
Integration Module (030-6672C).
Hay App version must be at least 2.5.18 (or higher) to operate with the iPad
Integration Module
Made for Apple iPad badge
Use of the Made for Apple iPad badge means that an accessory has been designed
to connect specifically to the Apple product(s) identified in the badge and
has been certified by the developer to meet Apple performance standards. Apple
is not responsible for the operation of this device or its compliance with
safety and regulatory standards.
Please note that the use of this accessory with an Apple product may affect
wireless performance.
Wiring Diagram
- A. The Baler Power/Communication Harness (006-6650LS) will attach to the open port of the Tractor Harness (006-6650TM) and run back to the Dual Channel Processor (006-6671LS). Connect the large plug of the Baler Power/Communication Harness (006-6650LS) to the bottom (shorter side) of the DCP.
- B. Attach the Baler Interface Harness (006-6650VA) in between the short whip cable hardwired to the DCP and the main Power/Communication Harness (006-6650LS). Make sure Active Terminator removed from the top of the baler processor is attached to Baler Interface Harness (006-6650VA).
- C. Install green terminator (006-5650Z) to the port labeled Modular Port on the Pump Controller (006-5672).
- D. Attach moisture and bale rate harness (006-7303HL) as well as the end of bale harness (006-7400BBEXT) to the DCP (006-6671LS).
- E. Attach Pump Control Harness (006-5650F3M) between Pump Controller (006-5672) and DCP (006-6671LS).
- F. Connect Keyed Power Extension harness (006-5650K) to a keyed power source.
- G. Connect the iPad Integration Control (030-6672C) to the Communication Harness (006-6650TM).
Note: The Optional Port and the Data Transfer Port are not used in this application.
Pin Outs
Power/Comm Harness 006-6650TM at Hitch
- Pin 1 Red +12V Power to TSD
- Pin 2 Red +12V Power to DCP
- Pin 3 Orange Keyed Power
- Pin 4 Gray Shield
- Pin 5 Green HT Can Low
- Pin 6 Yellow HT Can Hi
- Pin 7 Orange Can1 Hi
- Pin 8 Black Ground from TSD
- Pin 9 Black Ground from DCP
- Pin 10 Blue Can1 Low
Power/Comm Harness 006-6650LS at Hitch
- Pin 1 Red +12V Power to TSD
- Pin 2 Red +12V Power to DCP
- Pin 3 Orange Keyed Power
- Pin 4 Gray Shield
- Pin 5 Green HT Can Low
- Pin 6 Yellow HT Can Hi
- Pin 7 Orange Can1 Hi
- Pin 8 Black Ground from TSD
- Pin 9 Black Ground from DCP
- Pin 10 Blue Can1 Low
iPad Integration Control / BLE on Harness 006-6650TM
- Pin 1 Red +12V Power from DCP
- Pin 2 Black Ground from TSD
- Pin 3 Yellow HT Can Low
- Pin 4 Gray Shield
- Pin 5 Green HT Can Hi
- Pin 6 Orange Can1 Hi
- Pin 7 Blue Can1 Low
006-6650VA to DCP Whip
- Pin 1 Red Can Power
- Pin 2 Black Can Ground
- Pin 3 Yellow HT Can Hi
- Pin 4 Gray Shield
- Pin 5 Green HT Can Low
- Pin 6 Orange Can1 Hi
- Pin 7 Blue Can1 Low
006-6650VA to 006-6650 LS
- Pin 1 Red Can Power
- Pin 2 Black Can Ground
- Pin 3 Yellow HT Can Hi
- Pin 4 Gray Shield
- Pin 5 Green HT Can Low
- Pin 6 N/A
- Pin 7 N/A
006-6650VA Harness to Baler Plug
- Pin A N/A
- Pin B Red TBC Power
- Pin C N/A
- Pin D Gray TBC Ground
- Pin E Orange Can1 Hi
- Pin F Blue Can1 Low
Main Power Connector on DCP
- Pin 1 Red +12V Power from tractor
- Pin 2 Black Ground from tractor
- Pin 3 Orange Keyed power
Star Wheel and Bale Rate Sensor Connector on DCP
- Pin 1 Blue +12V Power
- Pin 2 Orange Ground
- Pin 3 Black Signal for sensor 1
- Pin 4 White Signal for sensor 2
- Pin 5 N/A
- Pin 6 N/A
- Pin 7 N/A
- Pin 8 Violet Star wheel input 1
- Pin 9 Brown Star wheel input 2
End of Bale Sensor on DCP
- Pin 1 Brown Sensor Power
- Pin 2 Blue Sensor Ground
- Pin 3 N/A
- Pin 4 Black Signal from Sensor
Pump Communication Plug on DCP
- Pin 1 Red +12V Can
- Pin 2 Red +12V Power
- Pin 3 Gray Shield
- Pin 4 Green Comm Channel OH
- Pin 5 Yellow Comm Channel OL
- Pin 6 Blue Comm Channel IH
- Pin 7 Orange Comm Channel IL
- Pin 8 Black Can Ground
- Pin 9 Black Power Ground
- Pin 10 N/A
Pump Connection Colors
- Pin 1 Black with Orange Stripe Pump 1 Ground
- Pin 2 Black with Green Stripe Pump 2 Ground
- Pin 3 Black with Yellow Stripe Pump3 Ground
- Pin 4 N/A
- Pin 5 Orange with Black Stripe Pump 1 Positive
- Pin 6 Green with Black Stripe Pump 2 Positive
- Pin 7 Yellow with Black Stripe Pump 3 Positive
Flow Meter Connection on Pump Controller
- Pin 1 White +5-12V Power
- Pin 2 Green Ground
- Pin 3 Brown Signal
- Pin 4 Black Shield
Connector for Crop Eyes on DCP
- Pin 1 Red +12V Power
- Pin 2 Black Ground
- Pin 3 White Signal
- Pin 4 N/A
Parts Breakdown
(Converting a 500 Series to a 600 Series)
Read More About This Manual & Download PDF:
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>